Skip to the record
Every meeting, every word.

Original source · versioned page text

5.0 Proposal Plans

of 7

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                                                                              LANDSCAPE NOTES
                                                                                                                                                              PREPARATION OF GARDEN BEDS FOR PLANTING

                                                                                                                                                              CULTIVATE EXISTING SOIL IN NATURAL GROUND TO A MINIMUM
                                                                                                                                                              DEPTH
                                                                                                                                                              OF 150mm. IMPORT CLEAN TOPSOIL (SANDY LOAM) TO A MINIMUM
                                                                                                                                                              DEPTH OF 300mm, ABOVE ORIGINAL GROUND LEVEL. ORGANIC
                 TREES

                                                                                                                                                              MATTER OR GYPSUM ETC, MAY ALSO BE ADDED SOIL FOR THE
                                                                                                                                                              BEST POSSIBLE GROWTH TEST THE SOIL USING A 'SOIL TEST KIT'
                                                                                                                                                              TO ENSURE IT IS HEALTHY AND AMEND AS NECESSARY.
                                                                                                                                                              ALL GARDEN BEDS TO BE MOUNDED 300mm MIN AT CENTRE OF
                                                                                                                                                              BED, ABOVE FINISHED PAVEMENT LEVELS, TO PREVENT ANY
                                                                                                                                                              PONDING AROUND PLANTS.
                                                                                                                                                              FERTILIZE USING A SLOW RELEASE FERTILIZER IN 'PILL' OR
                                                                                                                                                              'GRANULE' FORM, AT TIME OF PLANTING. ENSURE THAT
                                                                                                                                                              FERTILIZER DOES NOT DIRECTLY CONTACT ROOTS.
                                                                                                                                                              INSTALL AN AUTOMATIC IRRIGATION SYSTEM WITH TIMER. PLACE
                                    Elaeocarpus obovatus                                                                                                      IRRIGATION LINE AFTER PLANTING & PRIOR TO MULCHING.
                                                                                                                                                              USE ONLY SUN 'HARDENED' PLANTS. ENSURE HEALTHY ROOT
                                                                                                                                                              SYSTEM TO ALL PLANTS TO BE USED. UNDER NO
                                                                                                                                                              CIRCUMSTANCES ARE ROOT BOUND
                                                                                                                                                              PLANTS TO BE USED.
                 LARGE SHRUBS




                                                                                                                                                              TREES
                                                                                                                                                              ALL 45L TREES AND LARGE SHRUBS WILL NEED TO BE STAKED
                                                                                                                                                              SECURELY USING 1800mm STAKES x 2 OR 3 AS NECESSARY AND
                                                                                                                                                              TIED TO STAKES USING HESSIAN WEBBING, (TO PREVENT PLANT
                                                                                                                                                              DAMAGE UNTIL ESTABLISHED).

                                                                                                                                                              MULCH

                                                                                                                                                              ALL GARDENS ARE BE MULCHED WITH 'TEA TREE' MULCH TO A
                                                                                                                                                              MINIMUM DEPTH OF 100mm.


                                                                                                                                                              DRAINAGE

                                    Banksia robur                        Callistemon taree pink                                                               PLEASE ENSURE ADEQUATE DRAINAGE IS INSTALLED BELOW
                                                                                                                                                              GARDENS AND PAVED AND CONCRETED AREAS.


                                                                                                                                                              LOCATION OF SERVICES AND LEVELS:
                 SMALL SHRUBS




                                                                                                                                                              PLEASE REFER HYDRAULICS PLAN FOR FULL INFORMATION ON
                                                                                                                                                              SERVICES TYPE AND LOCATION AND FINISHED LEVELS.


                                                                                                                                                              CONCRETE:
                                                                                                                                                              STENCILLED CONCRETE IS TO BE USED AS THE FINISH FOR THE
                                                                                                                                                              ENTRY PATHWAY WHERE SHOWN.
                                                                                                                                                              A STENCILLED CONCRETE FINISH IN A COLOUR AND STYLE
                                                                                                                                                              COMPLIMENTARY TO THE BUILDING IS TO BE APPLIED BY A
                                                                                                                                                              QUALIFIED PERSON ACCORDING TO BEST INDUSTRY STANDARDS.


                                                                                                                                                              GENERAL NOTES:
                                                                                                                                                              CONCRETE ROLLBACK KERB FOR CAR PARK EDGES AND GARDEN
                                                                                                                                                              BOUNDARIES AS NECESSARY, TO ENGINEER'S DETAIL.


                                    Callistemon 'Little John'         Dianella brevipedunculata                                                               MAINTENANCE:
                                                                                                                                                              IT IS THE RESPONSIBILITY OF THE PROPERTY OWNER TO
                                                                                                                                                              MAINTAIN THE PROPERTY TO A SATISFACTORY STANDARD TO
                                                                                                                                                              COUNCIL'S APPROVAL.
                                                                                                                                                              A MAINTENANCE REGIME MUST BE PROGRAMMED TO MAINTAIN
                 GROUND COVERS




                                                                                                                                                              MULCH, WATER, FERTILIZER, PRUNING AND THE CARE AND/OR
                                                                                                                                                              REPLACEMENT OF ANY DAMAGED OR DISEASED PLANT.


                                                                                                                                                              SHORT TERM
                                                                                                                                                              FOR THE FIRST 4 WEEKS ALL PLANTS MUST BE WATERED FOR
                                                                                                                                                              20mins PER DAY min. REDUCING TO 10mins PER DAY FOR
                                                                                                                                                              FOLLOWING 5 MONTHS, (ALWAYS WATER IN RELATION TO
                                                                                                                                                              RAINFALL).


                                                                                                                                                              LONG TERM
                                                                                                                                                              FERTILIZE ALL PLANTS EACH SPRING & WHEN REQUIRED DURING
                                                                                                                                                              THE YEAR. ENSURE USE OF A NATIVE 'FRIENDLY' FERTILIZER.
                                                                                                                                                              TREES & SHRUBS TO BE PRUNED AFTER FLOWERING TO MAINTAIN
                                                                                                                                                              HEALTHY GROWTH AND SHAPE. PRUNE AT THE NODE FOR ALL
                                                                                                                                                              NATIVES. NEVER 'HARD PRUNE' A PLANT UNLESS ON RELIABLE
                                                                                                                                                              AUTHORITY.
                                    Carpobrotus glauscens                Hibbertia scandens                         Trachelospermun variegatum                DUE TO BREAKING DOWN, ORGANIC MULCH NEEDS TO BE
                                                                                                                                                              'TOPPED UP' EVERY FEW YEARS TO MAINTAIN A THICK COVER.
                                                                                                                                                              STAKES AND WEBBING WHICH SUPPORT TREES MAY BE REMOVED
                                                                                                                                                              AFTER TREES ARE SUITABLY ESTABLISHED.
                 GRASSES / SEDGES




                                    Juncus usitatus                Ficnia nodosa



                                                                                                                                                                                                            NORTH

               PLAN SCHEDULE
                    NO:               CODE          BOTANICAL NAME                 COMMON NAME               HEIGHT      SPREAD COLOUR            POT SIZE
                    TREES
                               2      Ela obo Elaeocarpus obovatus                 Blueberry Ash             12m           4m             -        45 L
                    LARGE SHRUBS
                               2      Ban rob Banksia robur                        Swamp Banksia             2-3m          2-3m       Yellow       140mm
                                2     Cal tar   Callistemon taree pink             Pink bottle brush         3m            1.5m       Pink         300mm
                    SMALL SHRUBS
                         7            Cal LJ    Callistemon 'Little John'          Little John               1m            1m         Red          140mm
                         82           Dia bre   Dianella brevipedunculata          Blue Flax Lily            1m            1m         Purple       140mm
                    GROUND COVERS
                         38           Car gla   Carpobrotus glauscens              Pig Face                  0.2m          0.8m       White        140mm
                         18           Hib sca Hibbertia scandens                   Snake Vine                0.2m          2.5m       Yellow       140mm                        A   11.12.20 ISSUE FOR DA              ST   DJ

                         23           Tra var   Trachelospermun variegatum         Variegated Star Jasmine   0.3m          3.0m       Pink         140mm
                  GRASSES & SEDGES (Bio-Retention Basin Plants)                                                          QTY / m2                                                       KAREN & GRAHAM LEONARD
                         54           Fic nod Ficnia nodosa                        Knobby Club-Rush          0.5m-1.5m   8 per m2                Tube stock                             LOT 4 VISION COURT
                                                                                                                                                                                        NOOSAVILLE
                         54           Jun usi   Juncus usitatus                    Common Rush               0.3-1.2m    8 per m2     -          Tube stock

                                                                                                                                                                               LANDSCAPE SCHEDULE
                                                                                                                                                                                        ST                         DJ
                                                                                                                                                                                        As Indicated               11.09.20
                                                                                                                                                                                            2020-40                07
                                                                                                                                                                                        DA DWGS                    A
GSPublisherVersion 1605.0.2.19
Log in to download the original file

5.0 Proposal Plans.pdf · 3.6 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.