J000750-001-L-Rev0
31 August 2018
Photo 3: Proposed lift shaft area
Further to the site walkover, Core has reviewed the results of the WALLAP analysis prepared by PCA (ref
Image 1). Based on the information provided by PCA, it is understood the proposed temporary excavation
support comprises a 0.35 m diameter contiguous pile wall installed to about 10.5 m depth. During excavation
for the lift shaft, the contiguous piles will be supported by a steel ring beam and props at about 1.6 m to 1.8 m
vertical centres.
Following review of the PCA analysis, the modelling was re-run by Core using slightly more conservative soil
parameters (ᶲ = 27° for loose sands & 32° for medium dense sands). The result of our analysis indicates that
a factor of safety against global instability of at least 1.5 is achieved. This is considered to be satisfactory.
Image 1: Proposed excavation and strut support layout
3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans OPW17/0561.01.pdfRelated documentApplication case desk ↗
About this file
- File size
- 9.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.