Decision Notice - Approved by Delegation of Authority MCU24 0155 (As Published).pdf
Property Driveway and Vehicle Crossover
5. The planning scheme declares for the construction of a driveway and vehicle crossover to
the property to be Accepted Development subject to meeting the requirements of the Low
Density Housing Code. If the proposed driveway and vehicle crossover does not comply with
each Acceptable Outcomes contained in the Code, a Development Permit for Operational
Work is required to be obtained from Council.
*http://www.noosa.qld.gov.au/documents/40217326/40415739/Vehicle%20Crossover%20Application%20Pack.pdf
Sustainability
6. Council encourages sustainable and energy efficient building design for all development,
including the use of sustainable building materials, energy efficient fittings, solar hot water,
photovoltaic systems (including the use of inverter/charges), solar panels, water saving
devices and rainwater harvesting.
Fires in Urban Areas
7. In urban areas fires are prohibited except where in an appliance is used for domestic heating
or cooking purposes, which must comply with particular standards. Any area identified as a
fire pit area on approved plans is to be in accordance with Local Law & Subordinate Local
Law No. 3, Schedule 3. Refer to the following link for details:
https://www.noosa.qld.gov.au/community/local-laws/local-laws-overview
Performance Bond
8. Where the works include Council assets (construction of new or modifications to existing) a
portion of the performance bond will be retained as a “maintenance bond” as described in
Council’s Planning Scheme Policy 6 Engineering Design Standards. Alternatively, the
developer may submit a separate “maintenance bond” at the completion of the works.
The bond amount will be:
a. 5% of the agreed value of the works or
b. $1500, whichever is the greater amount
8. PROPERTY NOTES
Not applicable.
9. VARIATION APPROVAL DETAILS
Not applicable.
10. FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit Required Subject of the required Development Permit
Development Permit for Building Works All building work (excluding demolition work).
Development Permit for Operational Works Driveway Crossover
11. SUBMISSIONS
Not applicable.
12. RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Planning Act 2016 is attached.
During the appeal period, you as the applicant may suspend your appeal period and make written
representations to Council about the conditions contained within the development approval. If
Council agrees or agrees in part with the representations, a negotiated decision notice will be
issued. Only one negotiated decision notice may be given.
Page 8 of 10
Document Set ID: 23993720
Version: 6, Version Date: 06/08/2025