Negotiated Decision Notice MCU24 0153 & OPW24 0202 (As Published) · MCU24/0153

of 22

Text shows just the words. Original shows the document exactly as it was published.

                                                                                 Officer:            Andrew Gaffney
                                                                                 Direct Telephone:   07 53296284
                                                                                 Our Reference:      MCU24/0153 &
                                                                                                     OPW24/0202
                                                                                 Your Reference:     20240911

               16 December 2025


               Archend
               C/- Adapt Development Management P/L
               Level 1/103 Sippy Downs Dr
               SIPPY DOWNS QLD 4556

               [email protected]



               Dear Sir/Madam,
                                               Negotiated Decision Notice
                                                       Planning Act 2016

               I refer to your application and the representations you made in respect to the decision notice. On
               15 December 2025, Council decided your representations. This negotiated decision notice
               replaces the decision notice of 11 August 2025.
               Details of the negotiated decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:            MCU24/0153 & OPW24/0202

                   Street address:            51 Elanda St Sunshine Beach Qld 4567

                   Real property description: Lot 403 RP 48112

                   Planning Scheme:           Noosa Plan 2020 (25 September 2020)

               2.      DECISION DETAILS

               Council on 15 December 2025, decided to issue the following type of approval:
               •       Development Permit Material Change of Use - Multiple dwelling (6 small dwellings).
               •       Development Permit for Operational Works - Roadworks, Stormwater, Landscaping and
                       Earthworks.
               In relation to representations, Council on 15 December 2025 decided to:
               A.      Agree to the representations.
               B.      Agree to amend the ‘Decision Details’
               C.      Agree to amend condition 3 of the Material Change of Use.
               D.      Agree to amend condition 1 of the Preliminary Approval for Operational Works.
               E.      Agree to include additional conditions 3 -56 for Operational Works Approval.


               ABN 97.969.214.121                                                               PO Box 141
               noosa.qld.gov.au                                                          Tewantin QLD 4565
               [email protected]                                                          07 5329 6500
                                                                                                         Page 1 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025
Full text of the other 21 pages

Page 2

               3.     CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.     ASSESSMENT MANAGER CONDITIONS

                           DEVELOPMENT PERMIT FOR MATERIAL CHANGE OF USE (MCU24/0153)
               PLANNING
                      When Conditions must be Complied With
               1.     Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to
                      the use commencing, and then compliance maintained at all times while the use continues.
                      Currency Period
               2.     This development approval lapses if the use has not happened by 11 August 2031, unless
                      an application to extend the currency period is approved by Council.
                      Approved Plans
               3.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions*.

                        Plan No.          Rev.      Plan/Document Name                             Date


                                 08          E      Site Plan, prepared by Archend                   28/11/2025


                                 11          E      Site Plan - Landscaping Areas, prepared by       28/11/2025
                                                    Archend


                                 15          E      Floor Plan - Basement, prepared by               28/11/2025
                                                    Archend


                                 16          E      General Arrangement - Ground Floor,              28/11/2025
                                                    prepared by Archend


                                 17          E      Floor Plan - Level 1, prepared by Archend        28/11/2025


                                 18          E      Floor Plan - Level 2, prepared by Archend        28/11/2025


                                 19          E      Floor Plan - Roof, prepared by Archend           28/11/2025


                                 20          E      Floor Plan - Ground GFA, prepared by             28/11/2025
                                                    Archend


                                 21          E      Floor Plan - Level 1 GFA, prepared by            28/11/2025
                                                    Archend




                                                                                                      Page 2 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 3

                                 22           E      Floor Plan - Level 2 GFA, prepared by            28/11/2025
                                                     Archend


                                 23           E      North Elevation, prepared by Archend             28/11/2025


                                 24           E      South Elevation, prepared by Archend             28/11/2025


                                 25           E      West and East - Elevation, prepared by           28/11/2025
                                                     Archend


                                 26           E      Section A, prepared by Archend                   28/11/2025


                                 27           E      Section A2, prepared by Archend                  28/11/2025


                                 28           E      Section B and B2, prepared by Archend            28/11/2025

                      Nature and Extent of Approved Use
               4.     The approved development consists of Multiple dwelling (6 x small dwellings).
                      Building Height
               5.     The maximum height of the development must not exceed 12.0 metres above ground level,
                      except where shown on the Approved Plans.
               6.     Certification must be submitted to Council from a Registered Cadastral Surveyor (Qld) which
                      certifies that the building does not exceed the maximum height requirement of this Decision
                      Notice.
                      Performance Bond
               7.     Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must
                      be submitted to Council, to secure performance of all conditions of this approval, prior to the
                      issue of a Development Permit for Operational Works. The cash bond or trading bank
                      guarantee will be returned on performance of the conditions of approval less any costs
                      incurred by Council in respect of enforcing performance of this permit. Council reserves the
                      right to call upon the bond or guaranteed sum to effect compliance with conditions.
                      Street Identification
               8.     The street address of the development must be clearly visible and discernible from the
                      primary frontage of the site by the provision of a street number and, where appropriate, the
                      building name.
               9.     The entrance to the building and lift must be clearly visible and discernible from the visitor
                      car parks by the provision of a directional sign where appropriate.
                      Building Appearance
               10.    External design features, materials and finishes must be as shown on the Approved Plans,
                      with no inclusions or alterations made without approval in writing by Council.
               11.    The ‘open balcony’ areas shown for Units 3,4 5 and fronting Elanda Street are not to be fully
                      screened and are to remain open above balustrade height or 1.2 metres above slab level.
               12.    External finishes of the building must be a mix of lightweight and textured external finishes,
                      with masonry areas incorporating a variety of textured finishes to break up the surface.



                                                                                                       Page 3 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 4

               13.    All deck and balcony areas must not be enclosed with shutters, louvres, glass panelling or
                      the like thus remaining as open structures, except where required to satisfy any privacy
                      condition of this Decision Notice.
               14.    External colours and finishes must be of an understated colour scheme and low-reflective
                      roofing and cladding materials.
               15.    All air conditioning units or other mechanical equipment must be fully enclosed or screened
                      such that they are not visible from the street frontages nor adjoining properties.
               16.    Waste storage areas, clothes drying areas and external storage areas must be screened
                      from view of the street.
                      Protection of Privacy
               17.    The upper level balconies located on the eastern elevation of Units 3-6 must include either
                      balcony planter boxes, balustrading or fixed external screens, positioned in such a way to
                      obscure direct views into the habitable room windows or private open space areas of the
                      adjoining property. Any fixed external screen(s) must not extend more than 50% of the length
                      of the balcony.
                      Water & Sewer Connections
               18.    An underground connection to reticulated water and sewerage must be provided to the
                      premises in accordance with the standards and requirements of Northern SEQ Distributor–
                      Retailer Authority (Unitywater).
               19.    A Certificate of Completion from the Northern SEQ Distributor–Retailer Authority (Unitywater)
                      must be submitted to Council that certifies an underground connection to reticulated water
                      and sewerage has been provided to the premises.
                      Noise – Services and Pool Equipment
               20.    Written certification is required from a suitably qualified person confirming that sound
                      pressure levels from all mechanical plant and equipment comply with the following:
                      a.      Air-conditioning and Refrigeration
                                  i.   7am to 10pm: Maximum level allowable = background + 5dB(A)
                                 ii.   10pm to 7am: Maximum level allowable = background + 3dB(A)
                      b.      Pumps, Service Room
                                  i.   7am to 7pm: Maximum level allowable = background + 5dB(A)
                                 ii.   7pm to 10pm: Maximum level allowable = background + 3dB(A)
                                iii.   10pm to 7am: No audible noise.
               21.    The certification must be submitted to Council, which certifies that operational noise from any
                      fixed plant and equipment complies and with the requirements of this Decision Notice.
                      External Works
               22.    Elanda Street must be upgraded for the length of its frontage to the subject site. The works
                      must be undertaken in accordance with an Operational Works approval and must include in
                      particular:
                      a.      construction of kerb and channelling to the development side only
                      b.      widening and sealing of the existing road pavement to the centreline of Elanda Street.
                      c.      construction of a pedestrian footpath in accordance with the conditions of this Decision
                              Notice
                      d.      relocation of the existing overhead electricity pole
                      e.      removal of the existing property access and reinstatement of the kerb, footpath and
                              verge area to match the balance of the site frontage, including the provision of topsoil
                              and turf where the existing verge is grassed


                                                                                                        Page 4 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 5

                      Condition 22 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Site Access and Driveways
               23.    A sealed access driveway must be provided from Elanda Street to all parking and
                      manoeuvring areas of the development. The works must be undertaken in accordance with
                      an Operational Works approval and must include in particular:
                      a.      Dimensions and grades generally in accordance with Council standard drawings RS-
                              049 and RS-050.
                      b.      safety measures, including warning signage, to improve driver awareness of
                              pedestrians and enhance pedestrian safety. Warning signage must be provided near
                              the exit ramp from the underground parking area to warn motorists of pedestrian
                              movement along the frontage street
                      Car Parking
               24.    A minimum of 12 car parking spaces must be provided and marked on the site. The works
                      must be undertaken in accordance with an Operational Works approval and must include in
                      particular:
                      a.      2 visitor parking spaces within the total, which are clearly marked for that purpose and
                              accessible at all times for visitor use;
                      b.      dimensions, crossfalls and gradients in accordance with Australian Standard AS2890:
                              Parking Facilities;
               25.    Directional signage must be provided to direct visitors to the car parking spaces provided on
                      site.
                      Paving Treatment of Vehicle Movement Areas
               26.    Alternative materials, patterns, or threshold treatments must be used to articulate the
                      pavement treatment of vehicle movement areas.
                      Pedestrian and Bicycle Facilities
               27.    Pedestrian and bicycle facilities must be provided for the development. The works must be
                      undertaken in accordance with an Operational Works approval and must include in particular:
                      a.      A 1.5 metre wide footpath within the road verge for the entire length of the site’s
                              frontage to Elanda Street
                      Condition 27 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Stormwater Drainage
               28.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works
                      approval and must include in particular:
                      a.      Post-development peak flow rates must not exceed pre-development peak flow rates
                              up to a 1% AEP event, accounting for climate change and incorporating appropriate
                              detention measures
                      Condition 28 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Services
               29.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.




                                                                                                        Page 5 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 6

               30.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Geotechnical Stability
               31.    All works must be carried out in accordance with the recommendations contained in the
                      Proposed Unit Development report prepared by Tectonic listed within this Decision Notice.
                      Earthworks and Retaining Walls
               32.    All earthworks and associated batters/retaining structures, both above and below ground
                      level, both temporary and permanent, must be contained entirely within the subject site
                      unless written permission from the respective landowner(s) is provided to Council. All
                      earthworks must be undertaken in accordance with the provisions of Australian Standard
                      AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
               33.    Where the development involves excavation or filling over, or adjacent to, drainage, water
                      supply or sewerage infrastructure, all access chamber surface levels must be adjusted to
                      provide a freeboard of 100mm above the finished ground surface level.
               34.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      Landscaping Works
               35.    The development site must be landscaped. The works must be undertaken in accordance
                      with an Operational Works approval and the Noosa Plan for that specific area and must
                      include in particular:
                      a.      the works shown on the reference plans.
                      b.      The area between the southern boundary and the proposed footpath, landings, and
                              stairs must be landscaped. The works must include the provision of tall tree species
                              capable of growing to a minimum of 5 metres tall, to assist in softening the built form
                              of the development when viewed from neighbouring properties and Councils footpath.
                      c.      Landscaping plans that substitute Nandina domestica for a variety of shrubs from the
                              Noosa Plan 2020 PSP 2 – Landscape.
                      d.      The area between the swimming pool and rear fence is to be screened by a 3.5 metre
                              wide buffer densely planted with trees and shrubs.
                      e.      Landscape plans that incorporate additional trailing vines that can achieve the
                              architectural intent of the submitted renders.
                      f.      Vegetated screening of any electrical transformers, bin storage areas and the like from
                              the road frontage
                      g.      Provision of 1 street tree within the road reserve for every 8 metres of road frontage
               36.    All landscape works must be established and maintained in accordance with the approved
                      design for the life of the development, and in a manner that ensures healthy, sustained and
                      vigorous plant growth. All plant material must be allowed to grow to full form and be
                      refurbished when its life expectancy is reached.
               37.    The existing trees located within neighbouring properties must be assessed by a qualified
                      person* and retained and protected in accordance with an Arborist Report (or part thereof)
                      prepared by a qualified person* and endorsed through an Operational Works approval.
               38.    All planting areas on the eaves must be planted and maintained at all times, with replacement
                      planting undertaken promptly where plants fail or do not have a healthy and vigorous growth.




                                                                                                        Page 6 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 7

               39.    All planting areas on the northern side of the Unit 5 - Roof terrace is to contain suitable dense
                      screening and landscaping to ensure a minimum height of 2.0 metres. The landscaping is
                      to ensure overlooking is minimised and visual privacy is maintained to adjacent roof terraces
                      and private open spaces.
                      Waste Management
               40.    A waste storage area must be designed and maintained in accordance with Planning
                      Scheme Policy PSP9 Waste Management and the Noosa Plan’s Waste Management Code.
                      The waste storage area must be:
                      a.      imperviously paved and correctly sized for all refuse and recycling containers;
                      b.      bunded and graded so that wastewater and bin leakage drain to the sewer;
                      c.      provided with a conveniently located hosecock and backflow prevention device,
                              connected to a water supply to service the area; and
                      d.      roofed or otherwise covered.
                      Community Management Statement
               41.    Any proposed Community Management Statement required for the development pursuant to
                      the Body Corporate and Community Management Act 1997 must be submitted to Council for
                      endorsement at the same time as submission of the Building Format Plan (or similar) to
                      Council for compliance assessment.
               42.    All clauses and by-laws of the proposed Community Management Statement must accord
                      with the requirements of this Decision Notice and must include the following additional
                      clauses:
                      a.      The dwelling units are not permitted to be used for short term accommodation, unless
                              where identified as accepted development by the Noosa Plan or where there is a
                              Development Permit for Material Change of Use for Short Term Accommodation in
                              effect. Short term accommodation means the use of the premises for providing
                              accommodation of less than 3 consecutive months to tourists or travellers.




                                                                                                        Page 7 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 8

                          DEVELOPMENT PERMIT FOR OPERATIONAL WORKS (OPW24/0202)
                    ROAD WORK, DRAINAGE WORK, STORMWATER, EARTHWORKS, CAR PARKING &
                                              LANDSCAPING
                      Approved Plans
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                          Plan No.         Rev.    Plan/Document Name                           Date

                          010              B       Siteworks Overall Layout Ground              26       August
                                                                                                2025
                                                   Prepared by RECOR
                                                   As Annotated by Council

                          011              B       Siteworks Overall Layout Basement            26       August
                                                                                                2025
                                                   Prepared by RECOR

                          012              B       Detailed Ground Level Layout                 26       August
                                                                                                2025
                                                   Prepared by RECOR

                          014              B       Vehicle Crossover Longitudinal Section       26       August
                                                                                                2025
                                                   Prepared by RECOR

                          015              B       Footpath Longitudinal Section                26       August
                                                                                                2025
                                                   Prepared by RECOR
                                                   As Annotated by Council

                          016              B       Roadworks Details                            26       August
                                                                                                2025
                                                   Prepared by RECOR

                          017              B       Driveway Vertical Vehicle Tracking           26       August
                                                                                                2025
                                                   Prepared by RECOR

                          020              B       Bulk Earthworks Layout Plan                  26       August
                                                                                                2025
                                                   Prepared by RECOR

                          021              B       Bulk Earthworks Sections Sheet 1             26       August
                                                                                                2025
                                                   Prepared by RECOR

                          022              B       Bulk Earthworks Sections Sheet 2             26       August
                                                                                                2025
                                                   Prepared by RECOR

                          042              B       Stormwater Longitudinal Sections Sheet 1     26       August
                                                                                                2025
                                                   Prepared by RECOR

                          043              B       Stormwater Longitudinal Sections Sheet 2     26       August
                                                                                                2025
                                                   Prepared by RECOR




                                                                                                  Page 8 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 9

                           041               B       Stormwater Catchment Layout                26        August
                                                                                                2025
                                                     Prepared by RECOR

                           044               A       Stormwater Details                         26        August
                                                                                                2025
                                                     Prepared by RECOR

                           LD1               F       General Notes, Sheet Layout & Site 02/12/2025
                                                     Location prepared by Anembo Consultants

                           LD2               F       Project Specifications prepared by Anembo 02/12/2025
                                                     Consultants

                           LD3               F       Project      Specifications,    Annual 02/12/2025
                                                     Maintenance    &     Finishes Schedule
                                                     prepared by Anembo Consultants

                           LD4               F       Plant Schedules prepared by Anembo 02/12/2025
                                                     Consultants

                           LD5               F       Typical Details prepared by Anembo 02/12/2025
                                                     Consultants

                           LP1               F       Landscape Plan (Ground 1/2) prepared by 02/12/2025
                                                     Anembo Consultants

                           LP2               F       Landscape Plan (Ground 2/2) prepared by 02/12/2025
                                                     Anembo Consultants

                           LP3               F       Landscape Plan (First Level) prepared by 02/12/2025
                                                     Anembo Consultants

                           LP4               F       Landscape Plan (Second Floor) prepared 02/12/2025
                                                     by Anembo Consultants

                           LP5               F       Landscape Plan (Roof)       prepared   by 02/12/2025
                                                     Anembo Consultants

               Currency Period
               2.     This development approval lapses if the requirements of the conditions have not been
                      completed and lodged with Council by 11 August 2027, unless an application to extend the
                      currency period is approved by Council.
               SITE SPECIFIC CONDITIONS
                      Bonds
               3.     A site control and/or compliance bond of $10,000 is to be submitted to Council prior to the
                      pre-start meeting. The pre-start meeting will only be held once Council's Construction
                      Engineering Officer has confirmation that the bond monies have been received by Council.
                      The bond will be refunded less any costs incurred by Council in ensuring compliance with
                      these conditions or any additional inspections incurred for substandard work or work
                      undertaken not in accordance with this permit.
               4.     Bonds must:
                      a.      meet the requirements of Council’s relevant Planning Scheme Policy for performance
                              and uncompleted works;



                                                                                                   Page 9 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 10

                      b.      be calculated using a schedule of works and relevant bond equation;
                      c.      be lodged with Council and accompanied by the Bond Administration Fee/s; and
                      d.      be requested for release by writing to Council, when relevant approval requirements
                              have been met.
               PRIOR TO COMMENCEMENT OF WORKS
                      Engineering
               5.     All necessary approvals from external service providers (e.g., Unitywater) and external
                      parties on which the development works are proposed have been obtained and a copy
                      supplied to Council.
               6.     A condition report of the drainage system must be completed for agreement at the prestart
                      meeting. The condition report is to include a CCTV inspection of the existing field inlet
                      (labelled as “7/1”) to the next downstream structure, inclusive.
               7.     A condition report including photographs of the frontage of the site must be completed and
                      submitted to council at the prestart meeting / prior to any works commencing.
               8.     Certificates demonstrating currency of public liability insurance and works insurance covering
                      the works must be submitted to Council prior to the prestart meeting.
               9.     Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works;
                      b.      Landscape works;
                      c.      Erosion and sediment control works; and
                      d.      Other relevant parties.
               10.    A Construction Management Plan must be submitted to Council prior to the pre-start meeting
                      and must specifically address the following:
                      a.      Traffic Management during all aspects of the construct phase including:
                              i.       A Traffic Management Control Plan in accordance with Manual of Uniform Traffic
                                       Control Devices (MUTCD) detailing all temporary signage and traffic control
                                       measures prior to construction.
                              ii.      Maintenance of safe vehicle and pedestrian access across the frontage of the
                                       site both during daily construction and after daily construction has ceased.
                              iii.     Proposed fencing to the site during the construction phase of the development.
                              iv.      Adequate parking arrangements for construction workers.
                              v.       No queuing of trucks is permitted on residential streets, especially prior to
                                       7.00am. Further parked trucks must have engines turned off
               Maintenance and protection of water quality and existing drainage lines through the construction
               site through the implementation of appropriate erosion and sediment control measures.
               Works programme identifying key components of the works and their respective durations.
               Establishment of a communication protocol with the general public, adjoining owners, emergency
               services and local businesses to advise of agreed construction times, impacts on traffic and
               services and other relevant issues.
               Include a post out to the local residents and businesses advising of the proposed development,
               the expected time frames and the site contact details.
               Include signage in prominent locations on the boundaries of the site advising of the proposed
               development, the expected time frames and the site contact details.



                                                                                                       Page 10 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 11

               identification of complaint management procedures including:
                              i.       contact details for the on-site manager; and
                              ii.      dispute resolution procedures.
               11.    Any changes to the details associated with the supervising RPEQ or Principal Contractor
                      during construction, must be notified to council in writing within five business days of the
                      change occurring.
               12.    Any conflict between the development and an existing or proposed service must be referred
                      to the relevant service authority for determination prior to commencement of works.
               DURING CONSTRUCTION
                      Engineering
               13.    The developer must meet any costs to repair damage to any Council asset during
                      construction, where damage is a result of the development works. Damage to assets must
                      be repaired immediately where it creates a hazard to the community. In circumstances where
                      the damage does not create a hazard to the community, it must be repaired immediately on
                      completion of the works associated with the development.
               14.    All works must be supervised by a Registered Professional Engineer of Queensland (RPEQ)
                      who is independent of the Developer and Principal Contractor, and they must certify that all
                      works conform to the Operational Works permit. Where municipal works are involved, such
                      confirmation must be submitted for the respective hold points prior to any site inspection by
                      Council Officers.
               15.    All works must be constructed and work procedure undertaken in accordance with:
                      a.      The approved plans/documents and conditions detailed in this Decision Notice.
                      b.      All relevant Noosa Council Planning Scheme Policies, standard drawings, standard
                              specifications and guidelines.
                      c.      The relevant conditions of the higher order Material Change of Use approval viz
                              MCU24/0153 to which this approval relates.
                      d.      The latest version of the Healthy Waterways document “Water Sensitive Urban Design
                              Technical Design Guidelines for South East Queensland” for all water quality devices
                              to be constructed on site.
                      Retention of Existing Trees and Vegetation
               16.    All trees and vegetation identified for retention must be protected in accordance with AS
                      4970, Protection of trees on development sites.
               17.    A qualified person * must be engaged for the duration of the works to:
                      a.      Supervise tree protection within the development site and frontages, prior to, during
                              and following construction in accordance with AS 4970, Protection of trees on
                              development sites.
                      b.      Supervise and undertake necessary tree protection for all trees affected by the
                              development on neighbouring Lots. This includes tree identified in the approved
                              arborist report as outside project scope within the neighbouring properties east of the
                              development site. Where trees within neighbouring properties are found to be unsafe
                              due to works relating to this development approval, the developer is solely responsible
                              for the removal and replacement of these trees.
                      c.      Oversee approved tree removal in proximity to retained trees.
                              *(Refer to Advisory Note)
                      Vegetation Clearing
               18.    Removal of trees and vegetation must be undertaken by a qualified person* and must
                      include:


                                                                                                      Page 11 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 12

                      a.      No damage to vegetation for retention.
                      b.      Legal disposal of all removed vegetation and debris.

                      Fauna Management
               19.    Prior to felling or pruning, all trees are to be checked for wildlife (i.e. koalas, possums, birds
                      etc.) If wildlife is present, the tree vegetation must not be felled or pruned until the wildlife
                      has left vegetation or has been relocated by a qualified fauna spotter catcher.
                      *(Refer to Advisory Note)
                      Landscaping Works
               20.    Landscape works must be supervised, undertaken and certified by qualified persons*. All
                      works must be completed in accordance with this Decision Notice.
                      (* Refer to Advisory Note)
               21.    Public amenity trees* must:
                      a.      Meet AS 2302 – Tree Stock for landscape use.
                      b.      Be located in accordance with engineering requirements for safe vehicle and
                              pedestrian sight lines.
                      *(Refer to Advisory Note)
               22.    Turfed areas must be free of pest, diseases and weeds and level with adjoining surfaces.
                      Roadworks (External Roadworks & Road Widening Works)
               23.    All pavement widening or construction of new pavement must join neatly to the existing
                      pavement so that there are no irregularities in line or level resulting at or adjacent to the join
                      for the length of the construction. Where necessary the existing pavement must be brought
                      to a satisfactory standard to allow for the above.
               24.    All street surfacing must consist of a minimum depth of 30mm of an approved hot mixed
                      asphaltic concrete, unless other pavement types are approved as feature areas in
                      intersection thresholds, speed control devices, turning areas, indented parking etc.
                      Pavement Design and Construction
               25.    The pavement designs shown on the engineering drawings are not approved. To attain
                      approval for the pavement design, the following details must be submitted and certified by
                      an RPEQ with the proposed pavement design.
                      a.      The design CBR must be based on the four day soaked CBR value for the subgrade
                              material.
                      b.      The design subgrade CBR must be representative of each homogenous insitu section
                              of finished subgrade. With respect to each section:
                              i.       For four or less test results, the design CBR must be taken as the least estimated
                                       insitu CBR result.
                              ii.      For five or more test results, the design CBR must be taken as the 10th percentile
                                       of all estimated insitu CBR results.
                      c.      The samples must be taken generally in the position of the outer wheel path on both
                              sides of the proposed road. A sketch plan showing the location of all tests must be
                              submitted with the test results for pavement design approval.
                      d.      Where imported material has been (or is proposed to be) used for subgrade
                              replacement, and the depth of the imported material is less than 300mm, the pavement
                              design CBR must be based on the testing results of the insitu material and not the
                              imported material.




                                                                                                          Page 12 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 13

               26.    At the time of subgrade inspection, the subgrade must exhibit no visible signs of deformation
                      under proof rolling by a fully loaded water truck. The pavement subgrade will not be passed
                      until this requirement has been achieved.
               27.    Pavement design for privately owned works must be undertaken in accordance with the
                      relevant standards. Structural integrity of the driveway and car park areas will remain the
                      responsibility of the property owner/developer and must be certified by an RPEQ.
                      Works within Road Reserve/Reinstatement
               28.    Safe pedestrian and vehicle access on all streets in the vicinity of the development must be
                      maintained at all times. Should footpath/road closures be necessary to carry out construction
                      works, Council’s Engineering Officer must be notified prior to the proposed closure and all
                      requirements complied with.
               29.    All frontage works must match neatly with existing road and verge/footpath features.
                      Additional works beyond the frontage may be required to provide an acceptable transition to
                      existing road and verge/footpath profiles.
               30.    Electrical conduits or other services proposed to be installed within existing and proposed
                      road reserves under existing sealed carriageways, concrete pathways, concrete/sealed
                      driveways or significant vegetation must be installed by boring. Trenching is not permitted,
                      unless specifically approved by Council.
                      Pathways
               31.    All pathways must be constructed in accordance with the following requirements:
                      a.      All footpath/cycleway must comply with Council’s Standard Drawing SEQ R-065.
                      b.      Provision must be made for disabled access at all kerb crossings associated with
                              pathways, in accordance with Council's current standards.
                      c.      All paths must have a slip resistant surface.
                      d.      Expansion and contraction joints must provide a flush finish. Installation of joints by
                              saw cutting is preferred to ensure a smooth ride for cyclists.
                      e.      The required work includes any modifications to ensure the footpath finishes flush with
                              all existing service covers and the like, or alternatively these services are raised or
                              altered, so as not to create a pedestrian safety hazard.
               32.    Pathways must:
                      a.      terminate in a manner that ensures smooth transition to existing surfaces for public
                              safety.
                      b.      be designed and constructed to comply with the Disability Discrimination Act (DDA),
                              Access to Premises Standard, Austroads and relevant sections of AS1428 Design for
                              access and mobility.
                      Site Access and Driveways
               33.    Driveway crossovers must be constructed in accordance with council’s Standard Drawings
                      RS-049, RS-050 and any associated addendum.
               34.    Any existing unnecessary or redundant property accesses must be removed, and the kerb,
                      footpath and verge area reinstated to match the existing footpath and/or verge treatments.
                      Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed
                      or turf and must be maintained by the developer until established.
               35.    The following must be complied with during the construction of the required
                      crossover/driveway:
                      a.      The driveway surfacing must consist of either an approved hot mixed asphaltic
                              concrete or patterned/plain concrete.




                                                                                                      Page 13 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 14

                      b.      The driveway must be constructed so as not to concentrate stormwater runoff onto
                              neighbouring properties.
                      c.      Underground service conduits for water supply, electricity and any other services must
                              be provided as part of the access driveway.
                      d.      Where there is an existing pedestrian path, a matching crossfall must be provided for
                              the driveway on the alignment of the path, for the full width of the path.
                      e.      The property access must be located a minimum of 1m clear of existing power poles,
                              streetlights or other signage. The developer is responsible for any necessary relocation
                              of existing services to provide this clearance and must contact the relevant service
                              authorities and comply with their requirements in relation to these works.
                      Earthworks and Retaining Walls
               36.    All earthworks shall be undertaken in accordance with the provisions of AS 3798 Guidelines
                      on Earthworks for Commercial and Residential Development, with geotechnical testing
                      undertaken in accordance with Section 8 of the Standard, and to a minimum of ‘Level 1’ as
                      defined in Appendix B. Test results as required by AS 3798, and a certificate of quality and
                      uniformity of fill shall be provided by a RPEQ and submitted to Council prior to the
                      commencement of the use.
               37.    All earthworks and associated batters/retaining structures, both above and below ground
                      level, both temporary and permanent, must be contained entirely within the subject site
                      unless written permission from the respective landowner(s) is provided to Council.
               38.    Fall protection must be provided to retaining walls that are over 1m high.
               39.    Slope and batters are a maximum grade of:
                      a.      1 in 6 where in proximity to waterbodies.
                      b.      1 in 4 for grassed areas.
                      c.      1 in 3 for planted areas.
                      d.      1 in 2 for combined structural engineering and planting solutions.
                      Stormwater Drainage
               40.    Appropriate scour protection must be provided at the outlet of all stormwater pipes including
                      temporary outlets.
               41.    Works associated with this permit must not adversely impact on the existing drainage
                      conditions on other properties (e.g., by blocking or interfering with natural overland flows).
               42.    Construction of all internal stormwater drainage works must comply with the relevant
                      section/s of Australian Standard AS/NZS 3500.3.
                      Erosion and Sediment Control
               43.    Prescribed Water Contaminants (as defined in Schedule 10 of Environmental Protection
                      Regulation 2019) must not be released from the site or to waters within the site, or be likely
                      to be released should rainfall occur, unless all reasonable and practicable measures are
                      taken to prevent or minimise the release and concentration of contamination.
               44.    Sediment and erosion control measures must be in place prior to works commencing. If such
                      measures are not in place or are not satisfactory, “on the spot” fines may be issued. Such
                      fines can be issued if sediments from the site are found to enter or have the potential to enter
                      Council’s stormwater system, natural waterways, any downstream stormwater filtration
                      system or adversely impacting on other properties. The sediment and erosion control design
                      and measures have NOT been approved, it is the site's Supervising Engineer who is
                      responsible for ensuring that the sediment and erosion control measures have:
                      a.      Been duly designed by an RPEQ or CPESC and constructed in accordance with "best
                              practise" methods;



                                                                                                       Page 14 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 15

                      b.      Been revised by an RPEQ or CPESC to address the issues raised by changes in the
                              projected construction schedule and/or methods;
                      c.      Been revised to address predicted rainfall events; and
                      d.      Achieve the desired environmental outcomes.
                      Council may request further controls to be installed should the implemented measures be
                      found inefficient.
               45.    The erosion and sediment control measures must be designed, installed and maintained in
                      accordance with the supervising engineer instructions and the current best practice
                      standards.
                      (*) Refer to Advisory Note
               46.    The developer must ensure non-essential exposure of soil is prevented by restricting the
                      extent of disturbance and minimising the duration of soil exposure to adverse weather
                      conditions and effectively turf, cover or stabilise any disturbed area without delay and prior
                      to rainfall occurring.
               47.    The developer must ensure sediment does not leave the site or enter onto adjoining
                      properties or Council’s drainage system due to surface runoff or on tyres of vehicles and/or
                      machinery. It is essential to implement appropriate approved erosion and sediment control
                      measures throughout the site during all phases of construction including vehicle shakedown
                      pad/grid (or similar) at the access to the construction site. Where sediments or other
                      contaminants are deposited on a road, they must be removed so as not to enter Council’s
                      drainage system or waterways.
               48.    Prior to the completion of the development and commencement of use, all site surfaces must
                      be effectively stabilised using methods which have achieved effective short-term stabilisation
                      and which will continue to achieve effective stabilisation in the medium to long-term.
                      For the purpose of this condition, an effectively stabilised surface is defined as one that does
                      not, or is not likely to result in visible evidence of soil loss caused by sheet, rill or gully erosion
                      or lead to sedimentation, or lead to water contamination.
                      Damage to Services and Assets
               49.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
               FOLLOWING CONSTRUCTION AND PRIOR TO THE COMMENCEMENT OF THE USE
                      Supervision/Certification
               50.    Prior to commencement of use the following (prepared by respective qualified persons* and
                      certifying compliance with approvals) must be submitted to Council:
                      a.      Landscaping certification confirming all works have been constructed in accordance
                              with conditions of approval.
                      Certification
               51.    Upon completion of the work a certificate must be issued by an RPEQ certifying that the
                      works have been constructed in accordance with the Operational Works permit.




                                                                                                            Page 15 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 16

                      As Constructed Plans and ADAC XML Files (Council)
               52.    Prior to acceptance of civil works to become Council assets “On Maintenance”, satisfactory
                      “As-Constructed” records must be submitted to Council. The bundle of “As Constructed”
                      a.      As-Constructed Engineering Drawings. Data is to be submitted in an electronic drawing
                              file format (.dwg), with all plans clearly endorsed “As-Constructed”, along with the
                              accompanying hardcopies (PDFs of the As-Constructed .dwg drawing files), and;
                      b.      ADAC XML Digital File. ADAC File format (ADAC - Asset Design As Constructed)
                              prepared in accordance with industry standards and recorded in “MGA - UTM56 /
                              GDA94” projection.
                              Please Note: Further information and advice relating to the as-constructed drawing
                              presentation, as-constructed survey capture and associated guidelines for preparation
                              of a compliant ADAC XML digital file are available on the webpage titled “As-
                              Constructed Guidelines” and accessible at the Noosa Council Website: Planning &
                              Development / Development Tools & Guidelines / As-Constructed Guidelines.
                      c.      The “As-Constructed” drawings will require certification by a:
                              i.       Qualified experienced Civil Engineer (RPEQ) confirming design intent and
                                       conformance with applicable standards and specifications, along with the
                                       relevant descriptions of assets, services and structures and;
                              ii.      Registered Cadastral Surveyor (Qld) in regard to the cadastral and locational
                                       information, levels and applicable survey datum.
                      d.      The data must be in accordance with Council’s “Planning Scheme Policy 6 –
                              Engineering Design Standards”, and fully detail the levels for all engineering works
                              including but not limited to the drainage network and structures, finished ground and
                              pavement surface levels.
                      On Maintenance
               53.    All municipal works must be accepted ‘On Maintenance’ by Council in accordance with
                      Council’s relevant Planning Scheme Policy prior to the commencement of the use. To
                      achieve ‘On Maintenance’, the supervising RPEQ must submit to Council:
                      a.      certification that all works have been undertaken and completed in accordance with the
                              requirements of this Permit.
                      b.      as Constructed details in accordance with Council’s Planning Scheme Policy.
                      c.      maintenance and operational manuals for all proprietary or site-specific devices
                      Off Maintenance
               54.    Prior to requesting an Off Maintenance inspection, the developer must provide a written
                      request for the Off Maintenance inspection.
               55.    A re-inspection fee in accordance with Council’s Fees and Charge Register will be charged
                      where:
                      a.      a Council inspection reveals works do not comply with approval requirements.
                      b.      submitted certification falsely states works comply with approval requirements.
               56.    A final inspection and approval of the new driveway and completed reinstatement works by
                      Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the
                      inspection.




                                                                                                      Page 16 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 17

               5.     REFERENCE DOCUMENTS

                Plan No.               Rev.   Plan/Document Name                              Date

                24265-001              0      Proposed Unit Development prepared by 30/09/2024
                                              tectonic

                -                      -      Technical Memorandum                            26 August 2025
                                              Prepared by RECOR

                LD1                    D      General Notes, Sheet Layout & Site Location 21/03/25
                                              prepared by Anembo Consultants

                LD2                    D      Project Specifications prepared by Anembo 21/03/25
                                              Consultants

                LD3                    D      Project Specifications, Annual Maintenance & 21/03/25
                                              Finishes Schedule prepared by Anembo
                                              Consultants

                LD4                    D      Plant Schedules     prepared   by    Anembo 21/03/25
                                              Consultants

                LD5                    D      Typical Details   prepared     by    Anembo 21/03/25
                                              Consultants

                LP1                    D      Landscape Plan (Ground 1/2) prepared by 21/03/25
                                              Anembo Consultants

                LP2                    D      Landscape Plan (Ground 2/2) prepared by 21/03/25
                                              Anembo Consultants

                LP3                    D      Landscape Plan (First Level) prepared by 21/03/25
                                              Anembo Consultants

                LP4                    D      Landscape Plan (Second Floor) prepared by 21/03/25
                                              Anembo Consultants

                LP5                    D      Landscape Plan (Roof) prepared by Anembo 21/03/25
                                              Consultants

               6.     REFERRAL AGENCIES

               Not applicable.
               7.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
               MATERIAL CHANGE OF USE
                      Aboriginal Cultural Heritage Act 2003
               1.     There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
                      approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
                      The ACH Act establishes a cultural heritage duty of care which provides that: “A person who
                      carries out an activity must take all reasonable and practicable measures to ensure the
                      activity does not harm Aboriginal cultural heritage”. It is an offence to fail to comply with the


                                                                                                       Page 17 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 18

                      duty of care. Substantial monetary penalties may apply to individuals or corporations
                      breaching this duty of care. Injunctions may also be issued by the Land and Resources
                      Tribunal, and the Minister administering the ACH Act can also issue stop orders for an activity
                      that is harming or is likely to harm Aboriginal cultural heritage or the cultural heritage value
                      of Aboriginal cultural heritage.
                      You should contact the Cultural Heritage Unit to discuss any obligations under the ACH Act.
                      Equitable Access and Facilities
               2.     The plans for the proposed building work have NOT been assessed for compliance with the
                      requirements of the National Construction Code - Building Code of Australia (Volume 1) as
                      they relate to people with disabilities. Your attention is also directed to the fact that in addition
                      to the requirements of the National Construction Code as they relate to people with
                      disabilities, one or more of the following may impact on the proposed building work:
                      a.      the Disability Discrimination Act 1992 (Commonwealth);
                             i.        the Anti-Discrimination Act 1991 (Queensland); and
                            ii.        the Disability (Access to Premises – Buildings) Standards.
                      Development Compliance Inspection
               3.     Prior to the commencement of the use, please contact Council's Development Assessment
                      Branch to arrange a Development Compliance Inspection.
                      Advertising Devices
               4.     All Advertising Devices must comply with Schedule 10 of Subordinate Local Law No.1
                      (Administration) 2015 including both temporary and permanent signage. All freestanding,
                      pylon or pole signs or signage that is illuminated requires approval from Council prior to being
                      installed. All signage identified in s6 of Schedule 10 of Subordinate Local Law No. 1 is
                      prohibited from being erected in the Shire.
                      Infrastructure Charges
               5.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further       information,     please        refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
                      Performance Bond Agreement
               6.     An applicant for a development application may make an agreement with an assessment
                      manager, referral agency or other person to establish the responsibilities, or secure the
                      performance, of a party to the agreement about a development condition.
                      Submission of Amended Plans Required
               7.     The conditions of this Decision Notice require resubmission of plans to Council with
                      amendments. Please address the amended plan/s to Council’s Development Assessment
                      Branch with the Reference No. MCU24/0106 & OPW24/0202.
                      Building and Construction Industry (Portable Long Service Leave) Levy
               8.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
                      Qualified Person
               9.     For the purpose of preparing a Geotechnical Report, and for certifying geotechnical stability
                      for the development, a qualified person is considered to be a person who:
                      a.      is a Registered Professional Engineer of Queensland (RPEQ); and
                             i.        has a degree in civil engineering or engineering geology; and


                                                                                                           Page 18 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 19

                            ii.        has a minimum of 5 years experience in the field of geotechnical engineering or
                                       engineering geology.
                      Co-ordination of Operational Works Assessment
               10.    Additional application fees apply to Operational Work applications where the different
                      aspects of the works are lodged separately. Significant savings in application fees will result
                      if all works are lodged in a single application.
                      Preparation of a Preliminary Construction Management Plan
               11.    A preliminary Construction Management Plan must be submitted with the Operational Works
                      application and must address the following:
                      a.      Safley managing pedestrian traffic on all adjacent footpaths
                             i.        appropriate traffic signage in accordance with the Manual of Uniform Traffic
                                       Control Devices (MUTCD)
                            ii.        provision for safe pedestrian access across the frontage of the site both during
                                       daily construction and after daily construction has ceased.
                      Road Reserve Permit
               12.    This development permit provides the applicant with written authority to undertake the
                      development in accordance with the conditions. Any additional activities that are undertaken
                      inside Council’s road reserve for the purpose of acting on this development permit may
                      require a Road Reserve Permit. These additional activities may include, but are not limited
                      to, hoarding, pedestrian diversions, laneway closures, etc. To apply for a Road Reserve
                      Permit, or for more information, Contact Council’s Road Reserve Officer at
                      [email protected] Act 2014 – Fire Ant Control
               13.    Developers must remain vigilant for the presence of fire ants. Under the Biosecurity Act 2014,
                      individuals and businesses are responsible for ensuring that they follow the movement
                      controls for specific organic materials to help prevent the spread of fire ants within South
                      East Queensland’s fire ant biosecurity zones. Movement of a fire ant carrier from within a fire
                      ant biosecurity zone may need a biosecurity instrument permit. More information is available
                      on https://www.fireants.org.au/treat/business-andindustry/movement-controls
               OPERATIONAL WORKS
                      Building and Construction Industry (Portable Long Service Leave) Levy
               14.    The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
                      General Advisory Notes
               15.    As this driveway is a private structure, the owner bears full responsibly for the standard of its
                      construction, maintenance and any liabilities associated with its construction. It is
                      recommended that professional advice be sought for the construction of the driveway to
                      ensure that the driveway is constructed in accordance with standard drawings RS-049, RS-
                      050 and any associated addendum.
               16.    Council has undertaken an audit check of the Operational Works drawings in relations to the
                      proposed works. A detailed check of the calculations and drawings has not been undertaken,
                      as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of
                      the engineering design. Council reserves the right to require further amendments and/or
                      additions at a later date should design errors become apparent.
               17.    Council reserves the right to call up any performance bond held or levy charges against the
                      property, should emergency works be required to be undertaken by Council to make the site
                      safe due to inactivity on the development site for extended periods of time.



                                                                                                        Page 19 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 20

               18.    Should any changes or modifications to the approved plans be required as a result of
                      construction constraints, a “Request to change an existing approval” under the Planning Act
                      2016 must be made. Amended plans clearly indicating the changes must be lodged with this
                      application along with the appropriate fees.
                      Prestart, On and Off Maintenance Inspections Request
               19.    Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5
                      business days’ notice of preferred inspection time.
               20.    If Council officers are required to undertake additional inspections of the same works, a
                      reinspection fee will be applicable in accordance with Council’s Fees and Charges register
                      applicable at the time.
               21.    A minimum maintenance period of 12 months will apply to all municipal works and thereafter
                      until such time as the works are performing in accordance with the approved design unless
                      noted otherwise.
                      Environmental Advisory Notes
               22.    The Environmental Protection Act 1994 states that a person must not carry out any activity
                      that causes, or is likely to cause, environmental harm unless the person takes all reasonable
                      and practicable measures to prevent or minimise the harm. Environmental harm includes
                      environmental nuisance. In this regard persons and entities, involved in the civil, earthworks,
                      construction and landscaping phases of this development are to adhere to their ‘general
                      environmental duty’ to minimise the risk of causing environmental harm.
                      Erosion and Sediment Control
               23.    Accepted best practice standards include International Erosion Control Association
                      Australasia Best Practice Erosion and Sediment Control.
               24.    Qualified Person, for the purpose of erosion and sediment control is a Certified Professional
                      in Erosion and Sediment Control (CPESC) or suitably experienced Registered Professional
                      Engineer of Queensland (RPEQ).
               25.    As a general rule, a site is determined to have achieved effective short-term stabilisation if
                      at the time of the plan sealing inspection:
                      a.      Methods of stabilisation are:
                              •    appropriate for slopes and slope lengths; and
                              •    are consistent with best practice environmental management practices such as in
                                   the Manual for Erosion and Sediment Control or the IECA Manual; and
                      b.      Stormwater runoff from the site is not currently, and is not likely to result in visible
                              evidence of sedimentation or erosion, or lead to water contamination.
                      Biosecurity Act 2014 – Fire Ant Control
               26.    Developers must remain vigilant for the presence of fire ants. Under the Biosecurity Act 2014,
                      individuals and businesses are responsible for ensuring that they follow the movement
                      controls for specific organic materials to help prevent the spread of fire ants within South
                      East Queensland’s fire ant biosecurity zones. Movement of a fire ant carrier from within a fire
                      ant biosecurity zone may need a biosecurity instrument permit. More information is available
                      on https://www.fireants.org.au/treat/business-andindustry/movement-controls.
               8.     PROPERTY NOTES

               Not applicable.
               9.     VARIATION APPROVAL DETAILS

               Not applicable.




                                                                                                       Page 20 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 21

               10.      FURTHER DEVELOPMENT PERMITS REQUIRED

                   Type of Development Permit Required                        Subject of the required Development Permit

                   Development Permit for Building Works                      All building work.

               11.      SUBMISSIONS

               Not applicable.
               12.      RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               13.      OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available online at
               www.noosa.qld.gov.au or at Council Offices.


               Yours faithfully,

               Andrew Gaffney
               Senior Development Planner | Development Assessment
               Development & Regulation


               Enc:     Appeal Rights
                        Infrastructure Charge Notice
                        Approved Plans/Documents


               DECISION NOTICE HISTORY
               •     Original Decision Notice – 11 August 2025.
               •     Negotiated Decision Notice – 15 December 2025, with an amendment to Decision Details, amend condition 3 of MCU and
                     include additional conditions 3-56 for OPW,




                                                                                                                           Page 21 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Page 22

                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 22 of 22
Document Set ID: 24037249
Version: 8, Version Date: 18/12/2025

Used in these records

About this file

File size
221 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Negotiated Decision Notice MCU24 0153 & OPW24 0202 (As Published).pdf · 221 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.