Compiled Approved Plans OPW17/0561.01
Plans and drawings: the text below has words only, no drawings.
storm water system.
□ Erosion and Sediment Control for the proposed terrace will
require a silt fence to the perimeter of the proposed footing
excavation.
□ The permanent storm water drainage system will be connected
to the Council system as an early works operation to prevent
any concentrations of runoff discharging onto the sand slope.
Environmental Controls Plan to prevent pollution from
concreting operations during the construction (Grouting & Pile
Caps)
Background.
The use of concrete materials is reduced to a minimum due to the use of
a micro piling system which is to be craned onto site.
The small volumes of concrete required allow the use of a small
concrete grout pump with reduced line size to grout piles and concrete
pile caps.
This system gives precise control to the operators making spillage and
cleaning requirements negligible.
Controls:
The builder/site manager will ensure the following best practice sediment
control measures including a designated wash down area are in place
before work starts and are adequately maintained throughout construction.
• The designated wash down area is to be located within the site on the
existing paved driveway with sediment control screening in place and
an appropriate HDP waste receptacle drum will be available to retain
any sediment waste from swept up spillage or cleaning of equipment.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW17/0561.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.