Original source · versioned page text
12. Code Assessment
Connectivity Table 8.2.2.3 - Criteria for assessable development (part)
Performance outcomes Acceptable outcomes
Connectivity
PO5 AO5 Complies
Development is designed and operated Development is designed and operated to The proposed hospice extension located outside the
to maintain and enhance connectivity maintain ecological linkages and maximise opportunity for site’s most environmentally sensitive areas including a
between and across ecologically connectivity and the movement of fauna by: large vegetation stand at the rear of the site. This
important areas and connecting habitat vegetation forms part of an ecological linkage with
and support unimpeded and safe 1. ensuring protection of wildlife refuges; adjoining premises.
movement of terrestrial and aquatic 2. maintaining vegetation in patches of the
fauna. greatest possible size and within the smallest
possible edge-to-area ratio;
3. enhancing connectivity through planting and
rehabilitation works, including across property
boundaries, to areas of national park, state
forest or reserve;
4. avoiding the creation of physical barriers and
safety hazards (such as roads,
pedestrian access and instream structures)
along and within the ecological linkage;
5. providing mitigation measures such as wildlife
movement infrastructure, fauna exclusion and
directional fencing, underpasses/overpasses
and traffic calming devices, signage and
lighting; and
6. where offsets are necessary, delivering offsets
that support and enhance ecological linkages.
Waterways and wetlands Table 8.2.2.3 - Criteria for assessable development (part)
Performance outcomes
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original