MCU25.0067 Response to Further Advice
b) The servicing arrangement of 2 x 360L bins servicing 3 times a week is proposed, as preferred by
Council’s Waste Department.
c) Servicing details as follows:
▪ Residents will be responsible for transporting waste to the dedicated wheelie bin storage
area at ground level.
▪ Site management will ensure bins are presented for collection by Council’s service
provider (and will also be responsible for cleaning of the bins and storage area).
▪ Council collection contractor will undertake weekly servicing of the bins.
For further details, please refer to the attached Waste Management Plan.
3. Issue – Earthworks
The applicant’s response to Item 6 – Earthworks of Council’s Request for Information does not include any
new information for Council to assess. Council remains unable to accurately assess how the proposed
earthworks will impact adjoining properties.
It remains that the Bulk Earthworks Sections (DA.02, Rev. A) prepared by MPN Consulting do not reflect what
is shown on MPN Consulting’s Bulk Earthworks Plan (DA.01, Rev. A) or Studio Workshop Architects’ Ground
Floor Plan (DA100, Rev. 1) and Cross Section – Sheet 1 (DA301, Rev. 1).
For example:
a) the proposed retaining walls shown in Section 3 protrude ~0.55m and ~0.85m above the adjacent
natural surface levels to the north-western and south-eastern, respectively – it is unclear how the
area between the walls and property boundaries will be treated.
b) Section 3 details a second retaining wall on the south-eastern side of the subject site, however a
retaining wall is not shown in this section on the Bulk Earthworks Plan
c) Section 2 details a retaining wall on the north-western property boundary, however a retaining wall
is not shown in this section on the Bulk Earthworks Plan
d) Section 2 details a top of wall height that is ~2.33m above the adjacent natural surface level to the
south-east – it is unclear how the area between the wall and property boundary will be treated.
Information Required
Provide revised Earthworks Plans and Sections that are consistent with the application material. The revised
plans must be prepared by a suitably qualified person (RPEQ) and include, but not be limited to:
a) demonstrate compliance with the Earthworks Code;
b) details of all retaining walls (including levels, areas of backfill, etc.); and
c) levels of adjacent lots.
Please refer to the attached Further Information Response prepared MPN Consulting. To summarise the
response, neighbouring owners’ consents have been sought to pickup further levels through the
neighbours property as requested by Council, however no consent has been provided to date.
It is considered that for the purposes of the development application, sufficient information has been
provided. The additional survey data request by Council will be provided as part of the detailed design.
4. Issue – Landscaping Plan
The landscaping plan has not been amended reflect the increased landscaped setbacks.
Information Required
Provide revised landscaping plan.
Please see the attached Landscaping Plan prepared by LAUDink which has been amended to reflect the
increased landscaped setbacks.
PO Box 7657 East Brisbane Q 4169 | [email protected] | tpalliance.com.au
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (MCU25.0067 Response to Further Advice.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.