TRAFFIC MANAGEMENT
The first operation will be the installation of the micro piles and
excavation of footings. During this stage the builder shall
engage the services of a traffic management company to
ensure there is no interference to the general traffic using Park
Road. Traffic controllers will be required to be present to divert
vehicles during the installation of micro piles and excavation of
footings.
Traffic controllers will divert all vehicle deliveries and departures
to the site on Park Road. The timing of deliveries shall be such
that they do not coincide with peak usage times in Park Road.
Refer to Traffic Guidance Scheme prepared by Evolution Traffic
Control for details of proposed traffic management.
The builder warrants that using the procedures nominated above
the elevated terrace can be safely constructed with minimal
impact on the environment including the protected trees.
Original Construction management plan produced by
STEFAN PRYSTUPA, B.Eng. (Civil); Mideast; C.Eng.; RPEQ Sep 2017
Kind regards
Kurt Brown
AQF Level 5 Arborist
ISA TRAQ Certified Arborist
Australian Tree Contractors & Arboricultural Consultants Pty Ltd
We manage the trees you care about and remove the trees you worry about
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW17/0561.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.