               51.    Fall protection must be provided to retaining walls that are over 1m high.
               52.    Slope and batters are a maximum grade of:
                      a.      1 in 6 where in proximity to waterbodies;
                      b.      1 in 4 for grassed areas;
                      c.      1 in 3 for planted areas; and
                      d.      1 in 2 for combined structural engineering and planting solutions.
                      Stormwater Drainage
               53.    Appropriate scour protection must be provided at the outlet of all stormwater pipes including
                      temporary outlets.
               54.    Works associated with this permit must not adversely impact on the existing drainage
                      conditions on other properties (e.g., by blocking or interfering with natural overland flows).
               55.    Construction of all internal stormwater drainage works must comply with the relevant
                      section/s of Australian Standard AS/NZS 3500.3.
                      Bioretention Basins – Construction
               56.    The bioretention devices must be constructed in accordance with the document Construction
                      and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by
                      Design, 2009). Option 1 of the staged construction and establishment methods is to be
                      followed as documented in the guidelines.
               57.    During construction and establishment of the bioretention devices, the supervising RPEQ
                      must ensure that the device is constructed in accordance with the document Construction
                      and Establishment Guidelines: Swales, Bioretention Systems and Wetlands (Water by
                      Design, 2009) and that the forms contained in section 3.15 including the associated
                      supporting information and data are completed.
                      These forms and certification from the RPEQ that the device has been constructed in
                      accordance with the Construction and Establishment Guidelines: Swales, Bioretention
                      Systems and Wetlands (Water by Design, 2009), all conditions of approval, and the approved
                      engineering drawings must be submitted to Council prior to plan sealing.
               58.    A construction hold point with a Council delegate must be established once the bioretention
                      device underdrainage pipe work is installed.
                      At the time of inspection, a sample of the drainage layer, transition layer, and filtration media
                      materials must be stockpiled on-site. Laboratory results must be provided for the filter media
                      which demonstrate that the media complies with the specifications contained in the latest
                      version of the “Guidelines for Soil Filter Media in Bioretention Systems” (produced by the
                      Facility for Advancing Water Biofiltration) and that the minimum hydraulic conductivity
                      specified on the approved engineering plans will be achieved. In addition, laboratory results
                      must be provided demonstrating that the transition layer and drainage layer meet the
                      following bridging criteria:
                      a.      D15 (drainage layer) ≤ 5 × D85 (transition layer)
                      b.      D15 (transition layer) ≤ 5 × D85 (filter media)
                      Bioretention Basins – Maintenance & handover
               59.    Following installation of the filter media for the bioretention devices, a temporary cover
                      consisting of a suitable geotextile covered with soil and turfed is to be immediately installed.
                      This temporary cover is to be maintained in place for a minimum period of 24 months
                      following acceptance of the bioretention devices On Maintenance or until 80% of building
                      works has been completed (whichever occurs first).



                                                                                                       Page 20 of 27

Document Set ID: 25027781
Version: 3, Version Date: 13/08/2026

Log in to download the original (Delegated Report - Code - Planning OPW26 0033 (As Published).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.