07/2125 - Further response to Information Request/Amended Drawings [As Published] · 142007.2125

of 8

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

Hig teane 1ACO-4108 - CD-SEPEO-99L Beara Waretonse Woysavtie\? Drawings = CoriN Tas ACURA ETE

 

 

 

 

 

 

 

 

 

2 s is ro 2 ay
i a a i

es

SCALE 1:400 [A1}

CATCHMENT AREA FOR
SEDIMENT BASIN 2

ILOT 26
SP151406

 

  

 

io) o—— cr_—— co TH —_—_—— 0 o ao
Ca ~
a
3
2
f a

REFER DWG CB0849-C01

 

SEDIMENT BASIN 2 (TYP.

 

CATCHMENT AREA = = 0.75ha
T = 9 minutes

103mm/h

0.63

= W35L75

  

|
c
a
SETTLING AREA A = 3400 x Q = 460m"

SETTLING DEPTH = 0.6m

BASIN DIMENSIONS AT SURFACE (1:2 RATIO}
A = 480m

w 16.0m

L 300m

0 o.6m

nae

SETTLING ZONE
O = 06m
Vs = 256m°
STORAGE VOLUME =
2 256m
OEPTH = 0.58m
———————_——— I

10 x Vs
.

 

 

 

 

   
           

  

 

—_—
8

SETTLING ZONE———q

CENTRE SPILLWAY

 

 

 

 

 

 

 

——— OUTLET
= PROTECTION

 

 

 

 

 

 

 

 

 

 

 

 

SECURE GEOTEXTILE TO GABIONS
WITH 20MM TO 30MM AGGREGATE
OR OTHER MEANS

SEDIMENT STORAGE ZONE

SEDIMENT SETTLING ZONE

 

GABION EMBANKMENT

NEEDLE-PUNCHED GEOFTEXTILE

CREST OF SPILLWAY

OUTLET PROTECTION

 

q 600MH

Vt yy

 

 

550

 

mu

~

 

SPILLWAY
S00MM MIN. = —

DOWNSTREAM ELEVATION

NOTES.

 

SECTION

 

\ 5

NEEDLE-PUNCHED GEOTEXTILE

+ REMOVE ALL VEGETATION AND TOPSOIL FROM UNDER THE DAM WALL AND FROM WITHIN THE STORAGE

AREA

2 EXCAVATE TO 300MM DEPTH FOR DAM BASE AND FORM A LEVEL BASE FOR THE GABIONS
LINE THE EXCAVATION WITH A NEEDLE PUNCHED GEOTEXTILE ALLOWING SUFFICIENT GEOTEXTILE TO

3 LINE FROM THE TOE OF THE DAM, UNDER THE WALL, OVER THE UPSTREAM GABIONS AND SPILLWAY TO

t

500MM BELOW THE SPILLWAY EXIT ON THE DOWNSTREAM FACE
WALL PROFILE AND OUTLET PROTECTION SHALL BE MADE UP OF GABION UNITS FILLED WITH GRADED

ROCK AS SPECIFIED ON SWMP

& CONSTRUCT A SPILLWAY 500MM BELOW THE CREST

THE SWMP

S LAP THE GEOTEXTILE OVER THE UPSTREAM FACE AND THROUGH THE SPILLWAY AND FIX

WITH THE TOP ROW OF GABIONS

OF THE DAM ANO FOR THE WIDTH SPECIFIED ON

IN PLACE

6 COVER THE UPSTREAM FACE AND GEQTEXTILE WITH 20MM TO 30MM GRAVEL
7 PLACE A "FULL OF SEDIMENT” MARKER TO SHOW WHEN LESS THAN DESIGN CAPACITY OCCURS AND

SEDIMENT REMOVAL IS REQUIRED

8 REPLACE UPSTREAM GEOTEXTILE LAYER EACH TIME SEDIMENT 1S REMOVED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

el
=
. Desk CPAUNERCY Cinet
; BMD Struc Enews (QV | rina BUNNINGS GROUP LIMITED
t Managers Checked
jl $e eer ane BUNNINGS WAREHOUSE NOOSAVILLE
5] _| NOOSA COUNCR, @FORMA TION REQUEST TwH | op | 131207 CONSULTING Approved By Tite WOT FOR CONSTRUCTION!
§ ‘4 _| eesuep For APPROVAL on | on [own Sota, mun sisane usbane NPER Mo | 191872 SEDIMENT BASIN 2 AND Drawing No. Rev
Te funondmants By | ava | bate [no ‘Arneodmenis dete Vimminanter WT) Fatannene tas | EROSION CONTROL PLAN
z “THES ORAWIG CABNOT GE COPED OR REPRODULED I ANY FORM Of USED FOR ANY OTHER PURPOSE OTHER THAN THAT OFOGINALLY INTENDED WITHOUT THE WRITTEN PERFUSION OF BHD CONSULTING PTY LTO Ome an wan betopan tan anne bad] Dean AWD. CB0849 €5c03; B

 

 

Used in these records

About this file

File size
718 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

07_2125 - Further response to Information Request_Amended Drawings [As Published].pdf · 718 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.