a*                 .
        7
    ©    INTEGRATED PLANNING ACT 1997                                                                                IDAS Assessment Checklist, Version 20, 2 April 2007
        “Works that take overland flow water "|     12.  Does the application involve works that take overland flow water in a HPA or an FMA?
          ican otend fon i ee e (|                       [JNO                   [_] YES (ensure you have completed Part Ks of Form 1)
        “Self assessable of assessable, or ate exémpt                                                                                .
         from wild river requirements.     ..   + | 43.  IfYES, is the application for works stated in the relevant wild river declaration to be?
        “Ifyou ticked Q13 i), your application must be        ty
         assessed by NRW against the Wid Rivers Code       1] i) assessable works
         and must comply with the code,         |        (ii self-assessable works
          If you ticked Q13 ii) an application is not required ne
        to be made hawaver the works must comply with     LC] iii} exempt works
         the relevant self-assessable section of the Wild
         Rivers Code, otherwise the works: become                                                                  :
         assessable development for which ari application
         is required and must be assessed byNRW                                                        :
         against the relevant part of the Wild Rivers Code           ;                      oo
         and must comply with the code,
        - you ticked Q13:ii) your application is not
         Subject to wild fiver tequirements. Lee                                                                                                               .
         Applications for development that is other than ,
         that Stated to-be assessable, self-assessable or.
          exempt will not be accepted: .       ee          —                  a                  ae                     ne            we
        “Works that interfere With overland °') 14,      Does the application involve works that interfere with overland flow water in a FMA?
        “flow water             fea            Re
         “Fhe relevant udid ver d exiation vil state “2 C] NO                    C1  YES (ensure you have completed Part Kio of Form 1)
         works that interfere with overland flow water that       .              a                      ;                 a.
          are either se¥ assessable, assessable or exempt] 15. If YES, is the application for works stated in the relevant wild rivers declaration to be?
©        from wild river requirements. =." " -  “8       CO   .         bl       k
          Ifyou ticked Q15 i), your application mustbe        i) assessable works
         _assesséd by NRW against the Wild Rivers Code   (1 ii) self-assessable works
          and must comply with the cade! ss"!                 -               :
          Hf you ticked Q15 i) an application is not required LJ iti) exempt works
         to be made however the works must comply with
        - the relevant self-assessable section of the Wild
          Rivers Code, otherwise the works become
         assessable development for which an application
        _ is required and must be assessed by NRW
         * against the relevant part of the Wild Rivers Code
         and must comply with the code. we -
         “If you ticked Q15 ii) your application is not
        ESubject to wild river requirements,
        ~ Applications for development that is other than
        _ that stated to be assessable, self-assessable or   "                                                                  .
         ‘exempt will not be accepted. =                    oe.               _                                     _——                -
         “Waterway barrier works               ~,   |16. Does the application involve building or raising waterway barrier works in a PA?
          Applications for building or raising waterway
         “artes Works in @ HPA wil not be accepted        [_] No               C] YES (ensure you have completed Part Qs of Form 1}
          if you answered YES to Q16, your application
          must be assessed by DPIF- against the Wild | :-
         Rivers Code and must comply with the codé.’           cecueenen a             an                                                     .               oe
©         Aquaculture (non ERA)              _=.117.     Does the application involve aquaculture in a PA?
          aired for aquacubufe in a HPA wil ot s           Cl NO               C] YES (ensure you have completed Part Os of Form 1)
          Ifyou answered YES to Q47, your application
          must bé assessed by DPIE against the Wild ~~
         ‘Rivers Code and must comply with the code, .- |            we             rr                 we                                     a                  we
         Works that interfere with water ina        18.   Does the application involve operational works that interfere with water in a watercourse that is in
         watercourse                                     a nominated waterway in a PA?
         Note: ff thé development is proposed in a HPA,
         - applications forall works that interfere with water LJNo              [1] YES (ensure you have completed the relevant Part K of Form 1)
         “IN a watetcourse (including dams of. weirs,
         -'stream realignment or stream diversion) wilnot | 19 If YES
         “be accepted.                 vi                     1           «stan   |        .                      ;
         In’ BA; appileationé for instream dais and       (_] i) The application is for an instream dam or weir; or
          weirs may be accepted in nominated waterways.       +            ee                   .                 .           .         :                        .
          H you ticked box 8) in Q19, your application wit C] ii) The application is for operational works that interfere with water in a watercourse, and is
          not be accepted.               “                       for development other than a dam or weir,
         . Note: Operational works otttside a HPA or
         ; nominated waterway aré-ot subject to wild
         _ fiver requirements. —              oar
         “More information and locations of rlominated
          waterways is available by contact NRW,
          accessing the department's website -
         www. niw.qid.gov.au or contacting the =                          .
          department by email:on::            hp

                                                                                          Page 13

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001511C5.001.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.