Skip to the record
Every meeting, every word.

Council archive · source document

07/0785 - MCU - Preliminary Building work assessable against the planning scheme [As Published] · 172007.785

of 30

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

: e ?
INTEGRATED PLANNING ACT 1997 (DAS Assessment Checklist, Version 20, 2 April 2007
Operational work that is tidal work or |9. The application involves operational work that is: (tick the applicable box/es)

work in np astal management district C1 (i) _ tidal work'® as defined under the Coastal Protection and Management Act 1995 (the

more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; oF .
local government idal areas refer {o Guide 24, Q (ii) tidal work that is prescribed tidal work" other than in a canal"? -complete Part P of Form 1; OT
the opcaton aunts socecementty the. 8. C1 iii) carried out within a coastal management district under the Coastal Act and’for - complete
Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) {0 (i) below are ticked, .

lf an agency other than EPA is the assessment C1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
manages for setae seston in other than those works in tidal water) where the development has beén determined not
relation to this matter. to be assessable against the Water Act 2000 ;

Local goverment is the assessment manager (1 (b) constructing a canal12 intended to be connected to tidal waters;

for all prescribed tidal work. . po .
, , (ec) constructing an artificial waterway;

C1 (a) reclaiming land under tidal water; , .
C1 (e) disposing of dredge spoil or other solid waste material in tidal water;
(1 (f)__ interfering with quarry material on State coastal land above high-water mark;

(1g) draining or allowing drainage or flow of water or other matter across State
coastal land above high-water mark;
(1 (h) removing or interfering with coastal dunes on land, other than State coastal and,
- _ thatis in an erosion prone area and above high-water mark;
(1 (i) constructing a bank or bund wall to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or

BJ (iv) none of the above.

 

Operational work below high water | 10. The application involves operational work that is: ( tick the applicable box/es)

 

 

mark information reter op Guide 18. For O (i) tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
more information about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
- loca government tidal areas refer to Guide 24 CO (ii) tidal work that is prescribed tidal work’ - complete Part P of Form 1; oF
G10, Ie application tine lewalion ° CO. (ii) carried out within a coastal management district" under the Coastal Act and for -
Queensland Transport (G7) (Martime Safety C1 (a) disposing of dredge spoil or other solid waste material in tidal water - complete Part
Qld) as a concurrence agency.
Local government is the assessment manager M of Form 1,
for all prescribed tidal work. (1 (b) reclaiming land under tidal water - complete Part M of Form 1; or
Oe) constructing a canal12, if the canal is associated with reconfiguring a lot -
complete Part M of Form 1; .

KX (iv) none of the above.

 

Coastal management 11. The application involves: (tick the applicable box/es) —

For mare Information refer to Guide 18, LC (i) a material change of use assessable under a planning scheme involving operational
Unless you answered “none of the above" to work carried out completely or partly in a coastal management district's

Q11, the application requires assessment by the . .
Environmental Protection Agency (EPA). (ii) a material change of use assessable under a planning scheme involving buildin

If an agency other than EPA is the assessment work, carried out completely or partly in a coastal management district that is -

manager for the application, EPA is a . . .

conourence agency for the application in « the construction of a new premises with a GFA" of atleast 1000m?

relation to this matter. « the enlargement of the GFA of existing premises by more than 1000m2.

[7] (iii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is s situated
completely or partly in a coastal management district

(J (iv) reconfiguring a fot'” assessable under schedule 8 of the IPA and in connection with
, the construction of a canal12 - complete Part M of Form 1

{4 (v) none of the above

 

 

10 Tidal work is defined in sch 10 of the IPA.

11 Prescribed tidal work is defined in the Coasta! Protection and Management Regulation 2003 and includes certain tidal works completely or parily wilhin a local government tidal area,

12 Canal means canal as defined under the Coastal Protection and Management Act 1995

13 Tidal work is defined in sch 10 of the IPA.

14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area,

15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coasta! Protection and Management Act 1995, other than an area declared as a
coastal management district under section 47(2) of that Act.

16 GFA is defined in sch 14 of the IPA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.

17 Under 117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the arlificial waterway.

Page 4

Used in these records

About this file

File size
2.3 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_0785 - MCU - Preliminary Building work assessable against the planning scheme [As Published].pdf · 2.3 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.