Original source · versioned page text
Appendix C - Flood Report_Sept2020
PROJECT PAGE No 2 PEARSONS RD, COOROY - FLOOD / DETENTION ASSESSMENT ZO PRELIMINARY Desi CW REVESIONS i D Dee, 4 Ores by 2:) m, > 29.8 “Qesi Jot OO yi Bee ra lot O.2n, Dead 5 Ferage Ve fame be comes: . Lede Valu | = isan 0.2 = Bo lam? >) End \Prjs nS = 2x SKOOL KOLKOS = 1 Oms 24 = Side PA sas = 2xi9xOo.2 xO. xes = 2.303 DA Volume To O.alm Free hore Beames: ==> Newt => > (DUBE) R16 =27nF Line Shrege = SU +27 = 38/ as Coma. Velsas | = 152 |K 420 = 184.4m> Erd Prtgnd = 2KEK/AZ X3ExOS = Su lm 2 Smo Sida Pris as = RID yf 2y 3-6 nO.S = F2 Ant - Carper Gre 12 Breas xX 72* 472 = 16/3 7 Neti Le Sferage = 31S -3y = 28/ wn. (Agra J “ee4 she rt et SIS Le required ) @ Lehghon Absin 7.5m So B Ba no Shim 010 yr watered R-Seett , abo re dead stay \ yo / top ee BLY hsm = An * > Ned. Live Storage = 26/ a AZ = 324 m* SAY short of SIS = required ) / B Wider delete J. On| ps hs wert 2917 ldoyr_watelvan as x- sat abhere dood shrag c At Be be 23-7 yr Sh, | 47 n> Shor? of SIS | DGOGLE m rege mint, 7/2 fée
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.