Council archive · source document
07/0785 - MCU - Preliminary Building work assessable against the planning scheme [As Published] · 172007.785
INTEGRATED PLANNING ACT 1997
SEQ Regional Plan
For more information refer to schedute 2 of the
IP Requiation.
Refer to Chapter 2, part SA and schedule 10 of
the Integrated Planning Act 1997, and schedule
2 of the Regulatory Provisions for relevant
definitions.
Unless you answered “none of the above” to
Q20, the application requires assessment by the
Office of Urban Management (OUM).
. IDAS Assessment Checklist, Version 20, 2 April 2007
20. The application involves (tick applicable box/es) -
“oO {i) a material change of use of premises -
(a) in a Major Development Area in the Urban Footprint for -
D (i) an urban activity -
(1 inan area included in a structure plan where the IPA; section 3.1.6
applies;
(1 inan area not included in a structure plan where -
_ « the IPA, section 3.1.6 applies to the application for the material change
of use; or
« the premises exceeds 10,000m2; or
e the gross floor area (GFA) on the premises will exceed 10,000m2; or
+ impact assessment is required under the relevant planning scheme
CO (ii) intensive animal husbandry, or
C1 (iii) ‘tesidential development involving a rural residential purpose
(b) in the Regional Landscape and Rural Production Area for -
D) (i) anurban activity and not specified in section 2.4(2); or
1 (ii) residential development involving a rural residential purpose and not
specified in section 2.6(2)
(c) in the Rural Living Area for an urban activity and not specified in section 2.8(2);
(d) in the Investigation Area for -
CJ (i) anurban activity and not specified in section 2.10(2);
C1 (ii) residential development involving a rural residential purpose and not
specified in section 2.12(2); or
-[] (ili) intensive anima! husbandry
“D (ii) reconfiguring a tot-
On land in a Major Development Area in the Urban Footprint that is:
(a) notincluded in a structure plan; and
(b) not specified in section 3.1(2).
[1 (il) none of the above
Fisherles matters
For more information refer to schedule 2of the IP.
Regulation.
Unless you answered “none of the above” to
Q21, the application requires assessment by the
Department of Primary Industries and Fisheries
(OPI8F).
If an agency other than OPI&F is the assessment
manager for the application, DPI8F is a
concurrence agency for the application in
relation to items {i) - (iv) and an advice agency
in relation to item (v).
The application involves: (tick the applicable box/es)
21,
C(i) anassessable material change of use for aquaculture - complete Part 0: of Form 1;
CL (ii) assessable operational work that is the construction or raising of a waterway barrier -
complete Part 03 of Form 1;
UD (iii) assessable operational work completely or partly within a declared fish habitat area.
complete Part O2 of Form 1;
((iv) assessable operational work that is the removal, destruction or damage of a marine
plant - complete Part O2 of Form 1;
{1 (v) development assessable under the IPA, schedule 8, part 1, on land that adjoins a
declared fish habitat area;
none of the above.
Rw)
‘Page 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0785 - MCU - Preliminary Building work assessable against the planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.