Original source · versioned page text
Reference Documents - Stormwater Management Plan & Waste Management Plan - MCU26/0040, OPW26/0066 & RAL26/0013 (As Published)
Original PDF page 6, section 1. The text section number identifies this passage in the reader.
1.0 INTRODUCTION Barlow Shelley Pty Ltd was commissioned by RMD Capital Pty Ltd to prepare a Site-Based Stormwater Management Plan (SBSMP) for the proposed development located at 18 Taylor Court, Cooroy, Queensland (Lot 2 on SP197517). The 2.01-hectare site, as shown in Figure 1-1, is proposed for the development of 54 industrial tenancies. This SBSMP has been prepared to support a Development Approval on this property. Its primary purpose is to demonstrate that the proposed development complies with the stormwater quantity and quality management requirements of the Queensland State Planning Policy (QLD SPP 2017) and the Noosa Shire Council Planning Scheme. The report outlines the proposed stormwater management strategy, including treatment measures and flow attenuation, to ensure no worsening of downstream conditions. Subject Site Figure 1-1 Locality map of subject site 2576-SBSMP-01_Version 2.0 (April 2026) Page 1 of 23 SX/TB
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.