Council archive · source document
08/0197 - MCU - Detached House DJ Leach Pty Ltd [As Published] · 132008.197
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007 CONTAMINATED LAND - REGISTERED LAND 25 1s any part of the land forming the premises on the Environmental Management Register or Contaminated Land Register under the Environmental Protection Act 1994? : No 0 Yes If yes, does one or more of the following apply? * Assuitability statement has been given and a site management plan has been approved for the (No (1) Yes proposed use of the land, and the proposed use involves only the following - . «the fit-out of a building on the land; or «minor site excavation, including for example, post holes for open-sided non-habitable structures ¢ There is currently a notifiable activity on the land and the activity is continuing [no (Yes © The proposed use is industrial and only involves minor site excavation (0.9. post holes for open- [CJNo (1) Yes sided non-habitable structures) © The land is used for a mining activity or petroleum activity [LJNo [Yes if no to all - (Complete Part N) This application requires assessment by the Environmental Protection Agency (EPA). if EPA is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. IPA, schedule 8, part 1, table 2, item 5 IP Regulation, schedule 2, table 2, item 22 CONTAMINATED LAND - NOTIFIABLE ACTIVITY 26 Is any part of the land forming the premises currently used for a notifiable activity, or if there is no existing use was it last used for a notifiable activity? No 1 Yes If yes, does one or more of the following apply? ¢ A suitability statement, removing the land from the environmental management register, has [No () Yes been given under the Environmental Protection Act 1994 for the existing use, or if there is no existing use, the last use, and the following both apply - . « no new notifiable activity has occurred on the land since the suitability statement was issued, «the land is not otherwise contaminated by a hazardous contaminant * A ssuitability statement has been given and a site management plan has been approved for the (No (Yes proposed use of the land, and the proposed use involves only the following - «the fit-out of a building on the fand; or + minor site excavation, including for example, post holes for open-sided non-habitable structures ¢ — The land is used for a mining activity or petroleum activity (No (J Yes if no to all - (Complete Part N) This application requires assessment by the Environmental protection Agency (EPA). if EPA is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. IPA, schedule 8, part 1, table 2, tem 6 IP Regulation, schedule 2, table 2, item 22 -12-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0197 - MCU - Detached House DJ Leach Pty Ltd [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.