INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
Operational work that is tidal work or.|9. The application involves operational work that is: ( tick the applicable box/es)
work in coastal management district.) [7] (i) tidal work'® as defined under the Coastal Protection and Management Act 1995 (the
For more information refer to Guide 18. For: «.." : . . ’
more information about prescribed fidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
ones tidal areas refer to ae sca | (1 (ii) tidal work that is prescribed tidal work" other than in a canal'2 -complete Part P of Form 1; oF
Inless you answered "none of the above" to Q9, ns . ar sgt
she application requires assessmentby the (1) {iii} carried out within a coastal management district under the Coastal Act and for - complete
" Environmental Protection Agency (EPA). Part M of Form 1 if any box/es (a) to (i) below are ticked.
anagency other than EPA is the assessment (1 (a) constructing or installing works in a watercourse between MHWS and HAT (ie.
See renoe nny fet tet ciphecken in - other than those works in tidal water) where the development has been determined not
“Felation'to this matter. © to be assessable against the Water Act 2000 ;
Local goverment is the’assessment manager (J (b) constructing a canal’? intended to be connected to tidal waters:
- for all prescribed tidal work. : . te
ae (1) (c) constructing an artificial waterway;
2 Ee ce ee (_] {d) reclaiming land under tidal water;
Re . [_] {e) disposing of dredge spoil or other solid waste material in tidal water;
Se 7 (1 (f) interfering with quarry material on State coastal land above high-water mark;
ne (1 {g) draining or allowing drainage or flow of water or other matter across State
SOP aS coastal land above high-water mark; .
RESO ce [J (h) removing or interfering with coastal dunes on land, other than State coastal land,
ERE RR EE Ee . that is in an erosion prone area and above high-water mark;
“aise CJ (i) constructing a bank or bund wall to establish a ponded pasture on land, other
SEE eg - than State coastal land, above high-water mark; or ©
Sogn J | BIW) noneofthe above cee
“ Operatiorial work below high water -/10. The application involves operational work thatis: (tick the applicable bores)
i (J (i) tidal work’ as defined under the Coastal Protection and Management Act 1995 (the
For more information refer to Guide 18. For . . . .
Moré infofmation about prescribed tidal work in Coastal Act) that is not prescribed tidal work - complete Part M of Form 1; or
ene tidal areas wi to Sute2s LC (ii) tidal work that is prescribed tidal work'4 - complete Part P of Form 1; of
. Unless you answered “none of the above’ to: <. sae . ta . aa ‘ ‘
SQ10-the appicaon triggers referral to ; C1 (iii) carried out within a coastal management district’ under the Coastal Act and for -
‘Queensland Transport (QT) (Maritime Safety i ; ; i ial in ti _
Qld) aa concurence agency, CI (a) cisposing of dredge spoil or other solid waste material in tidal water - complete Part
Local govemmentis the assessment manager | - : Mo om "
“for all prescribed tidal work. - (_] {b) reclaiming land under tidal water - complete Part M of Form 1; oF -
eee Tater od. LJ (c) constructing a canal'2, if the canal is associated with reconfiguring a lot - complete
oostie S . ota 7 . : 9 .
16g a . a Part M of Form 1;
Be vite | Bl (iv) none of the above. -
Coastal management = =. =. _'| 11. The application involves: (tick the applicable box/es) | .
For more information refer to Guide 18. = | ~~ (i) a material change of use assessable under a planning scheme involving operational
. Unless you answered ‘none of the above”to-!: work carried out completely or partly in a coastal management district’
y 9
Q11, the application requires assessment by the” . . : ~ . |
Erivironmental Protection Agency (EPA), = CJ (ii) a material change of use assessable under a planning scheme involving building
if an agency other-than EPA is the assessment: ‘ work, carried out completely or partly in a coastal management district that is -
manager for the application, EPA is a oS . . . .
“concutence agenty for tie application in 6 e the construction of anew premises with a GFA" of atleast 1000m2,
relation to this matter. © 25S « the enlargement of the GFA of existing premises by more than 1000m?
ut Aa oe ae ag CJ (iii) reconfiguring a lot assessable under schedule 8 of the IPA where the land is situated
BEE. " Oe completely or partly in a coastal management district
Pee Co L] (iv) reconfiguring a lot’? assessable under schedule 8 of the IPA and in connection with
oahe eo the construction of a canal’? — complete Part M of Form 1 -
Sees eh,
Se eth RO) nome ofthe above ee a
10 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protectian and Management Regulation 2003 and includes certain idal works completely ot parlly within a local government tidal area.
42 Canal means canal as defined under the Coastal Profection and Management Act 1995 .
13 Tidal work is defined in sch 10 of the IPA.
14 Prescribed tidal work is defined in the Coastal Protection and Management Regulation 2003 and includes certain tidal works completely or partly within a local government tidal area.
15 Coastal management district is defined in sch 10 of the IPA and means a coastal management district under the Coastal Protection and Management Act 1995, ather than an area declared as a
coastal management district under section 47(2} of that Act.
16 GFA is defined in sch 14 of the PA to mean the gross floor area. For a definition of how to calculated GFA, go to the planning scheme against which the application is being assessed.
17 Under $117 of the Coastal Protection and Management Act 1995, an application for reconfiguration, where the reconfiguration is associated with the construction of an artificial waterway, must be
accompanied by the application for the operational works to construct the artificial waterway.
Page 4
te woe ee Se he .See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001511C5.001.pdfRelated documentPublic source context ↗
07/0799 - MCU - Multiple Housing Type 2 Duplex [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.