Skip to the record
Search everything, all in one place.

Original source · versioned page text

Reference Documents - Stormwater Management Plan & Waste Management Plan - MCU26/0040, OPW26/0066 & RAL26/0013 (As Published)

of 115

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 86, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
6.0 LIMITATIONS AND CLOSURE

This report has been commissioned by RMD Capital Pty Ltd and specifically investigates the
subject site as described in this report.


We consider that the study addresses the requirements for development of the subject site at
the time the study was undertaken. If these conditions are known to change, the results of this
study should be reviewed.


This report is only to be used in full and may not be used to support objectives other than
those set out herein, except where written approval is provided by Barlow Shelley Pty Ltd.


Barlow Shelley Pty Ltd accept no responsibility for the accuracy of information supplied to
them by second and third parties.


Should further information be required please contact the undersigned.



AUTHORED BY




___________________________
EBONY AFIOUNI – Undergraduate Civil Engineer
DipEng(Civil)

APPROVED BY




______________________________________
TIM BURKE – Director
BEng (Civil), CPEng, MIEAust, RPEQ, NER

For and on behalf of:
BARLOW SHELLEY PTY LTD




2576-WMP-01 v2 (April 2026)                                                     Page 11 of 16
EA/TB
Log in to download the original file

Reference Documents - Stormwater Management Plan & Waste Management Plan - MCU26_0040, OPW26_0066 & RAL26_0013 (As Published).pdf · 14.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.