Council archive · source document
Operational Works Delegated Report - OPW13/0463 PRELIMINARY APPROVAL
DELEGATED ASSESSMENT AND DECISION REPORT from: WORKS ASSESSMENT Application No: OPW13/0463 Date: 1 August 2013 Author: Mark Lewis - Senior Engineering Officer Project Director: Simon Aalbers - Principal Development Engineer SUMMARY Applicant: Bligh Tanner Pty Ltd Consultant (if applicable): Bligh Tanner Pty Ltd Proposal: Development Permit for Operational Work (Engineering Works - Stormwater Earthworks Carparking & Landscaping ) Assessment Type: Code Property Address: 2 Girraween Ct SUNSHINE BEACH QLD 4567 Property Number: 161394 RP Description: Lot 3 RP 887636 Land Area: 11200.000 Square Metres Planning Scheme: The Noosa Plan (8 August 2011) ASSESSMENT Higher Order Approval and Compliance with Conditions The works are required to address the conditions of the higher order approval MCU12/0133. Unless otherwise stated, all conditions of this Decision Notice must be complied with prior to the use commencing, and then compliance maintained at all times while the use continues. Development authorised by this approval must be undertaken generally in accordance with the Approved Plans listed within this Decision Notice. The total number of enrolled students for the educational establishment must not exceed 80. The maximum height of the development must not exceed 8 metres above the finished ground level and the natural ground surface. Conditions 1-4 Compliance Security in the form of a cash bond or trading bank guarantee to the sum of $20,000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the issue of a Development Permit for Operational Works. The cash bond or trading bank guarantee will be returned on performance of the conditions of approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. Bond not paid as at 1/8/13. As the bond has not been paid it is recommended that a preliminary approval only be issued. The development site must be landscaped*. The works must be undertaken in accordance with an Operational Works approval and the Noosa Plan Planning Scheme Policy 3 Landscaping Plants and Guidelines and must include in particular: a 10 metre wide landscaping strip along the Girraween court road frontage of the subject site, exclusive of the access road, pedestrian path and infrastructure connections only and uncompromised by any other infrastructure items. Infrastructure connections should be co-located wherever feasible, particularly with the access road and pedestrian path, to minimise disturbance to this landscaping strip. Multiple connection points should be avoided. The area is to be rehabilitated with dense planting with progeny of the Allocasuarina littoralis She Oaks, with seed stock sourced from the active Glossy Black Cockatoo food trees on the development site. details of protective fencing to provide a visual and physical screening (to standard temporary fencing height) of the construction works from Allocasuarina littoralis trees which are being actively used as food trees by Glossy Black cockatoos. details of all the Allocasuarina littoralis She Oaks actively used by Glossy Black cockatoos, regardless of diameter, to be impacted upon by the development. landscaping works to pathway area to the west adjacent to the eastern edge of the tennis courts. These works are to include the careful removal of the concrete pathway without interfering significantly with vegetation designated for retention. The area is to be rehabilitated with dense planting with progeny of the Allocasuarina littoralis She Oaks, with seed stock sourced from the active Glossy Black Cockatoo food trees on the development site. landscaping works to pathway area north of the site to the full extent of the site’s northern boundary without compromising the functional integrity of the fauna fencing to Eenie Creek Road. The area is to be rehabilitated with dense planting with progeny of the Allocasuarina littoralis She Oaks, with seed stock sourced from the active Glossy Black Cockatoo food trees on the development site. details of an offset programme that satisfies the requirements of these conditions and includes agreements with landholders in the vicinity which demonstrate acceptance and maintenance of plantings of progeny of the Allocasuarina littoralis She Oaks, with seed stock sourced from the active Glossy Black Cockatoo food trees on the development site. The offset program is to provide 5 individual plantings of progeny of the Allocasuarina littoralis She Oaks for every one Allocasuarina littoralis She Oaks removed to facilitate the development footprint. all progeny planting of Allocasuarina littoralis She Oaks required by these conditions are to be certified by a suitably competent person as being sourced from the seeds of active Glossy Black Cockatoo food trees on the development site. translocation of grasstrees (Xanthorrhoea spp.) to be impacted upon by the development within the landscaping areas. details of any fencing (boundary or otherwise) or other works that have the potential to impact on vegetation nominated for retention removal of all weeds species listed in the following standards and legislation: declared plants under the Land Protection (Pest and Stock Route Management) Act 2002 and sub-ordinate Regulation 2003 Undesirable species as listed in Noosa Plan Planning Scheme Policy 3 Landscaping Plants and Guidelines *(Refer to Advisory Note) All landscape works must be established and maintained in accordance with horticultural best practice with construction techniques and irrigation that allow for healthy, sustained and vigorous plant growth. All plant material must be allowed to grow to full form and be refurbished when its life expectancy is reached. All landscape works must be maintained generally in accordance with the approved design for the life of the development. All works must be carried out in accordance with Drawing Number 12-186 LP-01 and Drawing Number 12-186 LP-02 of the Vegetation Management Plan listed within this Decision Notice with the exception of the following: Retention of the vegetation in the south eastern front boundary setback as per the Proposed External Works Plan revision B (2012-11-20) Fulton Trotter Architects. The Vegetation Management Plan must be resubmitted to Council incorporating the above amendments prior to the issue of any Development Permit for Operational Works.* *(Refer to Advisory Note) The trees identified for retention or planting in the conditions of this approval listed within this Decision Notice must be maintained in good health in accordance with best horticultural practice. A “no clearing zone” must be established and maintained over the land area over the area identified as Tree Protection Zone on Drawing Number 12-186 LP-01 of the Vegetation Management Plan and including retention of the vegetation in the south eastern front boundary setback as per the Proposed External Works Plan revision B (2012-11-20) Fulton Trotter Architects, as amended by these conditions. The following activities must not be carried out within the no clearing zone: clearing, cutting down, poisoning, lopping or pruning of native vegetation which is indigenous to, or planted within, the zone soil/spoil dumping and/or compacting soil excavation, other than for planting indigenous native plants. The following exceptions apply: declared plants under the Land Protection (Pest and Stock Route Management) Act 2002 and sub-ordinate Regulation 2003, and Undesirable species as listed in Noosa Plan Planning Scheme Policy 3 Landscaping Plants and Guidelines indigenous native trees which pose a well-founded threat to persons or property as approved in writing by Council The development must be carried out in accordance with a Bushfire Management Plan prepared by a qualified person* and referenced in a Development Permit for Operational Works. The Bushfire Management Plan must accommodate the retention of all of vegetation as required by the conditions contained herein. The Bushfire Management Plan must be properly endorsed by Queensland Fire and Rescue Services and a copy of the endorsement must be provided to Council with any application for operational works. *(Refer to Advisory Note) A copy of the Bushfire Management Plan for the development must be provided to the nearest fire authority. A bushfire evacuation plan for the site must be prepared by a qualified person* and submitted to Council prior to the issue of any Development Permit for Operational Works. *(Refer to Advisory Note) Conditions 6 – 15 addressed by Landscaping A copy of the bushfire evacuation plan for the development must be provided to the nearest fire authority. Compliance ENGINEERING Site Access and Driveways A sealed or suitable permeable surface access driveway must be provided from Girraween Court to all parking and manoeuvring areas of the development. The driveway must be located generally in accordance with drawing number 3286NO03-DA-03 revision B prepared by Fulton Trotter and varied to ensure that the construction and use of the driveway will not adversely affect the adjacent significant vegetation. The works must be undertaken in accordance with an Operational Works approval and must include in particular: a driveway crossover in accordance with IPWEAQ standard drawing SEQ R- 051 a maximum driveway width of 6 metres within the Girraween Court road reserve and widened within the site where necessary to permit vehicles to pass suitable safety measures, including warning signage, to improve driver awareness of pedestrians and enhance pedestrian safety. a sealed or suitable permeable surface driveway for the full length of the access to the proposed internal boundary, including underground service conduits for the necessary services. Car Parking A total of 9 car parking spaces must be provided and marked on the site. The works must be undertaken in accordance with an Operational Works approval and must include in particular: 3 staff parking spaces within the total, which are clearly marked for that purpose 1 disabled parking space within the total All car parking areas and access driveways must be maintained exclusively for vehicle parking and manoeuvring and kept in a tidy and safe condition at all times. Service Vehicles Service vehicle manoeuvring and access must be provided on the site for servicing the adjoining lot to the east. The works must be undertaken in accordance with an Operational Works approval and in particular must include area sufficient to allow a refuse vehicle access to the adjoining lot to the east. Pedestrian and Bicycle Facilities Pedestrian and bicycle facilities must be provided for the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular: pedestrian pathways between the proposed car parking area and the buildings adequate separation of all specific pedestrian routes from vehicle access and manoeuvring areas, signage and lighting at strategic locations to direct people to building entries a total of 16 bicycle parking spaces end of trip facilities involving 8 lockers, 2 male and female showers and change rooms. Submitted Plans Comply Stormwater Quality/Quantity Management The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken in accordance with an Operational Works approval and the Noosa Plans Water Sensitive Urban Design Code requirements, and must include in particular the works described in section 5.2 - Flooding impacts downstream of the site of the Stormwater Management Plan (Bligh Tanner Pty Ltd, Site Based Stormwater Management Plan, Job No. 2012.167.600, 8 August 2012) listed in this Decision Notice. A stormwater quality treatment system must be provided for the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular provision of stormwater quality treatment devices including rainwater storage tanks of a size and location in accordance with those described and shown in the Stormwater Management Plan (Bligh Tanner Pty Ltd, Site Based Stormwater Management Plan, Job No. 2012.167.600, 8 August 2012) listed in this Decision Notice. Addressed by Hydraulics and Water Quality Earthworks and Retaining Walls All fill and associated batters must be must be undertaken in accordance with an Operational Works approval, and contained entirely within the subject site unless written permission from the respective landowner(s) is provided to Council. The submitted plans refer to approval from Council’s Property Section for the earthworks to extend in the adjoining property. This approval has been verbally confirmed but is qualified by the need to preserve significant vegetation. A suitable condition will be included in the development permit. Damage to Services and Assets Any damage caused to existing services and assets above or below the ground must be repaired: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. Compliance HYDRAULICS AND WATER QUALITY Stormwater Quality/Quantity Management The site must be provided with a stormwater drainage system connecting to a lawful point of discharge. The works must be undertaken in accordance with an Operational Works approval and the Noosa Plans Water Sensitive Urban Design Code requirements, and must include in particular: the works described in section 5.2 - Flooding impacts downstream of the site of the Stormwater Management Plan (Bligh Tanner Pty Ltd, Site Based Stormwater Management Plan, Job No. 2012.167.600, 8 August 2012) listed in this Decision Notice. A stormwater quality treatment system must be provided for the development. The works must be undertaken in accordance with an Operational Works approval and must include in particular: Provision of stormwater quality treatment devices including rainwater storage tanks of a size and location in accordance with those described and shown in the Stormwater Management Plan (Bligh Tanner Pty Ltd, Site Based Stormwater Management Plan, Job No. 2012.167.600, 8 August 2012) listed in this Decision Notice. Rainwater Harvesting Operating rainwater collection tank/s must be provided for the development. The tank/s must be provided in accordance with an Operational Works approval and must include in particular: A minimum total tank capacity of 20000 litres re-use of harvested rainwater for internal non-potable uses and outdoor uses. Certification must be submitted to Council from a qualified person* which certifies that the rainwater collection tank/s and associated reticulation has been installed in accordance with the requirements of this Decision Notice. Addressed by Hydraulics and Water Quality UNITYWATER Water & Sewer Construction activities must not impede the access of Unitywater or Fire Brigade personnel to vital infrastructure (eg. valves, fire hydrants and sewer access chambers). The fire-fighting demand on Unitywater’s water supply system from the development must not exceed 30 litres per second. Water meters must be located on alternative boundaries to electrical pillars. Buildings and other structures must maintain a minimum clearance of 1.5 metres from Unitywater sewer mains, and 1.0 metre from sewer manhole chambers and inspection openings. Storm water filtration/retention systems and gross pollutant traps must maintain a minimum clearance of 1.5 metres from Unitywater water supply and sewerage infrastructure. Tree plantings must maintain a minimum horizontal clearance of 1.0 metre from Unitywater water mains and 1.5 metres from Unitywater sewerage mains. Landscaping plants within these clearances must be low growing when mature and suitable approved varieties. Construction works undertaken in the vicinity of Unitywater water supply or sewerage infrastructure must not adversely affect the integrity of the infrastructure. All costs associated with repair, replacement or alteration of infrastructure must be met by the applicant. Compliance Applicable Codes The following Codes are applicable to this Application: Code for Transport, Traffic and Parking; Operational Works Code; Code for integrated Water Management; Code for Landscaping Design The application has been assessed against each of the above applicable codes and found to be compliant with, or can be conditioned to comply with, each. Planning Scheme Policies Not Applicable CONSULTATION Internal Referrals The application was forwarded to the following Internal Council Specialists; Environmental Assessment Unit Hydraulics and Water Quality Business and Property Planning Assessment Unit Their assessment forms part of this report. Referral Agencies Not Applicable RECOMMENDATION ISSUE A PRELIMINARY APPROVAL ONLY WITH CONDITIONS Application No. OPW13/0463 for a Development Permit for Operational Work (Engineering Works - Stormwater Earthworks Carparking & Landscaping ) as identified in the attached details recommended for the Decision Notice. DELEGATED AUTHORITY FOR APPLICATION NO. OPW13/0463 PROJECT MANAGER Signature: Date: Mark Lewis Senior Engineering Officer PROJECT DIRECTOR (if applicable) Signature: Date: Simon Aalbers Principal Development Engineer DELEGATED AUTHORITY REPORT FM8401S/0-26/03/2012 Page 2 of 7 FM8401S/0-26/03/2012 Page 1 of 1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Operational Works Delegated Report - OPW13/0463 PRELIMINARY APPROVALRelated documentApplication case desk ↗
About this file
- File size
- 340 KB (small file)
- File type
- DOC
No other editions are linked here.