Council archive · source document
Compiled Approved Plans OPW17/0561.01
Plans and drawings: the text below has words only, no drawings.
• The chute contents will be washed into the sediment receptacle drum and
sealed with a lid before leaving the site.
▪ The drum will be secured onto the main frame of the vehicle
ready for transportation.
▪ The drum will be secured with a bracket that is easily
accessible to the operator.
▪ The drum will be removed from the bracket and the waste
water emptied into the designated treatment facility once the
truck returns to the yard with the wastewater containing
suspended solids being recycled back into the plant.
• The vehicle will be washed down at the depot.
• Delivery vehicles will be on paved surfaces at all times and so no mud soil
and or stones will be carried off site as pollutants.
• Inspect roads for any sediment that has been tracked off site and
sweep it back on site.
• (This will be done if there is threat of rain and at the end of each day). A hose will
not be used to wash it away.
INSTALLATION OF PILES AND CAPPING
Methodology for installation of hollow bar micropiles as deep foundation
support for the new timber deck.
The micropiles consist of one or more outers steel casings installed to
the depths indicated on the piling subcontractor (PCA) drawings. A
central steel reinforcing element consisting of a 40/20 hollow bar is to
extend to a pre- determined design depth below the casing to form the
bond length and develop the applied load.
After checking the the project drawings for the details of the micropile
arrangement for each pile location (designed in accordance with the Tree
protection plan.) the Tree protection plan, the construction management
plan and relevant environmental protection documentation and
instructions the rig will be craned into position for the first pile onto a
previously established level temporary protective platform constructed in
accordance with the tree protection plan and AS4970 - 2009.
Drilling will be carried out using a 90mm EXX drill bit using a rotary top
hammer for installation and all installation specifications accurately
recorded for this and all subsequent piles.
The piles are grouted as the work proceeds and any excess grout is
collected and pumped into storage containment for offsite disposal in
accordance with the concreting operations environmental protection
plan.
The process is repeated for subsequent piles.
The onsite grouting pump will be contained within its own bunded area
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW17/0561.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.