Original source · versioned page text
Delegated Report - Code - Planning MCU22 0204
Author Development Engineer, Diogo Carrico Development Assessment APPLICATION DETAILS Application No. MCU22/0204 & OPW22/0306 Applicant Denise Elizabeth Robertson William George Alexander Robertson Proposal Material Change of Use – Landing – Residential Development Permit for Operational Works – Prescribed Tidal Works – Pontoon Properly Made Date 1 December 2022 Information Request Date Not Applicable Information Response Date Not Applicable Decision Due Date 29 March 2023 Report Completed Date 1 March 2023 Report Reviewed By Daniel Epps – 2 March 2023 PROPERTY DETAILS Property Address 29 Mossman Ct Noosa Heads Qld 4567 RP Description Lot 79 N 21847 Land Area 608 m² Existing Use of Land Residential STATUTORY DETAILS SEQRP Designation Urban Footprint Zone Low Density Residential Precinct Not Applicable Local Plan Area Not Applicable Overlays Acid Sulphate Soils (Zone 1); Landslide Hazard; Flood Assessment Type Code PROPOSAL The application seeks approval for a Material Change of Use – Landing – Residential and Development Permit for Operational Works – Prescribed Tidal Works – Pontoon. The proposal plan is included below. Figure 1 – Proposal Plan site details Background The applicant seeks to install a pontoon system to replace the existing jetty. The works are proposed generally in the same area as the existing structure. The application documentation is comprehensive and the proposal complies with all the requirements of the Waterways Works Code – no Information Request was required. Site Description Surrounding Land Uses assessment Instruments for Statutory Assessment Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017; and Noosa Plan 2020. Noosa Plan 2020 The following codes from the Noosa Plan 2020 are applicable to this development: Waterways Works Codes. cONSULTATION Referral Agencies The applicant was referred to the following Referral Agencies: Department of Infrastructure, Local Government and Planning (SARA) The Department is a referral agency for tidal work or works in a coastal management district. The Department has responded on 8 February 2023 advising that the application was supported subject to conditions. Internal Council Referrals The application was forwarded to the following internal Council officers for review and/or comment: Planning Officer conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 63(5) of the Planning Act 2016. RECOMMENDATION With regard to Application No MCU22/0204 for a Material Change of Use – Landing – Residential and OPW22/0306 for Operational Works – Prescribed Tidal Works – Pontoon, situated at 29 Mossman Ct Noosa Heads Qld 4567 and described as Lot 79 N 21847, it is recommended the application be approved in accordance with the following details for the Decision Notice: application details Application No: MCU22/0204 & OPW22/0306 Street address: 29 Mossman Ct Noosa Heads Qld 4567 Real property description: Lot 79 N 21847 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details Council decided to issue the following type of approval: Development Permit for Material Change of Use – Landing – Residential and for Operational Works – Prescribed Tidal Works – Pontoon CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions Approved Plans Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date TJS-04770-01 A Site Plan, Layout Plan & Water Allocation Prepared by EDGE Consulting Engineers As Annotated by Council 10/02/2022 TJS-04770-02 B Elevation Prepared by EDGE Consulting Engineers 13/10/2022 JSP-GW-006 M Standard Catwalk Construction Prepared by EDGE Consulting Engineers 14/01/2021 JSP-SD-102-1 A Pile Bracket Construction to Suit Ø315 Piles & 6 Roller Bracket Prepared by EDGE Consulting Engineers 23/09/2019 JSP-SD-045 E Concrete Insitu Pile Construction 315 & 400 Diameter Reinforced Prepared by EDGE Consulting Engineers 09/09/2020 JSP-SD-212 D FRP Reinforced Pontoon Construction Standard Flat Deck and Float a Boat Pontoons Prepared by EDGE Consulting Engineers 09/09/2020 Currency Period The Currency Period for this development approval lapses if all conditions have not been complied with by 2 March 2025, unless an application to extend the currency period is approved by Council. Performance Bond Security in the form of a cash bond or trading bank guarantee to the sum of $2000 must be submitted to Council, to secure performance of all conditions of this approval, prior to the commencement of the works. The cash bond or trading bank guarantee will be returned on performance of the conditions of this approval less any costs incurred by Council in respect of enforcing performance of this permit. Council reserves the right to call upon the bond or guaranteed sum to effect compliance with conditions. General Conditions The landing must use materials, natural finishes and colours that blend with the surrounding natural landscape. The maximum number of vessels that may be berthed, moored, attached or stored on the structure(s) must not exceed 2. Vessels must be connected directly to the pontoon, and not located side by side or in tandem with another vessel. The use of the pontoon must not cause any adverse effects on the amenity of the surrounding area including changes to light, views, air quality and noise. Vessels berthed/moored at the pontoon must be located a minimum of 1.0 metres from the prolongation of the property boundaries. All structures must be designed and constructed such that they are free standing within the waterway and are not connected to or behind the revetment wall. All structures must have no detrimental effects on stormwater drains and/or easements. A rigid handrail must be fitted on at least one side of the gangway. The handrail must be of an open design and in accordance with the approved plans. No boatlifting devices are to be attached or moored at the pontoon structure for the purpose of elevating a vessel above the water without Council approval. There must be no electrical reticulation system carrying electricity in excess of 24 volts beyond the revetment wall unless all switches and power outlets are positioned above the 1%AEP flood level. Lighting associated with the use must be designed, installed, operated, and maintained in accordance with Section 3 of AS4282 Control of the Obtrusive Effects of Outdoor Lighting. The pontoon is to be used for private purposes only with no commercial operations to be undertaken. Boat repair activities are not permitted on site. Wastewater and sullage must only be disposed of at approved pumpout facilities. The mooring facility must not be utilised for live-aboard purposes. Any construction and post construction activity is not to impact on the condition of the waterway, and is to be conducted so as not to breach the Environmental Protection Act EPA (1994) and the Environmental Protection (Water) Policy 2009. Certification by a Registered Professional Engineer of Queensland that states that the pontoon and gangway are constructed in accordance with best practice methods and are structurally sound must be submitted to Council. This certification must be submitted to Council within three (3) months of the completion of the works. A final inspection and approval of the structure by Council’s Inspector is also required. Please contact Council’s Development Assessment Branch on 5329 6500 to arrange the inspection. This approval lapses where the construction of the pontoon has not commenced within two (2) years of the date of issue of the approval, unless application is made and approved by Council for an extension. After completion, the proposed works must be maintained in a sound state of repair in accordance with the approved plans referral agencies The referral agencies applicable to this application are: Referral Status Referral Agency and Address Referral Trigger Response Concurrence SARA at DILGP Via MyDAS2 at https://prod2.devassess. qld.gov.au/suite/ (for assistance, contact DILGP at 5352 9701 or email:[email protected] Planning Regulation 2017 Schedule 10, Part 17 – Tidal Works or Works in a Coastal Management District The agency provided its response on 8 February 2023(Reference No. 2302-33160 SRA). A copy of the response is attached Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. The approval or conditions do not absolve the owner of the land from complying with all the conditions of this approval and/or relevant Council By-Laws and Policies and/or relevant statues and/or statutory regulations in the execution and/or performance of said works. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. property notes Not applicable. VARIATION approval details Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. [word/footer1.xml] Page 7 of 7 [word/header1.xml] 3 [word/header2.xml] DEVELOPMENT ASSESSMENT DELEGATED REPORT [Attachment: image1.png (image text)] poe p01 $4 RETANNG WAL busing Je nt common yer — = = = fore ee moet a) vee 00 0 osins_ “| 18 cast wun rvneR meee em 1) B ' omy ine soem css “4 PE em mm mm EEE = ALL ay nut ce eas ‘HP oxtoos gb 20 —4 T \ i : es | i sf lor ' _- / i wr7 22 it 9 Soe N21847 ' ao Naty mes fain : suse ouoKT apy | | | : vse We i 2008 4 3 25r18'95" ! & 2 : a ) 5 +MOSSMAN CRT> | g 7 SITE PLAN & | WATE ° vn | nara eg | te || i \ PROPERTY BOUNONEY aRDEN en LAYOUT PLAN cp. N21e47 - SCALE 1:100 i NOTES: DES UE LoADINGs FRING: Pontoon = 1skPe Mins WET VESSEL LENGTH = 26m cxrwin = 32 Mavi WET VESSEL BE ~ Sm [STNG STRUCTURES SOHN I APPROX POSTON sewcirearons: Graeen cououR © — —UGHT GREY Catwalk Deca ALUM & CART unos FENDER co.ous— WHE Pontoon Pus & ces — WHT tiger or [UBD FE SATOH, + SHOE 15 aNP CPO FOR CONSTRUCTION a ‘WGA & DE ROBERTSON re 7 | eae sel LOT 79 (29) MOSMAN CRT ae a ei SPECIALS NOOSA HEADS WATER ALLOCATION ti on rans cn EK 2 PROPOSED PONTOON & CATWALK 1S-04770-01 A a rN ta ay) pare — [a 8 sentih cena enon [Attachment: image3.png (image text)] \ Density a = Tourist Accommodation Cenvre centre ¥ Local Centre impact industry 4 > 3 Recreation and Open Space , SEX. y \ x community Label Legend 4 overiay Maps Plan Maps \ i raft Noose Plan 2020 \ ] @F NBN Network - Connections by technology type July 2 7 Network Base Stations 3) Panning d \ \ Tourist and short term accommodation A J
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.