Skip to the record
The definitive source for everything Noosa Council.

Council archive · source document

10/0477 Response to Info Request Pt 4 of 4 - 1037-3.pdf (sewer plans) · 172010.477

of 1

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn
                    Civil, Environmental &
                    Hydraulic Engineers
              .99
            99
0.5
      0.2
0.3


[OCR of page images]
 

 

 

 

SEDIMENT ESTO TON oI CUTS
ISSUE MANAGEMENT COMMITMENT
OBJECTIVE / TARGET Comply with all statutory regulations and maintain

them during earthworks/construction.
Comply with the erosion and sediment control plan.

 

MANAGEMENT STRATEGY Site foreman to identify and check direction of storm water
land flows as shown on plan. Provide barriers and other
measures shown on the plan to intercept storm water flows
at the end of table drains, and intercept sediments

before reaching gi

 

 

TASKS / ACTIONS Erect sedimentation barriers as shown on the plans
before commencing earthworks or drainage improvements.
Place rock weirs in table drains as soon as the drains
are cut.

 

PERFORMANCE INDICATORS Site foreman to check that sediment fence and rock weirs
are trapping the flows after rain. Ensure no bypass occurs.

 

FREQUENCY / DEADLINE Site foreman shall monitor performance and repair damage
after every storm until grass is established. Sediment shall
be removed before it reaches overflow level.

 

RESPONSIBLE PERSON The Principal Contractors foreman shall be
responsible for inspections.

 

REPORTING / REVIEW Site Foreman to advise workers: if they notice any
barrier requiring repair, report it to foreman.

 

CORRECTIVE ACTIONS Site foreman is to repair any damaged barriers
daily. Replacements are to be purchased as required.

 

 

 

STANDARD SEDIMENT & EROSION CONTROL DRAWING INDEX
SD 6-8 SEDIMENT FENCE

 

STRAINER WIRE

TOP & BOTTOM
FILTER FABRIC FIXED TO FENCE
AND EMBEDDED INTO
GROUND MIN. 200mm
PROVIDE OVERFLOW WEIR 0.5 WIDE
02] WHERE BACKUP FLOW IS

 

LIKELY TO OVER TOP WEIR

0.3
|__———STAR PICKET

SEDIMENT FENCE DETAIL

 

SEDIMENT CONTROL LEGEND:
SEDIMENT FENCE TO PLAN SD 6-8

 

LEGEND:

—\NNNT

 

#254 Tber fence 1.8 high on
“Timber Retaining Wall

EDGE OF BITUMEN
EXTG KERB & CHANNEL

EXISTING SEWERAGE MAIN
NEW SEWER PIPE

EXISTING CONCRETE DRIVEWAY OR PATH
PROPOSED FINISH SURFACE LEVEL
NATURAL SURFACE LEVEL

—7—

      

( Callaghan & Toth )

\ Civil, Environmental &
Hydraulic Engineers

PO BOX 2305

NOOSA HEADS 4567

6/41 Sunshine Beach Road

Phone 54749081, Fox 54749041

www.callaghanandtoth.com.au

  

 

designed] ADT datum AHD DERIVED

 

drawn OW

 

 

 

checked J AH

 

approved

 

 

SURVEYED BY
MURRAY & ASSOCIATES (QLD) PTY.LTD.

PHONE (07) 54 412188
$$

$n
project

No 6 THE QUARTERDECK
NOOSA HEADS

$$ dS

Client

STEVEN & CAROLYN ROBILLIARD

|

title

SEDIMENT & EROSION

CONTROL PLAN
OO

SS

LOT 68 on RP 88934

Parish of WEYBA
County of *
SUNSHIINE COAST
REGIONAL COUNCIL

Locality of *
A
_————————————s.

 

 

SCALE
0 1.0 2.0 3.0 4.0 5.0 Meters 10.0
scale SCALE SHOWN IS ORIGINAL DRAWING SCALE.

4:200(A3) 00 NOT SCALE FROM THIS DRAWING

200(AS, USE ONLY DIMENSIONS PROVIDED

EEE
— oN
REVISIONS

 

 

 

 

 

 

 

 

 

 

ment] revision details date
=~] ¥
\ J
($a
FILES

 

COMPUTER DIRECTORY

 

XAJOBS\CT\...

 

 

 

Sheet 3 of 3. sheets

 

drawing number

1037-03

 

 

 

 

XQ date DECEMBER 2010 y,

 

 

 

 

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

10_0477 Response to Info Request Pt 4 of 4 - 1037-3.pdf (sewer plans).pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.