Council archive · source document
Viridian Stage 3 Documentation A3 [As Published] · 142008.256
Very large file (63.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 17, section 1. The text section number identifies this passage in the reader.
LANDSCAPE ARCHITECT
DRAWINGS ADJOINS L-SF-213
TE
TE
TE
TE
RP
TE
KS
TE
PA
TE
UT
OF WOR
SW1
ZONE
CLIENT
TE
UNDERCROFT TREATMENT
TE
BELOW TO BE CONFIRMED
ONSITE
UT
NO GO
TE
TE
EXTENT
PA
EXISTING VEGETATION TO BE
PROTECTED AND RETAINED.
PROTECTIVE AND SITE FENCING TO BE
TE
TE
CONSTRUCTED BY BUILDER. KEY PLAN
VERTICAL GABION EARTH
REINFORCED WALL BY CIVIL
CONTRACTOR
TE
TE
PA
X GRAVEL SWALE
BUSHMATES DECO TE PA
LD-9XX TE MAINTENANCE
UT
TRACK 3m WIDE
SW
1
TE
TE
RP
NOTES
LEGEND
T O F WORKS
PA EXTEN ZONE PA PLANTING AREA
NO GO RP
UT UNDERCROFT TREATMENT AREA
RP REVEGETATION AREA ONLY BY
OTHERS (NO GO ZONE)
DRAWINGS ADJOINS L-SF-210
TURF TURF AS SPECIFIED
RP PAVEMENT TYPES - REFER TO
P-
SCHEDULE AND SPECIFICATION
TIMBER DECKING TO DRIVEWAYS
BY BUILDER.
THRESHOLD TREATMENT REFER
TO SPECIFICATION
X OVERLAND FLOWPATH
LD-9XX TYPICAL SECTION EXISTING TREE TO BE RETAINED
FINAL LOCATION/PLACEMENT OF ALL
ROCK AND BOULDER WORK TO BE
CONFIRMED WITH LANDSCAPE
ARCHTIECT ON SITE. REFER TO
ENGINEERS DETAILS FOR BASINS. NOTE: REFER ENGINEERS DETAILS AND
SPECIFICATION FOR ALL WALLS.
EXISTING VEGETATION TO BE
PROTECTED AND RETAINED.
PROTECTIVE AND SITE FENCING TO BE
CONSTRUCTED BY BUILDER.
SHEET DETAILS
1m 0m 1m 2m 5m
SCALE: 1:100 @ A1 size sheet
Do not scale from this drawing.
Verify all dimensions on site prior to construction.
All dimensions are in millimetres unless otherwise noted.
AMENDMENT / ISSUE REGISTER
Issue Description Date Sign
PA PRELIMINARY REVIEW 28.11.07
P1 PRELIMINARY REVIEW 18.12.07
OP1 OPERATIONAL WORKS ISSUE 16.01.08
OP1 OPERATIONAL WORKS ISSUE 01.02.08
P2 PRELIMINARY REVIEW 05.02.08
T1 TENDER ISSUE 06.02.08
OP1 OPERATIONAL WORKS ISSUE 12.02.08
PROJECT
VIRIDIAN
STAGE 3
TITLE
SURFACE FINISHES
DRAWING INFORMATION
Design Drawn Date Scale Checked
DH JL 12.02.08 1:100
Project No. Drawing No. Issue
0551 2059.02 L-SF-211 OP1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Viridian Stage 3 Documentation A3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 63.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.