Attachment G - Waste Mangmtn plan

Attached to the e-mail MCU14/0039 Response to information request Traffic, Effluent& Waste reports email 3 of 3.

of 3

Page text shows just the words. Original shows the document exactly as it was published.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
        Rubber                                N/A                        N/A                             N/A


        Timber                                N/A                        N/A                             N/A
        Plant/vegetative                      30m3 per                   Mulched on site                                                              The organic waste is
                                              week                       composted on                                                                 mulched on site to
                                                                         site                                                                         break it down and
                                                                                                                                                      composted.
        Growing medium                        10x 20m3                   Collected and                                                                These bins are
                                                                         disposed in bins                                                             located at the door
                                              skips                      on site.                                                                     of the greenhouse
                                                                                                                                                      for two weeks during
                                                                                                                                                      the ‘pull out’, any
                                                                                                                                                      non-organic material
                                                                                                                                                      is removed in these
                                                                                                                                                      bins by Cleanaway,
                                                                                                                                                      all plant material is
                                                                                                                                                      mulched and
                                                                                                                                                      composted on site.



             3.1 Disposal of Refuse

             Site manager will be responsible for collection and disposal of refuse to the designated bin and
             recycling areas located outside the multi-purpose shed

             All bins are to be stored and located in the bin area. ‘Wheelie’ bins are located in the staff room and
             in the greenhouse, these are emptied into the dumpster when full and they contain general waste
             from the staffroom and the used vinyl gloves from the greenhouse.

             Bins emptied every 12 weeks by Cleanaway or when the 4.5m3 dumpster is filled.




             3.2 Waste Storage and Recycling Area

             The waste storage and recycling areas are located outside the multi-purpose shed. The bin area
             will be constructed in accordance with Council policy.
                                                                                   3
             The area can contain at least 6 x 1.1m dumpsters and will be utilised for general waste and
             recycling.

             .




--------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------
                                                                                                                                                                       Page 2 of 2
Log in to download the original file

Attachment G - Waste Mangmtn plan.pdf · 642 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.