Original source · versioned page text
250704 Fauna Management Plan v1.0
Plans and drawings: the text below has words only, no drawings.
Very large file (11.6 MB): may take a few minutes to open.
Fauna Management Plan 44 Hoy Road, Lake MacDonald CONTENTS 1 Introduction 2 2 Approved Development 4 3 Previous Assessment 5 4 Construction and Clearing Impacts 6 4.1 Clearing Impacts 6 4.2 Construction Impacts 7 5 Management Measures 8 5.1 Pre-Construction Activities 8 5.2 Clearing & Construction Activities 10 5.2.1 Special Equipment Required During Clearing Works 14 5.2.2 Fauna Management Scenarios 15 6 Compliance & Monitoring 21 References 22 Appendix 1: Approved Development 23 Appendix 2: Vegetation Management Plan 24 Appendix 3: Personnel Register and Activity Checklist 25 1 | 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.