Skip to the record
Noosa's #1 Council Tracker.

Council archive · source document

Approved Decision Notice - MCU24 0094 [As Published] · MCU24/0094

of 13

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

                      Equitable Access and Facilities
               9.     The plans for the proposed building work have NOT been assessed for compliance with the
                      requirements of the National Construction Code - Building Code of Australia (Volume 1) as
                      they relate to people with disabilities. Your attention is also directed to the fact that in addition
                      to the requirements of the National Construction Code as they relate to people with
                      disabilities, one or more of the following may impact on the proposed building work:
                      a.      the Disability Discrimination Act 1992 (Commonwealth);
                      b.      the Anti-Discrimination Act 1991 (Queensland); and
                      c.      the Disability (Access to Premises – Buildings) Standards
                      Building and Construction Industry (Portable Long Service Leave) Levy
               10.    The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
                      Co-ordination of Operational Works Assessment
               11.    Additional application fees apply to Operational Work applications where the different
                      aspects of the works are lodged separately. Significant savings in application fees will result
                      if all works are lodged in a single application.
                      Preparation of a Preliminary Construction Management Plan
               12.    A preliminary Construction Management Plan must be submitted with the Operational Works
                      application and must address the following:
                      a.      traffic management during all aspects of the construction phase of the Operational
                              Works including:
                              i.       a Traffic Management Control Plan in accordance with the Manual of Uniform
                                       Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                                       control measures prior to construction
                              ii.      maintenance of safe pedestrian and vehicle access for the areas affected by the
                                       works during and after daily construction has ceased
                              iii.     proposed fencing to the site during the construction phase of the development
                              iv.      provision for worker car parking
                      b.      maintenance and protection of water quality and existing drainage lines through the
                              construction site, through the implementation of appropriate erosion and sediment
                              control measures
                      c.      works programme identifying key components of the works and their respective
                              durations
                      d.      establishment of a communication protocol with the general public, adjoining owners,
                              emergency services and local businesses to advise of agreed construction times,
                              impacts on traffic, services and other relevant issues.
                      e.      Include a post out to the local residents and businesses advising of the proposed
                              development, the expected time frames and the site contact details.
                      f.      Include signage in prominent locations on the boundaries of the site advising of the
                              proposed development, the expected time frames and the site contact details.
                      g.      identification of complaint management procedures including:
                              i.       contact details for the on-site manager
                              ii.      dispute resolution procedures




                                                                                                           Page 10 of 13
Document Set ID: 23687199
Version: 2, Version Date: 14/04/2025


[OCR of page images]
Equitable Access and Facilities

9. The plans for the proposed building work have NOT been assessed for compliance with the
requirements of the National Construction Code - Building Code of Australia (Volume 1) as
they relate to people with disabilities. Your attention is also directed to the fact that in addition
to the requirements of the National Construction Code as they relate to people with
disabilities, one or more of the following may impact on the proposed building work:

a. _ the Disability Discrimination Act 1992 (Commonwealth);

b. the Anti-Discrimination Act 1991 (Queensland); and

Cc. the Disability (Access to Premises — Buildings) Standards

Building and Construction Industry (Portable Long Service Leave) Levy

10. The QLeave levy must be paid prior to the issue of a development permit where it is required.
Council will not be able to issue a Decision Notice without receipt of details that the Levy has
been paid.

Co-ordination of Operational Works Assessment

11. Additional application fees apply to Operational Work applications where the different
aspects of the works are lodged separately. Significant savings in application fees will result
if all works are lodged in a single application.

Preparation of a Preliminary Construction Management Plan

12. Apreliminary Construction Management Plan must be submitted with the Operational Works
application and must address the following:

a. traffic management during all aspects of the construction phase of the Operational
Works including:

i. a Traffic Management Control Plan in accordance with the Manual of Uniform
Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
control measures prior to construction

ii. maintenance of safe pedestrian and vehicle access for the areas affected by the
works during and after daily construction has ceased

iii. | proposed fencing to the site during the construction phase of the development
iv. provision for worker car parking

b. maintenance and protection of water quality and existing drainage lines through the
construction site, through the implementation of appropriate erosion and sediment
control measures

Cc. works programme identifying key components of the works and their respective
durations

d. establishment of a communication protocol with the general public, adjoining owners,
emergency services and local businesses to advise of agreed construction times,
impacts on traffic, services and other relevant issues.

e. Include a post out to the local residents and businesses advising of the proposed
development, the expected time frames and the site contact details.

f. Include signage in prominent locations on the boundaries of the site advising of the
proposed development, the expected time frames and the site contact details.

g. identification of complaint management procedures including:
i. contact details for the on-site manager

ii. dispute resolution procedures

Document Set ID: 23687199 Page 10 of 13

Version: 2, Version Date: 14/04/2025

Used in these records

About this file

File size
424 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Approved Decision Notice - MCU24 0094 [As Published].pdf · 424 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.