Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Delegated Report - Code - Planning OPW26 0033 (As Published)

of 27
                                Guidelines for that specific area and
                                must include in particular:
                                       a. provision of 1 x 45 litre pot size
                                            street tree within the road
                                            reserve for every 5 metres of
                                            road frontage suitably located
                                            for sight lines; and
                                       b. control of all weeds species
                                            listed    in    the    following
                                            standards and legislation:
                                       i. declared plants under the Land
                                                 Protection (Biodiversity
                                                 Act 2014 and sub-
                                                 ordinate        Regulation
                                                 2016).
                                       ii. Noosa Local Government Area
                                                 Pest Management Plan
                                                 2015-2019.
                                       iii.Undesirable Species as listed
                                                 in Planning Scheme
                                                 Policy 3 Landscaping
                                                 Plants and Guidelines.



                35              Fauna Management – vegetation                  A Fauna Management Plan,            Yes. Several
                                must only be removed in accordance             prepared by Equilibrium Ecology     additional
                                with a Fauna Management Plan                   (dated 16 Jan 2025) was submitted   conditions are
                                prepared by a qualified person                 with the application.               proposed to
                                                                                                                   ensure
                                                                                                                   adequate
                                                                                                                   measures to
                                                                                                                   mitigate any
                                                                                                                   impacts     to
                                                                                                                   fauna.

                      Vegetation clearing
                      The proposed vegetation clearing footprint is consistent with the higher order approval
                      development layout, to accommodate building envelopes and asset protection areas. Lots 1-
                      6 involves complete clearance. Lots 7-9 identify trees for retention within the asset protection
                      zones.
                      Vegetation protection and retention
                      The application material includes a Tree Protection Plan (sheets 1-2 of 2), prepared by TOD
                      Consulting Engineers. This plan identifies ‘no clearing zones,’ to be excluded from access.
                      As part of this application process, 5 trees (tree no. 1, 2, 22, 23 and 24) are identified for
                      retention within lots 7 and 9.
                      Covenant Area Management Plan
                      The application includes a Landscape Design & Rehabilitation Management Plan, prepared
                      by outlines measures to for the establishment and maintenance of the covenant area,
                      including weed treatment, planting and maintenance works.
                      Fauna management
                      A Fauna Management Plan, prepared by Equilibrium Ecology, dated 16 Jan 2025 was
                      submitted as part of the application material to address the requirement of condition 35 of
                      the higher order. The Fauna Management Plan prescribes measures to manage fauna prior
                      to and during vegetation clearing.


                                                                                                                   Page 8 of 27

Document Set ID: 25027781
Version: 3, Version Date: 13/08/2026

Log in to download the original (Delegated Report - Code - Planning OPW26 0033 (As Published).pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.