column 1 column 2 Ore) AMS)
" Specific Outcomes Probable solutions (if code assessable) Compliance
attached Housing Zone—soft landscaping is
provided and retained over a minimum of 20% of the
site area.
Roof form
017 Roof forms— : $17.1 The main roof of the building has a roof Complies - most of the building has eaves
a) contribute positively to the local skyline; pitch no less than 5 degrees and has eaves a. apart from two feature walls. These walls are -
b) | complement the character of the locality; minimum of 600mm wide; only 3.5 metres in length and are located to
Cc) use soft and articulated, pitched, skillion or AND , the rear of the site. These walls are indicated
curved roof forms; ~ , by the designer as ‘anchoring’ the building as
d) avoid low pitched (eg. less than 5 degrees) or . the remainder of the structure is well
box profiles/parapets; and articulated and steps extensively across and
- |e) donot create opportunities for residents to down the site.
overlook the private open space areas of
neighbouring properties.
$17.2 Buildings and structures do not include roof | Complies
top terraces.
Flooding and drainage :
018 Buildings and other works are designed and $78.1 Floor levels for habifable rooms are not Not applicable
sited to— less than the specified minimum floor levels;
a) __ provide flood free access to premises and flood | AND
free habitable areas; $18.2 Where Council infrastructure is available— | Complies - development able to drain to
b) allow only minor, short term and infrequent a) any drainage (from buildings and land) existing infrastructure. A separate application
flooding of non-habitable areas; flows to that infrastructure; and for Operational Works will be submitted in this
c) ensure drainage does not adversely impact b) the infrastructure has the capacity to regard.
upon other premises; and accept any additional loading.
d) ensure filling or excavation does not adversely
impact upon other premises by—
i. causing ponding of water on the sife or
nearby land; .
ii. increasing flooding, which adversely
affects the safety or use of any land
upstream and downstream; and .
iii. adversely affecting the flow of water in ;
any overland flow path.
Sloping sites and ridgelines
019 Development on sloping sites— $19.1 Buildings and associated accessways are | Complies - The building steps down the slope
a is responsive to the natural topography of the not constructed on land with a slope greater than | from the Grant Street frontage and has a
* Councit has mapping of minimum floor levels and flood levels for some parts of the Shire. Contact the Land Development Section of Noosa Shire Council.See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001511C5.001.pdfRelated documentPublic source context ↗
07/0799 - MCU - Multiple Housing Type 2 Duplex [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.