Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

12. Code Assessment

of 116

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Performance outcomes                                   Acceptable Outcomes
Geotechnical considerations                                                                                  Not applicable
PO3                                                    AO3.1
Earthworks do not result in geotechnical instability   Filling works are undertaken in accordance with       No earthworks are proposed as part of the

on-site or to nearby premises.                         Council’s Planning Scheme Policy PSP6                 development.

                                                       Engineering design standards - roads, drainage and
                                                       earthworks.




                                                       AO3.2                                                 As above
                                                       Where the filling is for residential, commercial or
                                                       industrial purposes the works comply with
                                                       Australian Standard - Guidelines for earthworks on
                                                       commercial & residential development.
Log in to download the original file

12. Code Assessment.pdf · 862 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.