Skip to the record
Search everything, all in one place.

Original source · versioned page text

12. Code Assessment

of 116

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Dams
PO12                                                AO12.1                                                   Not applicable
Dam location and construction does not impact       Where the site is in the Rural zone—
upon neighbouring properties or road reserves, in
terms of—                                                    1. the land has a slope of less than 25%
                                                                 (1:4);
         1. hydrology;                                       2. the earthworks including cut and fill
         2. alteration of existing overland flow                 batters and retaining walls are setback
             paths and patterns;                                 a minimum of 50 metres from the
         3. landslide or failure of dam wall; and                property boundary; and
         4. effluent disposal areas.                         3. the size of the lot is greater than 5
                                                                 hectares.



                                                    AO12.2
                                                                                                             No applicable
                                                    Where the site is in the Rural residential zone or the
                                                                                                             No dams are proposed as part of the development
                                                    Rural zone and the lot is less than 5 hectares:


                                                             1. the land has a slope of less than 1:6;
                                                             2. the earthworks including cut and fill
                                                                 batters and retaining walls are setback
                                                                 a minimum of 20 metres from the
                                                                 property boundary; and
                                                             3. the dam work involves less than
                                                                 500m³ of material.
Log in to download the original file

12. Code Assessment.pdf · 862 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.