Council archive · source document
08/0197 - MCU - Detached House DJ Leach Pty Ltd [As Published] · 132008.197
INTEGRATED PLANNING ACT 1997 : IDAS Assessment Checklist, Version 21.0, 3 September 2007
COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA
4.14
Is any of the operational work proposed to be carried out within a coastal management district?
( No
1 Yes
If yes, is the proposed operational work for the following?
Interfering with quarry materia! on State coastal land above high-water mark [no (1) Yes
© Disposing of dredge spoil or other solid waste material in tidal watera (ino [Yes
Draining or allowing drainage or flow water or other matter across State costal land above [INo [J Yes
high-water mark
Constructing or installing works in a watercourse where the works are not assessable under (No [) Yes
IPA, schedule 8, part 1, table 4, items 3 or 4
e Reclaiming land under tidal waters (No [1 Yes
¢ — Constructing an artificial waterway, other than a canal, associated with reconfiguring a lot [No (Yes
© Constructing an artificial waterway that Is a canal, associated with reconfiguringa L]No (_] Yes
lots .
¢ — Constructing an artificial waterway not associated with reconfiguring a lot on land, other than CINo (1) Yes
State coastal land, above high-water if the maximum surface area of water on the waterway
is at least 5,000m?
¢ — Constructing a bank or bund wall to establish a ponded pasture on land, other than State CUNo (1 Yes
coastal land, above high-water mark
¢ Removing or interfering with coastal dunes on land, other than State coastal land, that is in (No (J Yes
an erosion prone area and above high-water mark
tyes to one or more, is any of the proposed work to be carried out in a wild river area under the Wild Rivers Act 2005?
(J No - (Complete Part M) This application requires assessment by the Environmental Protection Agency (EPA). If EPA is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. if yes, above, fo any
shown bold and marked with the symbo! 8, the application also requires assessment by Queensland Transport {Marine
Safety Qid) as Concurrence Agency.
OO Yes
if yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
CO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment
Manager must refuse to receive it (Complete Part M} This application requires assessment by the Environmental
Protection Agency (EPA). if EPA is not the Assessment Manager for the application, the agency has jurisdiction
as concurrence Agency. if yes, above, fo any shown bold and marked with the symbo!, the application also
requires assessment by Queensland Transport (Marine Safety Qld} as Concurrence Agency. Subject to the
declaration for the relevant wild river area, the application also requires assessment for the purposes of the Wild
Rivers Act 2005.
(11 _No - An application for the operational work would be taken to be not properly made and the Assessment Manager
must refuse to receive it.
IPA, schedule 8, part 1, table 4, item 5
IP Regulation, schedule 2, table 2, items 12 and 14
IP Regulation, schedule 1, part 3, table 4, items 4A and 5
Coasta! Protection and Management Act 1995 Act 1995, section 104A (wild river area)
Wild Rivers Act 2005. section 43A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0197 - MCU - Detached House DJ Leach Pty Ltd [As Published]Related documentApplication case desk ↗
About this file
- File size
- 5.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.