Original source · versioned page text
3018NSCResponse
Attached to the e-mail RAL21/0018 - Information Request Response - 130 Lake Macdonald Drive Cooroy (Email 1 of 3).
The original of this document is very large (11.7 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Issue 5 Stormwater Disposal The proposed Lots are rural residential allotments and as an integral part of rural residential use is the implementation of rainwater tanks to collect stormwater and the construction of dams to collect runoff for use on the property. The Effluent Disposal Report prepared by Global Testing includes the installation of 150mm high diversion bund along the upstream side of the septic irrigation area of Lot 11. The location of the bund is shown on the Stormwater Management Plan prepared by Callaghan & Toth (Drawing No. 2151-01A contained in Appendix D). Please note that this submission completes our response to your Information Request. I thank you for your consideration in this matter. Yours faithfully Max Watterson
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.