SEDIMENT ESTO TON oI CUTS
ISSUE MANAGEMENT COMMITMENT
OBJECTIVE / TARGET Comply with all statutory regulations and maintain
them during earthworks/construction.
Comply with the erosion and sediment control plan.
MANAGEMENT STRATEGY Site foreman to identify and check direction of storm water
land flows as shown on plan. Provide barriers and other
measures shown on the plan to intercept storm water flows
at the end of table drains, and intercept sediments
before reaching gi
TASKS / ACTIONS Erect sedimentation barriers as shown on the plans
before commencing earthworks or drainage improvements.
Place rock weirs in table drains as soon as the drains
are cut.
PERFORMANCE INDICATORS Site foreman to check that sediment fence and rock weirs
are trapping the flows after rain. Ensure no bypass occurs.
FREQUENCY / DEADLINE Site foreman shall monitor performance and repair damage
after every storm until grass is established. Sediment shall
be removed before it reaches overflow level.
RESPONSIBLE PERSON The Principal Contractors foreman shall be
responsible for inspections.
REPORTING / REVIEW Site Foreman to advise workers: if they notice any
barrier requiring repair, report it to foreman.
CORRECTIVE ACTIONS Site foreman is to repair any damaged barriers
daily. Replacements are to be purchased as required.
STANDARD SEDIMENT & EROSION CONTROL DRAWING INDEX
SD 6-8 SEDIMENT FENCE
STRAINER WIRE
TOP & BOTTOM
FILTER FABRIC FIXED TO FENCE
AND EMBEDDED INTO
GROUND MIN. 200mm
PROVIDE OVERFLOW WEIR 0.5 WIDE
02] WHERE BACKUP FLOW IS
LIKELY TO OVER TOP WEIR
0.3
|__———STAR PICKET
SEDIMENT FENCE DETAIL
SEDIMENT CONTROL LEGEND:
SEDIMENT FENCE TO PLAN SD 6-8
LEGEND:
—\NNNT
#254 Tber fence 1.8 high on
“Timber Retaining Wall
EDGE OF BITUMEN
EXTG KERB & CHANNEL
EXISTING SEWERAGE MAIN
NEW SEWER PIPE
EXISTING CONCRETE DRIVEWAY OR PATH
PROPOSED FINISH SURFACE LEVEL
NATURAL SURFACE LEVEL
—7—
( Callaghan & Toth )
\ Civil, Environmental &
Hydraulic Engineers
PO BOX 2305
NOOSA HEADS 4567
6/41 Sunshine Beach Road
Phone 54749081, Fox 54749041
www.callaghanandtoth.com.au
designed] ADT datum AHD DERIVED
drawn OW
checked J AH
approved
SURVEYED BY
MURRAY & ASSOCIATES (QLD) PTY.LTD.
PHONE (07) 54 412188
$$
$n
project
No 6 THE QUARTERDECK
NOOSA HEADS
$$ dS
Client
STEVEN & CAROLYN ROBILLIARD
|
title
SEDIMENT & EROSION
CONTROL PLAN
OO
SS
LOT 68 on RP 88934
Parish of WEYBA
County of *
SUNSHIINE COAST
REGIONAL COUNCIL
Locality of *
A
_————————————s.
SCALE
0 1.0 2.0 3.0 4.0 5.0 Meters 10.0
scale SCALE SHOWN IS ORIGINAL DRAWING SCALE.
4:200(A3) 00 NOT SCALE FROM THIS DRAWING
200(AS, USE ONLY DIMENSIONS PROVIDED
EEE
— oN
REVISIONS
ment] revision details date
=~] ¥
\ J
($a
FILES
COMPUTER DIRECTORY
XAJOBS\CT\...
Sheet 3 of 3. sheets
drawing number
1037-03
XQ date DECEMBER 2010 y,
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
10/0477 Response to Info Request Pt 4 of 4 - 1037-3.pdf (sewer plans)Related documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.