Skip to the record
The only place to find full transcripts.

Original source · versioned page text

Appendix C - Flood Report_Sept2020

of 40

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

ail

Callaghan & Toth

 

   

\ 0 SCALE 50m

be

 

Figure 3.2 URBS Model Of The Post-Development Catchment Condition

The models’ operating parameters comprised the commonly-used default value of 1.2 for the alpha
parameter and an m (non-linearity) exponent of 0.8. The initial rainfall loss was set at 20 mm and the
continuing loss rate was set at 2 mm/hr, for all of the modelled ARI’s from 1 year to 100 year.

The models’ predictions of the peak outflow rates from the system, at the location of the outflow from the
proposed detention basin, are summarised in Table 1 hereafter. That tabulation also includes Rational
Method calculations of the peak outflow rates, to provide a sanity check on the models’ performance.

Table 1: Predicted Peak Outflow Rates (m3/sec)

 

 

 

ARI Pre-Development Post-Development
(years) URBS Rational Method URBS Rational Method

100 0.93 1.08 1.06 1.27

20 0.62 0.59 0.74 0.73

5 0.43 0.40 0.53 0.48

1 0.16 0.21 0.25 0.25

 

 

 

 

 

 

 

2035 2 Pearsons Road — Flood Study September 2020

 
Log in to download the original file

Appendix C - Flood Report_Sept2020.pdf · 9.0 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.