Attachment A - Substation Details SHEET 1

Attached to the e-mail Operational Works Application OPW19/0157 - Cover Letter - DA Form 1 - Sub Station Detail Sheet 1, 2 & 3 -Montage existing - Montage Proposed - Consultant Advice Notice - Tree Management Plan - The Esplanade Sunshine Beach.

of 1

Page text shows just the words. Original shows the document exactly as it was published.

                                                                        THIS DRAWING IS  AND IS NOT TO BE REPRODUCED IN
                                                                        ANY FORM AS A WHOLE OR IN PART WITHOUT THE EXPRESS
                                                                        WRITTEN AUTHORITY OF MULTITECH SOLUTIONS. THIS DRAWING IS
                                                                        NOT TO BE USED PREJUDICIAL TO THE INTEREST OF MULTITECH
                                                                        SOLUTIONS.
                                                                        THIS DRAWING CONTAINS PATENTS PENDING AND INTELLECTUAL
                                                                        PROPERTY OWNED BY MULTITECH SOLUTIONS.
                                                                        © COPYRIGHT. ALL RIGHTS RESERVED

                                                                        NOTE :
                                                                        SYMBOLS ARE NOT SHOWN TO SCALE.
                                                                        REFER TO ARCHITECTURAL DRAWINGS FOR THE FINAL SET OUT.




        19.02

                               BB
                                      Q

18.93         El
                ec
                     tric
         LL              ity
              18               Pi
                 .86              t




                                                      18.51

                                                     Ta
                                                          ble   18.53
                                          18.43


              17.80                                                      P3
                                                                         P2
                                                                                 FOR COORDINATION
                                                                                 FOR COORDINATION
                                                                                                                                  24/06/19
                                                                                                                                  11/06/19
                                                                         P1      PRELIMINARY ISSUE                                10/05/19
                                                  18.46                 NO.       DESCRIPTION                                      DATE


                                                                        CLIENT:




                                                                                        SUNSHINE BEACH
                                                                                           SURF LIFE
                                                                                          SAVING CLUB


                                                                        ARCHITECT:




                                                                        BUILDING SERVICES CONSULTANT




                                                                         Level 1, 95 Brunswick Street, Fortitude Valley. Q 4006
                                                                         P.O.Box 204, Fortitude Valley, Q 4006
                                                                         T: 3394 0100 E: [email protected] W: www.mts.net.au

                                                                        PROJECT:

                                                                          SUNSHINE BEACH SURF
                                                                          LIFE SAVING CLUB
                                                                          4 THE ESPLANADE,
                                                                          SUNSHINE BEACH

                                                                        SERVICE


                                                                          ELECTRICAL SERVICES
                                                                        TITLE:

                                                                        SUBSTATION PLAN AND DETAILS
                                                                        SHEET 1




                                                          18
                                                          10

                                                         1167
                                                                        SCALE:                             DATE:




                                                        1145
                                                           9
                                                       1123
                                                          78
                                                                                                                                 




                                                         56
                                                        34
                                                      12
                                                                        1:100                               MAY 2019
                                                                        ORIGINAL SIZE: A1

                                                                        DRAWING NO.                                              REVISION:


                                                                          6524 E 160                                             P3
Log in to download the original file

Attachment A - Substation Details SHEET 1.pdf · 424 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.