Log in to see the plans as drawnPROPOSAL REPORT Waste Management Plan for Type 2 Intensive (Agriculture) at 305 Lake Macdonald Drive, Lake Macdonald described as Lot 1 on SP108094 Applicant: Como Glasshouse Pty Ltd Prepar ed: June 2015 R01569- 01 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.
Full text of the other 2 pages
Page 2
Waste Management Plan for Premises at 305 Lake Macdonald
Drive, Lake Macdonald Described as lot 14 on SP108094
1.0 Purpose of The Waste Management Plan
The purpose of this Waste Management Plan is to address waste minimisation and reuse of waste products
generated as part of day to day operations of the subject site for intensive agriculture (cropping) within a
greenhouse.
2.0 Application of The Waste Management Plan
This plan applies to intensive agriculture proposed for the site under Council application – MCU 14/0039.
This plan is to be read in conjunction with the submitted plans numbered D- C01569-06-A & B prepared by
rd
Martoo Consulting and dated 23 June April 2015.
3.0 Waste Management Plan
Typical Waste Estimated Treatment Reuse Recycle Disposal
Stream Volume
Garbage generated 205m3 per Collected and Cleanaway
(total) year disposed in
relevant bin area
Paper 1x240lt bin Collected and N/A Yes Cleanaway
per year placed in
recycling
container on site
Cardboard 2x240lt bin Collected and N/A Yes Cleanaway
per year placed in
recycling
container on site
Glass Minimal Collected and Yes Cleanaway
(possible placed in
staff lunch recycling
container on site
waste)
Aluminium N/A N/A N/A N/A
Steel N/A N/A N/A N/A
Plastic containers 20 Collected and Yes These containers
Containers placed in are cleaned and
recycling stored on a pallet in
container on site accordance with the
company protocol
then taken to the
drum muster site.
Plastic wrap/bags 1x 4.5m3 Collected and yes Yes 40 pallets per year
fertiliser per year disposed in bins use shrink wrap,
on site. fertiliser bags are re-
used and then
disposed of by
Cleanaway
Plastic N/A N/A N/A N/A
components
Polystyrene N/A N/A N/A N/A
Foam N/A N/A N/A N/A
Vinyl N/A N/A N/A
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Page 1 of 2
Page 3
Rubber N/A N/A N/A
Timber N/A N/A N/A
Plant/vegetative 30m3 per Mulched on site The organic waste is
week composted on mulched on site to
site break it down and
composted.
Growing medium 10x 20m3 Collected and These bins are
disposed in bins located at the door
skips on site. of the greenhouse
for two weeks during
the ‘pull out’, any
non-organic material
is removed in these
bins by Cleanaway,
all plant material is
mulched and
composted on site.
3.1 Disposal of Refuse
Site manager will be responsible for collection and disposal of refuse to the designated bin and
recycling areas located outside the multi-purpose shed
All bins are to be stored and located in the bin area. ‘Wheelie’ bins are located in the staff room and
in the greenhouse, these are emptied into the dumpster when full and they contain general waste
from the staffroom and the used vinyl gloves from the greenhouse.
Bins emptied every 12 weeks by Cleanaway or when the 4.5m3 dumpster is filled.
3.2 Waste Storage and Recycling Area
The waste storage and recycling areas are located outside the multi-purpose shed. The bin area
will be constructed in accordance with Council policy.
3
The area can contain at least 6 x 1.1m dumpsters and will be utilised for general waste and
recycling.
.
--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
Page 2 of 2