Council archive · source document
Minor Change Existing Approval DBW23 0027 02 & OPW23 0050 02 (As Published) · OPW23/0050.02
17. Electrical conduits or other services proposed to be installed within existing and proposed
road reserves under existing sealed carriageways, concrete pathways, concrete/sealed
driveways or significant vegetation must be installed by boring. Trenching is not permitted,
unless specifically approved by Council.
Roadworks
18. The installation and/or modification of any traffic signs, street signs, line marking and Raised
Reflective Pavement Markings (RRPMs) must be in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD). New or relocated signage must be installed using the VLok
installation system. All new signage must be Class 1 retroreflective material in accordance
with AS 1906.1, Retroreflective materials and devices for road traffic control purposes – Part
1: Retroreflective sheeting.
Pathways
19. All pathways must be constructed in accordance with the following requirements:
a. All footpath/cycleway must comply with Council’s Standard Drawing SEQ R-065.
b. All footpaths must be constructed with Holcim Product Code QS322FOX.
c. Provision must be made for disabled access at all kerb crossings associated with
pathways, in accordance with Council's current standards.
d. All paths must have a slip resistant surface.
e. Expansion and contraction joints must provide a flush finish. Installation of joints by
saw cutting is preferred to ensure a smooth ride for cyclists.
f. The required work includes any modifications to ensure the footpath finishes flush with
all existing service covers and the like, or alternatively these services are raised or
altered, so as not to create a pedestrian safety hazard.
(*Refer to Advisory Notes)
20. Pathways must:
a. terminate in a manner that ensures smooth transition to existing surfaces for public
safety.
b. be designed and constructed to comply with the Disability Discrimination Act (DDA),
Access to Premises Standard, Austroads and relevant sections of AS1428 Design for
access and mobility.
Site Access and Driveways
21. Driveway crossovers must be constructed in accordance with council’s Standard Drawings
RS-049 and RS-050.
22. Any existing, unnecessary or redundant property accesses must be removed, and the kerb,
footpath and verge area reinstated to match the existing footpath and/or verge treatments.
Unless written approval is obtained from Council prior to reinstatement works, all kerbs,
footpaths and verge areas are to be reinstated using the following materials:
a. Kerbs must be reinstated with Holcim Product Code QP3201KEL;
b. Footpaths must be reinstated with Holcim Product Code QS322FOX; and
c. Verge infills must be reinstated with Holcim Product Code QS322FOX.
(*Refer to Advisory Notes)
Page 8 of 15
Document Set ID: 24526146
Version: 4, Version Date: 11/02/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval DBW23 0027 02 & OPW23 0050 02 (As Published).pdfRelated documentApplication case desk ↗
Minor Change Existing Approval DBW23 0027 02 & OPW23 0050 02 (As Published).pdfRelated documentApplication case desk ↗
About this file
- File size
- 194 KB (small file)
- File type
No other editions are linked here.