Original source · versioned page text
12. Code Assessment
Performance outcomes Acceptable Outcomes
Regardless of the width of the easement,
vegetation adjoining easements must be separated
from the power pole or other infrastructure by a
distance at least equal to the maximum mature
height of the vegetation.
AO12.4 Not applicable
For power lines that connect to a premises, the
height of plant species at maturity provides for a 2
metre clearance below the power line.
AO12.5 Not applicable
With the exception of electricity infrastructure, trees All existing vegetation is proposed to be retained.
and large shrubs are located a minimum of—
1. 4 metres from street lamps;
2. 2 metres from stormwater catchment
pits; and
3. 2 metres from underground services
and utilities.
AO12.6
Complies
Plants are located to enable tradespersons to
Refer above
access, view and inspect service meters, such as
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original