Reference Documents - Stormwater Management Plan & Waste Management Plan - MCU26/0040, OPW26/0066 & RAL26/0013 (As Published)

of 115

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (14.5 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 81, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
3.2    Recyclable Waste

The Waste Management Planning Scheme Policy does not specify minimum recyclable
waste service levels for low impact industrial development. Recyclable waste volumes have
therefore been calculated using a consistent industry-standard waste generation rate applied
across all stages of development. Recyclable waste volumes generated by the development
are broken down as per Table 2.

                               Table 2 - Recyclable Waste Bin Calculations


               Stage                                           Mixed Recycling
                                     Generation                                  Adopted No. of 2m³
                                                               No. of 2m³ Bins
                                     (m³/week)                                         Bins
 Stage 1                                  1.6                         0.8                1
 Stage 2                                  2.0                         1.0                1
 Stage 3                                  1.0                         0.5                1
 Stage 4                                  2.3                         1.2                1
 Stage 5                                  1.3                         0.6                1
 All Stages Total                         8.2                         4.1                5

The total amount of bins needed to accommodate the general waste generated by the low
impact industrial uses across all stages is 5 (five) 2 cubic litre bins per week




2576-WMP-01 v2 (April 2026)                                                         Page 6 of 16
EA/TB
Log in to download the original file

Reference Documents - Stormwater Management Plan & Waste Management Plan - MCU26_0040, OPW26_0066 & RAL26_0013 (As Published).pdf · 14.5 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.