07/2125 - Further response to Information Request/Amended Drawings [As Published] · 142007.2125
Fa Nene WABrabeng « Consist gh ing svelte wes \CD-4608 - (B-AFFOVID 489 - Berrangy Wareseete Hopaetlnt? Deawegs - Crt 3 reed CDOECH ST FSC
CATCHME
SEDIMEN'
———| SEDIMENT GASIN 1 (TYPED
NT AREA FoR —Y
BAS +
af
SSFOIMENT BASIN-2
TOTAL CATCHMENT (Abo 2.76ha
ASSUME > 39% OF SOI < 0020
Cy = 0S
SETTUNG VOLUME 1¥$) © 100 0 lga Ger A
100 1 517 2 OS x 776
» Nin’
SETTLING DEPTH © 105
BASIN DIMENSIONS AT BASE [17 RATION
A Tie?
Woe tm
L = 380m
D2 108
Vs 7220"
STORAGE VOLUME « 05 x Vs
#3610"
DEPTH = 05m
PULLW:
18%
Bone
0.028
% sinutes
VWomnsh
on
Cxlea
365 L/aec
epraerey
WEIR FORMULA: @
= OB 166 « Lay
= 1.326 Une
© 0,164)
276b0
‘6 minutes
taesh
048
© 693mRch
hen
tye 18Sam/n
G5 O18
Gy + 1106am/h
2_BTRAND POST AND WIRE
FANE WITH GAFETY MESH
ROCK CHECY DANS TO BE SPACED
NO MORE THAN S0m APART i
LOT 26
SP151406
EARTHWORKS QUANTITIES
CUT ~ 14,7620
LEGEND
19.S-—————-
PROPOSED EARTHWORKS
CONTOURS:
{0.2m INTERVALS)
PROPOSED SED
BASIN CONTOURS
{0 2m INTERVALS}
FILL ~ 25,861m
IMPORTED Fitt OF 11,129m (CUT
VOLUME) WILL BE OBTAINED FROM
GATEWAY RISE SITE
me SF SF SILT FENCE
3 STRAND POST & WIRE FENCE
WITH SAFETY MESH
Bm ROCK EROSION PROTECTION
CONSTRUCTION EXIT/ENTRY
Al REPORT PREPARED BY COFFEY
GEOSCIENCES No. 817974/01-8 DATED
08.07.2006
TRAFFIC CLEANING FACI
6} REPORT PREPARED BY DOUGLAS ITY
PARTNERS No. 33984 DATED 16.08.2006
2} FOR DETAILS OF METHODOLOGY FOR
PROPOSED IN SITU GROUND IMPROVEMENT OF
THE UNCONSOLIDATED FILL ON THE SITE, REFER
TO REPORT SY LANDPAC TECHNOLOGIES No,
P718-01.1A) DATEG AUGUST 2007
(Of CATCH DRAIN
wo
ROCK CHECK DAMS
3
TEMPORARY SEDIMENT BASIN
‘a FILL
ol cut
NOTE:-
LOCATION & LEVELS OF ALL EXISTING SERVICES
TO BE CONFIRMED ON SITE BY CONTRACTOR
PRIOR TO THE COMMENCEMENT OF CONSTRUCTION.
IT IS THE CONTRACTOR'S RESPONSIBILITY TO
PERFORM A DIAL BEFORE YOU OIG SEARCH PRIOR
TO COMMENCEMENT QF WORKS
CONSTRUCTION PHASE SEQUENCE
1, CONSTRUCT SEDIMENT BASIN, SEDIMENT FENCES AND DIVERSION BUNDS.
2. COMMENCE CLEARING AND CONSTRUCT CATCH DRAINS.
3. COMMENCE FILLING AND EARTHWORKS INCLUDING COMPACTION.
&, CONSTRUCTION OF STORMWATER LINES AND GULLIES INCLUDING BACKFILLING AND
COMPACTION
S. TURF STRIPS 900mm WIDE SHALL BE LAID TO BASE OF ALL DOWNSTREAM
EARTHWORKS BATTERS - AND THE REMAINDER OF THE BATTERS SHALL BE TOPSOILED
AND GRASS SEEDED IMMEDIATELY UPON COMPLETION OF EARTHWORKS. AND AT THE
SATISFACTION OF SUPERINTENDENT. EIGHTY PERCENT (80%) GRASS COVERAGE SHOULD
BE ACHIEVED PRIOR TO REMOVAL. SEOIMENT FENCES TO BE REMOVED AFTER
CONSTRUCTION OF ROADS
t
SEDIMENTATION NOTES
1 in SEDIMENT CONTROL DEVICES (SILT FENCES. SPILLWAYS, ROCK CHECK DAMS) TO BE
rece AFTER ALL MAJOR RAINFALL EVENTS AND RECTIFIED AS NECESSARY
if SEDIMENT WATER IS SHOWN TO HAVE SUSPENDED SOLIDS > SOmg/Lt. THEN THE USE OF
A FLOCCULANT IS TO BE APPLIED AS DIRECTED BY SUPERINTENDENT PRIOR 70 THE BASIN
BEING LOWEREO.
THE BASIN IS TO BE ORAINEO BY OPENING THE VALVE OR UNPLUGGING THE END OF THE
QUTLET PIPE. ONCE DRAINED THE OUTLET PIPE WILL BE PLUGGED AGAIN.
THE FIELD TEST JS :- FILL A CLEAR 65mm SOFT DRINK BOTTLE WITH BASIN WATER
IF YOU CAN NOT SEE CLEARLY THROUGH THE SAMPLE, THEN A
FLOCCULANT NEEOS 10 BE APPLIED.
THE PH OF THE WATER MUST BE IN THE RANGE 6.5 to 8.5 PRIGR TO DISCHARGE. IF THE
RESULTS ARE OUTSIDE THESE LIMITS THE SUPERINTENDENT IS TO BE NOTIFIED AND HE
WILL ADVISE ON TREATMENT.
2.
3 OUTLET BAFFLE - POSTS 100mm - AT tm CRS SET 600mm DEEP WITH SEGIMENT FENCE
FABRIC
. INLET BAFFLE - POSTS 100mm - AT Im CRS SET 600mm OFEP WITH SEDIMENT FENCE FABRIC
WITH SOmm HOLES CUT AT 300mm CRS
5. SEDIMENT BASINS TO GE INSPECTED AT LEAST ONCE EVERY WEEK AND DE-SILTED AFTER
EACH MAJOR STORM EVENT OR AS DIRECTED BY SUPERINTENDENT
. THE FINAL LOCATION OF SILTATION ANO EROSION CONTROL DEVICES MAY 8E ADJUSTED AS
a 10 20 x 6
z Sar SCALE 1500 (An NECESSARY ON SITE BY THE SUPERINTENDENT.
E Design AURESCU CSart
; Stuctan Exgnoers (@\ [ome BUNNINGS GROUP LIMITED
ELC _[ ROOSA COUNCIL FORMATION REQUEST Tw 13.12.07 & Project Managers *, Checked PSMALONEY | Project
38 [ GoTEGReCAL COrENTS ADDED a (Seu su 23 00 743 632 SES BUNNINGS WAREHOUSE NOOSAVILLE
ine Ee gee CONSULTING WOT FOR CONSTR
é UCTION
2[ et [seo Fn coe 2 one wal ow ese ote Benbane AER o, | $91872 SEDIMENT BASIN 1 AND Drawing Ne. Fev
z' Arondaenis iy Z Amores By Ph: [07) 3893 (Date 09.10.07
z f
: THES DRAWING CARNOT BE COPIED OR REPRODWCED OY ANY FORM OR USED FOR ANY OTHER PURPOSE OTHER THAN THAT ORIGNALLY PITENDED WITHOUT THE WRITTEN PERMISSION OF GHD CONSULTING PTY LTD. Coe eS rot Deveson ae Peianerse sees eetom aus bad] Data AND. EROSION CONTROL PLAN CB0849 £scot| C
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2125 - Further response to Information Request/Amended Drawings [As Published]Related documentApplication case desk ↗
About this file
- File size
- 718 KB (small file)
- File type
No other editions are linked here.