12. Code Assessment
Performance outcomes Acceptable Outcomes
External Works and Infrastructure
PO14 AO14 Not applicable
Development is provided with external works— Where not already existing, the following No external works are proposed as part of the
infrastructure components are provided at the redevelopment of an existing use.
1. along the full extent of the frontage of the frontage of the site—
site to an appropriate standard having
regard to the specified function of the road; 1. full width sealed road;
and 2. concrete kerb and channel where
2. provided beyond the site’s frontage if appropriate;
required. 3. forming and grading to footpaths;
4. vehicular kerb and footpath crossings;
5. a constructed bikeway;
6. a constructed footpath;
7. a constructed carriageway;
8. required alterations to public utility
mains, services or installations;
9. construction of any required alterations
to public utility mains, services or
installations;
10. stormwater drainage works; and
11. installation of electrical conduits.