Original source · versioned page text
2019-11-12 Services & Organisation Committee Agenda
The original of this document is very large (11.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 12 NOVEMBER 2019 The Cooroy Sports Complex located at 35 Mary River Rd, Cooroy (Lot Plan 157MCH4833, 229SP246604, 204MCH976 and 1SP246688) and Marara St (Lot Plan 1SP242414), is a multi- sport complex, housing six community sporting groups and the Cooroy RV site (managed by the Cooroy Chamber of Commerce). The combined membership of the sporting clubs at this site is estimated to be approximately 1,300. The land ownership of the properties within the scope of the Draft Cooroy Sports Complex Master Plan is a mix of: State Owned land directly leased to the user group State Reserve for Recreation with Council as Trustee Council freehold Council under a Nomination of Trust. A previous Master Plan for the Cooroy Sports Complex was endorsed by Noosa Council in 2007. In 2019 Otium Planning Group was engaged by Council to develop Master Plans over both of these sites. The scope of each Master Plan was to consider: The Noosa Sport and Active Recreation Plan 2018 Vision and Principles The current configuration, capacity, usage and functionality of the sites The general community (especially the surrounding residents’) expectations and needs The needs across various sports and recreation users, including current and future tenants Emerging trends and issues Catchment areas and population demographic demands (present and future) Car parking and traffic movement/management requirements Relevant planning constraints and opportunities including environmental, flood immunity, land zonings, DA requirements etc. Current and proposed tenure arrangements Opportunities for sustainable facility outcomes The realities of the economic, social, environmental and legislative context of the time; and Grant opportunities for the implementation and funding of recommendations. The aim of each Master Plan is to provide a long term vision for each Complex, identifying what the site should look like and how it should function into the future. The Master Plans consider the 10 year period from 2020-2030 and guide the future sports infrastructure development and investment both by Council and the clubs through grant applications or club capital investments. 2 Initial Consultation Initial consultation with key stakeholders was undertaken from December 2018 to August 2019. The following table provides a summary of this consultation. Date Consultation method Key stakeholders Details engaged Dec 2018 – April User Group Surveys All recognised groups that Provided current 2019 have formal tenure within membership and facility the Plans’ scope area usage, identified underutilised areas. Dec 2018 – April Phone interviews with All state level Provided sports trends 2019 relevant state level organisations (SLOs) of analysis and any identified sporting organisations sporting groups located at projects, trends within a (SLOs) and review of either sports complex SLO strategic context their strategic and infrastructure plans Page 23 of 129
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.