      INTEGRATED PLANNING ACT 1997                                                                            IDAS Assessment Checklist, Version 20, 2 April 2007
     Operational work that is tidal work or.|9.     The application involves operational work that is: ( tick the applicable box/es)
      work in coastal management district.)        [7] (i)   tidal work'® as defined under the Coastal Protection and Management Act 1995 (the
      For more information refer to Guide 18. For: «.."                        :            .     .                                  ’
      more information about prescribed fidal work in        Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
    ones            tidal areas refer to ae sca |  (1 (ii)  tidal work that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1; oF
       Inless you answered "none of the above" to Q9,    ns      .        ar                                sgt
     she application requires assessmentby the     (1) {iii} carried out within a coastal management district under the Coastal Act and for - complete
     " Environmental Protection Agency (EPA).               Part M of Form 1 if any box/es (a) to (i) below are ticked.
       anagency other than EPA is the assessment             (1 (a)   constructing or installing works in a watercourse between MHWS and HAT (ie.
     See renoe nny fet tet ciphecken in   -                           other than those works in tidal water) where the development has been determined not
     “Felation'to this matter. ©                                      to be assessable against the Water Act 2000 ;
     Local goverment is the’assessment manager               (J (b)   constructing a canal’? intended to be connected to tidal waters:
     - for all prescribed tidal work.  :                                        .         te
         ae                                                  (1) (c)  constructing an artificial waterway;
2    Ee ce                ee                                 (_] {d)  reclaiming land under tidal water;
     Re                                      .               [_] {e)  disposing of dredge spoil or other solid waste material in tidal water;
     Se                         7                            (1 (f)   interfering with quarry material on State coastal land above high-water mark;
                    ne                                       (1 {g)   draining or allowing drainage or flow of water or other matter across State
     SOP          aS                                                  coastal land above high-water mark;             .
     RESO ce                                                 [J (h)   removing or interfering with coastal dunes on land, other than State coastal land,
      ERE RR EE Ee                         .                          that is in an erosion prone area and above high-water mark;
     “aise                                                   CJ (i)   constructing a bank or bund wall to establish a ponded pasture on land, other
     SEE eg                                 -                         than State coastal land, above high-water mark; or                                  ©
     Sogn               J                    | BIW) noneofthe above                                                    cee
     “ Operatiorial work below high water    -/10.  The application involves operational work thatis: (tick the applicable bores)
     i                                               (J (i) tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
      For more information refer to Guide 18. For                              .             .    .                                  .
      Moré infofmation about prescribed tidal work in        Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
     ene            tidal areas wi to Sute2s         LC  (ii) tidal work that is prescribed tidal work'4 - complete Part P of Form 1; of
     . Unless you answered “none of the above’ to: <.     sae    .        ta                 .            aa             ‘                ‘
     SQ10-the appicaon triggers referral to  ;       C1 (iii) carried out within a coastal management district’ under the Coastal Act and for -
    ‘Queensland Transport (QT) (Maritime Safety                        i     ;                  ;             i              ial in ti        _
     Qld) aa concurence agency,                             CI (a)    cisposing of dredge spoil or other solid waste material in tidal water - complete Part
     Local govemmentis the assessment manager | -       :             Mo   om "
     “for all prescribed tidal work. -                      (_] {b)   reclaiming land under tidal water - complete Part M of Form 1; oF                -
     eee              Tater                 od.             LJ (c)    constructing  a canal'2, if the canal is associated with reconfiguring a lot - complete
     oostie S           .   ota      7    .                                                                :                               9               .
     16g              a                     .                a        Part M of Form 1;
     Be               vite                |         Bl (iv)   none of the above.     -
     Coastal management        =   =.      =. _'| 11. The application involves: (tick the applicable box/es)    |            .
      For more information refer to Guide 18. = | ~~    (i)   a material change of use assessable under a planning scheme involving operational
     . Unless you answered ‘none of the above”to-!:           work carried out completely or     partly in a coastal management district’
                                                                                           y                             9
      Q11, the application requires assessment by the”   .             .       :                                     ~                     .         |
      Erivironmental Protection Agency (EPA), =     CJ (ii)   a material change of use assessable under a planning scheme involving building
      if an agency other-than EPA is the assessment: ‘        work, carried out completely or partly in a coastal management district that is -
      manager for the  application, EPA is a oS                               .                 .     .                                    .
      “concutence agenty for tie application in 6             e the construction of anew premises with a GFA" of atleast 1000m2,
      relation to this matter. ©       25S                    « the enlargement of the GFA of existing premises by more than 1000m?
       ut Aa             oe           ae ag         CJ (iii)  reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
       BEE.                     "        Oe                   completely or partly in a coastal management district
      Pee                     Co                    L] (iv)   reconfiguring a lot’? assessable under schedule 8 of the IPA and in connection with
     oahe                     eo                              the construction of a canal’? — complete Part M of Form 1 -
     Sees                       eh,
     Se                  eth                        RO) nome ofthe above                        ee                                           a

     10 Tidal work is defined in sch 10 of the IPA.
     14 Prescribed tidal work is defined in the Coastal Protectian and Management Regulation 2003 and includes certain idal works completely ot parlly within a local government tidal area.
     42 Canal means canal as defined under the Coastal Profection and Management Act 1995 .
     13 Tidal work is defined in sch 10 of the IPA.
      14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
      15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, ather than an area declared as a
        coastal management district under section 47(2} of that Act.
      16 GFA is defined in sch 14 of the PA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
     17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
        accompanied by the application for the operational works to construct the artificial waterway.
                                                                                    Page 4
   te                                    woe                                           ee                          Se he                              .

Used in these records

About this file

File size
4.5 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001511C5.001.pdf · 4.5 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.