Attachment 2 - Advice from Ecoteam Environmental · 132006.1395.05
(c) The layout of roads and structures under the change plan for the
development generally retains a greater permeability for koalas
than the existing approved plan;
I recommend that the following condition be added to an approval of the
change plan;
Any operational works application for clearing of vegetation must
include a vegetation management plan that;
(i) makes provision for the removal of all weeds, introduced
species and vines through the trunk and canopy of E.
robusta trees;
(ii) makes provision for compensatory planting of koala habitat
trees within the site to replace the loss of E. robusta trees
as a result of the development.
(iii) an updated koala management plan be provided that
reflects best practice koala management at the time of
operational works.
Conclusion
It is to be recognised that the part of the site the subject of the approval is
zoned for semi-attached housing uses.
Despite its presently degrading koala habitat, the change plan and
conditions provide an opportunity to enhance and rehabilitate the koala
habitat. This is consistent with overall outcome 13.7.2(c) of the
Biodiversity Overlay Code.
The change plan has changed the layout of roads and structures in the
existing approval which has reduced by more than 50% the number of
koala trees that would have been impacted. The change plan achieves
better connectivity and linkage of koala habitat than would occur under
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Advice from Ecoteam Environmental.pdfRelated documentApplication case desk ↗
About this file
- File size
- 6.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.