Minor Change Existing Approval OPW25 0042 02 (As Published) · OPW25/0042.02
Guidelines: Swales, Bioretention Systems and Wetlands (Water by Design, 2009), all
conditions of approval, and the approved engineering drawings must be submitted to Council
prior to commencement of use.
38. A construction hold point with a council delegate shall be established once the bioretention
device underdrainage pipe work is installed. At the time of inspection, a sample of the
drainage layer, transition layer, and filtration media materials must be stockpiled onsite.
Laboratory results must be provided for the filter media which demonstrate that the media
complies with the specifications contained in the latest version of the “Guidelines for Soil
Filter Media in Bioretention Systems” (produced by the Facility for Advancing Water
Biofiltration) and that the minimum hydraulic conductivity specified on the approved
engineering plans will be achieved. In addition, laboratory results must be provided
demonstrating that the transition layer and drainage layer meet the following bridging criteria:
a. D15 (drainage layer) ≤ 5 × D85 (transition layer)
b. D15 (transition layer) ≤ 5 × D85 (filter media).
39. The drainage layer, transition layer, and filtration media materials must not be installed until
the catchment draining to the bioretention device has 70% groundcover as determined by
Council’s delegate.
Erosion and Sediment Control
40. Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection
Regulation 2019) must not be released from the site or to waters within the site, or be likely
to be released should rainfall occur, unless all reasonable and practicable measures are
taken to prevent or minimise the release and concentration of contamination. These
measures must be designed, implemented and maintained in accordance with “Best Practice
Erosion and Sediment Control” published by the International Erosion Control Association
(Australasian Chapter) (IECA, 2008), to the extent that such measures and practices are also
consistent with the following:
a. Minimise Erosion:
i. For areas of the site which drain to a sediment basin, implement drainage and
erosion control measures prior to rainfall which prevent or minimise rill erosion
and gully erosion
ii. For areas of the site which do not drain to a sediment basin, implement drainage
and erosion control measures prior to rainfall (including contingency measures)
which prevent or minimise erosion, including rain drop erosion, chemical erosion,
rill erosion and gully erosion
iii. Prior to the sealing of the plan of survey for the development, all site surfaces
must be effectively stabilised using methods which have achieved effective short-
term stabilisation and which will continue to achieve effective stabilisation in the
medium to long-term. For the purpose of this condition, an effectively stabilised
surface is defined as one that does not, or is not likely to result in visible evidence
of soil loss caused by sheet, rill or gully erosion or lead to sedimentation, or lead
to water contamination.
b. Manage concentrated stormwater flows
i. Prior to each rainfall event ensure concentrated stormwater flow paths are
provided with capacity in accordance with IECA (2008) Table 4.3.1 and are
structurally stable in all rainfall events for the following sources:
a) From stormwater catchments upslope of the area of disturbance which are
either stable or external to the site, ensure stormwater is diverted or
managed either:
I. around the site or through the site without causing erosion and
without contaminating the flow; or
Page 8 of 15
Document Set ID: 24555245
Version: 3, Version Date: 23/02/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval OPW25 0042 02 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 198 KB (small file)
- File type
No other editions are linked here.