Council archive · source document
Viridian Stage 3 Documentation A3 [As Published] · 142008.256
Very large file (63.1 MB): the whole original can take several minutes to open, especially on a phone. Text is quick to read.
Original PDF page 31, section 1. The text section number identifies this passage in the reader.
SW2
LANDSCAPE ARCHITECT
DRAWINGS ADJOINS L-PP-404
SW1
2 BAC cit 8.6m2 MIX D2 77m2 MIX E
SW
1 BAC cit 1 FLI sch
1
2.2m2 MIX B
1 ALE cor 1 ACM smi
1 ALE cor
12m2 MIX D1
3 ARC cun (3m,4m,5m)
CLIENT
2m2 MIX D1
SW1
15m2 MIX E
1 ACM smi 1 GLO fer
6 ARC cun (3m,4m,5m)
2.2m2 MIX D1 GARAGE
FFL 28.800
4 CYA coo KEY PLAN
1 ARC cun (4m)
3m2 MIX B GARAGE 1 BAC cit
FFL 30.000
79 RAN cha
GARAGE
FFL 31.000 84 DIA cae
1 CUP ana 1 GLO fer
14m2 MIX E 67 RAN cha
2.3m2 MIX B 1 ALE cor
33 DIA cae
6 ALP cae
15 ALP cae
4m2 MIX G 4m2 MIX G NOTES
31m2 MIX F 3 ARC cun (3m,4m,5m)
10-106a 10-107a 6m2 MIX E2
FFL 31.000 FFL 30.500 1 GUI sem
15 DIA cae
7m2 MIX G
13 ARC cun (3m,4m,5m) 2 ARC cun (3m,4m) UNDERCROFT TREATMENT AREA
1m2 MIX B
DRAWINGS ADJOINS L-PP-406
14m2 MIX E 11 BLE car
DRAWINGS ADJOINS L-PP-408
1 CYA coo
21.4m2 MIX H 3 ARC cun (3m,4m,5m) GENERAL PLANTING AREA
DECK
FFL 37.470
21m2 MIX F
EXISTING TREE TO BE RETAINED
15 DIA cae
SW2
DECK 3 CYA coo
FFL 30.970
DECK
FFL 30.470 PROPOSED TREE
1 ELA eum
1 ELA eum PROPOSED PALM/TREE FERN
1 ACM hem
2 ACM hem
ALL UNDERCROFT PLANTING TO OCCUS ONLY
WHERE NATURAL GROWING CONDITIONS WILL
ALLOW.
SW2
PLANTING HATCH IS ONLY A GUIDE FOR SPECIES MIX
17.2m2 MIX E2 (IF CONDITIONS ALLOW TO BE PLANTED).
ALL UNDERCROFT PLANTING AREAS/TREATMENTS
1 ELA eum TO BE CONFIRMED ON SITE. GRAVEL OR MULCH TO
BE UTILISED WHERE SITE CONDITIONS WILL NOT
ALLOW PLANTING.
7 ARC cun (3m,4m,5m)
1 MAC int
98m2 MIX B 54 DIA cae
3.5m2 MIX E1
1 MAC int SHEET DETAILS
1 CUP ana EX
TE 1m 0m 1m 2m 5m
1 ACM hem
78m2 MIX B
NT SCALE: 1:100 @ A1 size sheet
370m2 MIX B OF
W OR
Do not scale from this drawing.
Verify all dimensions on site prior to construction.
All dimensions are in millimetres unless otherwise noted.
76 DIA cae KS AMENDMENT / ISSUE REGISTER
Issue Description Date Sign
P1 PRELIMINARY REVIEW 18.12.07
1 CUP ana OP1 OPERATIONAL WORKS ISSUE 16.01.08
OP1 OPERATIONAL WORKS ISSUE 01.02.08
3 CUP ana P2 PRELIMINARY REVIEW 05.02.08
T1 TENDER ISSUE 06.02.08
OP1 OPERATIONAL WORKS ISSUE 12.02.08
EXT
S ENT
RK
PROJECT
O VIRIDIAN
OFW STAGE 3
T
XTEN
E TITLE
PLANTING PLAN
DRAWING INFORMATION
Design Drawn Date Scale Checked
DH JL 12.02.08 1:100
Project No. Drawing No. Issue
0551 2059.02 L-PP-407 OP1
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Viridian Stage 3 Documentation A3 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 63.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.