NOOSA COUNCIL
APPROVED PLAN
OPW17/0561.01 17 OCT 2018
As amended by Council
Brief Specification Notes
1.0 Standards 3.2 Planting
General
1.1 Soils
· Individual plantings in grassed areas: Excavate a hole to twice the diameter of the root ball and at least 100 mm deeper than the root ball. Break up the
· Site and imported topsoil: To AS 4419. base of the hole to a further depth of 100 mm, and loosen compacted sides of the hole to prevent confinement of root growth.
· Potting mixes: To AS 3743. · Watering: Thoroughly water the plants before planting, immediately after planting, and as required to maintain growth rates free of stress.
· Composts, soil conditioners and mulches: To AS 4454. · Placing: Remove the plant from the container with minimum disturbance to the root ball, ensure that the root ball is moist and place it in its final position,
in the center of the hole and plumb, and with the top soil level of the plant root ball level with the finished surface of the surrounding soil.
2.0 Products · Fertilising plants: In planting beds and individual plantings, place fertiliser pellets around the plants at the time of planting.
· Backfilling: Backfill with topsoil mixture. Lightly tamp and water to eliminate air pockets.
2.1 Material
3.3 Mulching
Topsoil
· Source: Provide topsoil, which contains organic matter, will support plant life and is free from stones, contaminants and weeds. Placing mulch
· Site: If available, provide material recovered from the site. · General: Place mulch to the required depth, clear of plant stems, and rake to an even surface flush with the surrounding finished levels. Spread and roll
mulch so that after settling, or after rolling, it is smooth and evenly graded between design surface levels sloped towards the base of plant stems in
Fertiliser
plantation beds, and not closer to the stem than 50 mm in the case of gravel mulches.
· General: Provide proprietary fertilisers, delivered to the site in sealed bags marked to show manufacturer or vendor, weight, fertiliser type, N:P:K ratio,
· Depths: Spread organic mulch to a depth of 75 mm, and gravel mulch to a depth of 50 mm.
recommended uses and application rates.
3.4 Stakes and ties
Plants
· Health: Supply plants with foliage size, texture and colour at time of delivery consistent with the size, texture and colour shown in healthy specimens of the Stakes
nominated species. · Material: Hardwood, straight, free from knots or twists, pointed at one end.
· Vigour: Supply plants with extension growth consistent with that exhibited in vigorous specimens of the species nominated. · Installation: Drive stakes into the ground at least one third of their length, avoiding damage to the root system.
· Damage: Supply plants free from damage and from restricted habit due to growth in nursery rows.
Ties
· Pests and disease: Supply plants with foliage free from attack by pests or disease.
· General: Provide 50 mm hessian webbing ties fixed securely to the stakes, one tie at half the height of the main stem, others as necessary to stabilise the
3.0 Execution plant.
The Project Arborist must supervise any excavations within the
3.5 Watering
3.1 Preparation tree protection zone of Endiandra sieberi (Corkwood) identified
as Tree 28 on the approved plan set Establishment
Weed eradication
· Extent: Available soil moisture content of grass areas and garden beds to be monitored on a weekly basis using an approved moisture probe and water
· Herbicide: Eradicate weeds with a non-residual glyphosate herbicide in any of its registered formulae, at the recommended maximum rate. applied on a demand basis. Readings should be taken at a depth of 200-300mm.
Earth mounds · All grass areas and garden beds should be maintained within a range of 50-80% available soil moisture. Under no circumstance should areas under
· Placing: Place clean filling in layers approximately 150 mm thick compacted to 85% of the dry density ratio of the surrounding soil as determined by irrigation fall below a level of 30% available soil moisture.
AS 1289.5.4.1. Minimise slumping and further internal packing down. · No visible signs of wilting of leaves or stems, with all plants fully turgid at all times.
Edges · No sign of over-watering such as constantly wet soil, brown leaf margins, stem rot or brown spots on foliage.
· Construct changes in grade over a minimum width of 500 mm to smooth, gradual and rounded profiles with no distinct joint. 3.6 Completion
Existing trees Cleaning
· Maintain the natural ground level under the canopy. · Stakes and ties: Remove those no longer required at the end of the planting establishment period.
Planting beds · Temporary fences: Remove temporary protective fences at the end of the planting establishment period.
· Excavated: Excavate to bring the subsoil to at least 300 mm below finished design levels. Shape the subsoil to fall to subsoil drains where applicable. Break
4.0 Establishment & defects liability
up the subsoil to a further depth of 100 mm.
· Unexcavated: Remove weeds, roots, building rubbish and other debris. Bring the planting bed to 75 mm below finished design levels. 4.1 Establishment
· Services and roots: Do not disturb services or tree roots; if necessary cultivate these areas by hand.
General
Placing topsoil
· All landscaping works will have an establishment period of 26 weeks in which the subcontractor will be responsible for the maintenance and upkeep of
· General: Spread the topsoil on the prepared subsoil and grade evenly, making the necessary allowances to permit the following: the contracted scope, unless otherwise noted in the project documentation. If applicable refer to the project manager / builder for confirmation.
· Required finished levels and contours may be achieved after light compaction.
4.2 Defects Liability Period
· Grassed areas may be finished flush with adjacent hard surfaces such as kerbs, paths and mowing strips.
General
Topsoil depths
· All landscaping works will be subject to a defects liability and maintenance period of 52 weeks, commencing from the date of Practical Completion,
· General: Spread topsoil to the following typical depths:
unless otherwise noted in the project documentation. If applicable refer to the project manager / builder for confirmation.
· Excavated planting areas: If using organic soil, 300 mm. Refer to typical soil profile detail.
· Irrigated grassed areas generally: 150 mm.
· Irrigated grassed areas, heavy use (e.g. playing fields, playgrounds, and public parks): 200 mm.
PROJECT:
AMENDMENT
RESIDENCE AT 12 PARK RD, NOOSA HEADS ISSUE
A
DATE
27.07.18
DETAILS
FOR COUNCIL APPLICATION
THE DESIGNER MUST BE PRESENT ON-SITE FOR THE POSITIONING OF ALL PLANTS. DRAWING: DWG No: MB_12PR_55 CHECKED: MP
The Stable, 105 Lawrence St, Alexandria, Sydney, NSW, 2015, Australia CLIENT:
B 30.07.18 FOR COUNCIL APPLICATION CONTACT DESIGNER IF DISCREPANCIES OCCUR BETWEEN LANDSCAPE AND CONSULTANTS DOCUMENTS.
BUILDER TO CHECK AND VERIFY ALL DIMENSIONS ON SITE PRIOR TO CONSTRUCTION.
SPECIFICATION NOTES SCALE:
DRAWN:
1:50 @ A1
SM
DATE:
ISSUE:
30.07.18
B
PH +61 2 9565 5529 | www.mylesbaldwin.com
PENINSULAR AVIATION PTY LIMITED TRUSTEE THIS DRAWING IS COPYRIGHT
FOR THE PENINSULA AVIATION TRUST
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW17/0561.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.