                          a. the full extent of the transition to the adjoining areas of verge.

            Refer to the updated drawing 060. You will note that the design is sympathetic to the
            existing site grading and there limited localised grading.

            On-site Manoeuvrability
               14. Provide an amended Turning Path Plan demonstrating that vehicles are able to
                   enter the proposed garages, manoeuvre on site, and exit the site in a forward
                   without colliding with any other vehicles, structures or future landscaping. The
                   additional detail must be prepared by a suitably qualified person (RPEQ –
                   Registered Professional Engineer of Queensland) and include, but not be
                   limited to:
                      a. the adjacent garage carpark must be occupied with a B99 vehicle
                          during the vehicle swept path analysis.

            Refer to the updated drawing 061 and 062.

            Stormwater Management
               15. Provide additional detail demonstrating how the rainwater collected in the
                   south-western corner of the on-site will be controlled, collected and released
                   without causing scour damage to neighbouring properties. The additional
                   detail must be prepared by a suitably qualified person (RPEQ – Registered
                   Professional Engineer of Queensland).

                    16. Provide sufficient detail to demonstrate that the development achieves
                        compliance with The Noosa Plan 2020 – Water Quality and Drainage Code and
                        Sustainable Building Design Code. The detail must be prepared by a suitably
                        qualified person (RPEQ – Registered Professional Engineer of Queensland).

            The Stormwater Management Plan has been amended to reflect a 3kL rainwater tank
            per dwelling as per the Sustainable Building Design and Water Quality and Drainage
            codes. Updated civil drawings also detail the design contours demonstrating no
            worsening of overland flows to adjacent properties.

            We believe that the above satisfactorily addresses the engineering matters raised in the
            information request however, should additional information be required, please contact
            our office directly.

            Yours faithfully,
            RECOR Pty Ltd

            Prepared by



            Ben Parry
            Civil Engineer
            BEng (Hons), MIEAust CPEng NER
            RPEQ: 28084



P +61 7 5211 1003           A 75 Noosa Dr, Noosa Heads Qld 4567   E [email protected]      recorconsulting.com
Log in to download the original file

RFI - Eng Response.pdf · 162 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.