Skip to the record
Search everything, all in one place.

Council archive · source document

Approved Plans 2 of 4 Roadworks OPW20-0145 · OPW20/0145

of 40

Plans and drawings: the text below has words only, no drawings.

Very large file (10.2 MB): may take a few minutes to open.

Log in to see the plans as drawn

Original PDF page 21, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                                                         25m

                                                                                                                2m                   1.15m                                                                                               15m                                                                                 1.15m               2m




                                                                                                          2m FOOTPATH                1.15m                                                                                               15m                                                                                 1.15m           2m FOOTPATH




                                                                                       BDY




                                                                                                                                                                                                                                                                                                                                                                      BDY
                                                                            1:4                                                                                                                                                                                                                                                                                             1:4




                                                                                                                                                           8.453




                                                                                                                                                                                                                                                                                                                    8.453
                                                                                                  2.5%          2.5%                 2.5%                                                                                                                           -3%                                                       2.5%              2.5%           2.5%
                                                                                                                                                                                                            -3%

                                                                                                                                                                                                                                                                                                                                                                                   Datum 8
                                                                                                                                           B1                                                                                                                                                                               B1
                                                                                                                                                                                                                        CH140.000 / TYPICAL CROSS SECTION                                                                                                                          Centreline R.L.8.665

                                                                                        BDY




                                                                                                                                                                                                                                                                                                                                                                      BDY
                                                                            1:4                                                                                                                                                                                                                                                                                             1:4




                                                                                                                                                           8.314




                                                                                                                                                                                                                                                                                                                    8.314
                                                                                                  2.5%          2.5%                 2.5%                                                                                                                           -3%                                                       2.5%              2.5%           2.5%
                                                                                                                                                                                                            -3%
                                                                                                                                                                                                                                                                                                                                                                                   Datum 8
                                                                                                                                           B1                                                                                         CH120.000                                                                             B1
                                                                                                                                                                                                                                                                                                                                                                                   Centreline R.L.8.525
                                                                                       BDY




                                                                                                                                                                                                                                                                                                                                                                      BDY
                                                                           1:4                                                                                                                                                                                                                                                                                              1:4
                                                                                                                                                           8.174




                                                                                                                                                                                                                                                                                                                    8.174
                                                                                                  2.5%          2.5%                 2.5%                                                                                                                           -3%                                                       2.5%              2.5%           2.5%
                                                                                                                                                                                                            -3%
                                                                                                                                                                                                                                                                                                                                                                                   Datum 8
                                                                                                                                           B1                                                                                         CH100.000                                                                             B1                                                     Centreline R.L.8.386
                                                                                                                                                                                                                                         25m
                                                                                                                2m                   1.15m                                                                                               15m                                                                                 1.15m               2m
                                                                                       BDY




                                                                                                                                                                                                                                                                                                                                                                      BDY
                                                                           1:4                                                                                                                                                                                                                                                                                               1:4
                                                                                                                                                           8.034




                                                                                                                                                                                                                                                                                                                    8.034
                                                                                                  2.5%          2.5%                 2.5%                                                                                                                           -3%                                                       2.5%              2.5%           2.5%
                                                                                                                                                                                                            -3%


                                                                                                                                           B1                                                                                                                                                                               B1
                                                                                                                                                                                                                                                                                                                                                                                    Datum 7
                                                                                                                                                                                                                                      CH80.000                                                                                                                                      Centreline R.L.8.246
                                                                                       BDY




                                                                             1:4




                                                                                                                                                                                                                                                                                                            7.891
                                                                                                                                                           7.885




                                                                                                  2.5%          2.5%                 2.5%                                                                                                                       -3.05%
                                                                                                                                                                                                            -3%


                                                                                                                                           B1                                                                                                                                                                               Datum 7
                                                                                                                                                                                                                                      CH60.000                                                                              Centreline R.L.8.097


                                                        -
    NOOSA COUNCIL
    APPROVED PLAN
                                                                                                                                                                   7.702




                                                                                                                                                                                                                                                                                                                                     7.629
                                                                                                                                                                                                             -2.89%                                                         -3.03%

 OPW20/0145 17 DEC 2020                                                                                                                                                                                                                                                                                                                           Datum 7
                                                                                                                                                                                                                                      CH40.000                                                                                                    Centreline R.L.7.891
                                                                                                                                                                                                                                                                                                                            PROJECT:                                                          JOB NUMBER
REV DATE DESCRIPTION                                                  BY    CHKD                                                                     SCALE                                                         APPROVED                                                                                                 PROPOSED SUBDIVISION                                                   1856
 A   13-09-19   FOR APPROVAL                                          MM          CL                                                                                                                                                                                                                                        AT NOOSA CIVIC, WALTER HAY DRIVE
 B   25-08-20   REVISED FOR APPROVAL - WALTER HAY DRIVE TURN AROUND   MM          CL     DATUM            AHD                                                                                                                                                                                                                                                                             SHEET:   23   OF   42
                                                                                                                        0              2               4                   6         8               10m                                                                                                                    FOR STOCKWELL PTY LTD
 C
 D
     21-09-20
     15/10/20
                REVISED FOR NOOSA COUNCIL DRAFT CONDITIONS
                REVISED AS PER COUNCIL RFI [29/09/20]
                                                                      MM
                                                                      MM
                                                                                  CL
                                                                                  CL
                                                                                         DESIGN          MM                                                                                                       .................                                                                                                                                                       DRAWING NUMBER      REV
                                                                                                                                                                                                                                                                                                                            DRAWING TITLE:
 E   23/11/20   REVISED AS PER COUNCIL RFI MEETING                    MM          CL     DRAWN           MM                                                                                                Director: CAMERON LANDRETH
                                                                                         DESIGN CHECK
                                                                                                                                                     SCALE 1:200 A3
                                                                                                                                                                                                                      (RPEQ 19358)                   p 07 5443 8285                                                         ROAD C CROSS SECTIONS                                              R52                E
                                                                                                          CL
                                                                                                                                                                                                                                                     e [email protected] w www.barlowshelley.com.au
                                                                                         DATE            13-09-19
                                                                                                                       This drawing is not to be copied or amended without written permission from
                                                                                                                       Barlow Shelley Consulting Engineers                                                                                           a PO Box 899, Maroochydore,4558 ABN 89 215 591 077                     SHEET 1 OF 2

Used in these records

About this file

File size
10.2 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Plans 2 of 4 Roadworks OPW20-0145.pdf · 10.2 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.