Original source · versioned page text
Appendix C - Flood Report_Sept2020
Callaghan & Toth
2.0 FLOOD IMMUNITY
The 100 year flood levels across the north-east corner of the site have been abstracted from a flood study
undertaken by Brisbane Stormwater Management Pty Ltd for the adjoining Erindale Development in 2014. The
relevant flood levels are 100.19 m AHD across the eastern (upstream) boundary of the site and 99.85 m AHD across
the northern (downstream) boundary of the site. Those flood levels are marked on Figures 3.2 and 3.3 hereafter,
together with the inferred 100 year flood boundary between those two levels.
The proposed lots are seen, in comparison to the 0.5 metre contours on Figure 3.3, to be at least 1.5 metre above
the flood profile and should therefore be immune to 100 year flooding, even with a 20% impost on the design rainfalls
for future climate change.
The only intrusion of the development into the 100 year floodway is seen to be a small part of the outer batter of the
proposed detention basin. The loss in 100 year flood storage as a result of this intrusion is estimated to be about 9
cubic metres, which should have practically no impact on the 100 year flood profile.
6
2035 2 Pearsons Road – Flood Study September 2020
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.