Council archive · source document
Minor Change Existing Approval DBW23 0027 02 & OPW23 0050 02 (As Published) · OPW23/0050.02
OPW23/0050 - DEVELOPMENT PERMIT FOR OPERATIONAL WORKS (DRAINAGE, STORMWATER & EARTHWORKS) Approved Plans 1. Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date E01 C Earthworks Layout Plan, Prepared by Walsh 27 September 2023 Consulting Engineers E02 C Earthworks Sections Plan, Prepared by Walsh 27 September 2023 Consulting Engineers R01 C Roadworks and Basement Layout Plan, 27 September 2023 Prepared by Walsh Consulting Engineers R02 C Driveway Setout, Jointing and Details Plan, 27 September 2023 Prepared by Walsh Consulting Engineers D01 C Stormwater Drainage Layout Plan, Prepared by 27 September 2023 Walsh Consulting Engineers Currency Period 2. The Currency Period for this development approval lapses if the development has not substantially started by 12 January 2028, unless an application to extend the currency period is approved by Council. Site Specific Conditions 3. Prior to Council attending a pre-start meeting, the applicant is to provide to Council the location where excavated material is proposed to be transported for treatment of acid sulfate soils, and for final placement as fill. The location for final placement as fill is to have a lawful entitlement for the placement of the fill, with details to be provided to Council. Bonds 4. A site control and/or compliance bond of $10,000 is to be submitted to Council prior to the pre-start meeting. The pre-start meeting will only be held once Council's Construction Engineering Officer has confirmation that the bond monies have been received by Council. The bond will be refunded less any costs incurred by Council in ensuring compliance with these conditions or any additional inspections incurred for substandard work or work undertaken not in accordance with this permit. PRIOR TO COMMENCEMENT OF WORKS Engineering 5. All necessary approvals from external service providers (e.g. Unitywater) and external parties on which the development works are proposed have been obtained and a copy supplied to Council. 6. A condition report including photographs of the frontage of the site must be completed and submitted to council at the prestart meeting. 7. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. Page 6 of 15 Document Set ID: 24526146 Version: 4, Version Date: 11/02/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval DBW23 0027 02 & OPW23 0050 02 (As Published).pdfRelated documentApplication case desk ↗
Minor Change Existing Approval DBW23 0027 02 & OPW23 0050 02 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 194 KB (small file)
- File type
No other editions are linked here.