Council archive · source document
07/0785 - MCU - Preliminary Building work assessable against the planning scheme [As Published] · 172007.785
poo
* INTEGRATED PLANNING ACT 1997 Part E, Version 2.0, 4 October 2004
‘Ramibackaiivieiio-. . - , «fe
“Operational &/or building work be
~ assessable against a local government's planning scheme
Completion of all question on Part E is mandatory for all applications involving the assessment of operational work and/or building work (including detailed
engineering plans and other plans, detailed enginéering plans for subdivisional works and conceptual design plans for engineering & building work when the-appiication does
not involve assessment of a material change of use of premises at the same time) assessable against a local government's planning scheme.
Nature of the application ‘14; This application is for (tick one (4) or both it applicable).”
A develapment. permit authorises Preliminary approval = provid f
development to occur, while a preliminary a Hy astute, app provi fe details of the ype eo work eg. roadwork, stormwater, water and sewerage
approval is a step in the approval process >
© and does not authorise development to occur, {
The types of work that are assessable against
a planning scheme are determined by the AND/OR
sen ‘aly fora partis vere cal government and EX] Development permit - provide details of the type of work eg. roadwork, stormwater, water and sewerage
° : Infrastructure, etc.
To determine the types of work that are on . ;
assessable ander paula planning [ Siting relaxation of proposed deck in the front 6 metre sethack |
scheme, contact the relevant locat . .
goverment 2. Are the works subsequent to a previous development approval?
NO DD YES.- provide details of all previous approvals (eg. fie references} °
| Other than building approval” , |:
‘13. 18 the subdivision for a canal estate? ’
INO Cres
Portable Long Service Leave levy (if
4. Is payment of a Portable Long Service Leave (PLSL) levy applicable to the proposal?
applicable) TZ
LX -
Prior to issuing-a development permit for the YES ~ compete Q5
works, the assessment manager is required LINO - 05, 68 7co not apply
by taw to “sight" an approved form, issued by . .
Gleave, which 1 signifies that the PLSLlevy 5, Has the PLSL levy been paid? -
LI YES - completes
& NO - the applicable levy must be paid before a development permit can be given for the works
OF REcen f . 6. How much was naid?
{ TBA |
~AMAY @ 7007 7. What is the receipt number of the payment? oo, .
NOUSASHRE SOONER [ TBA es an |
PLEASE NOTE
This application cannot be accepted unless accompanied by Part A of Form 1.
The assessment manager may refuse to accept an application that, at the time of lodgement, fails to provide all applicable information,
requested by Part A and any other relevant part of Form 1.
: OFFICE USE ON LY {applicable to assessment manager)
REFERENCE
NUMBER/S
DATE RECEIVED
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/0785 - MCU - Preliminary Building work assessable against the planning scheme [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.